Nội dung

Performance measurements in place and being reviewed carefully by the steering 5-3.. tion, and operating ERP at a Class A level is one of the best ways toThe ERP Operating Committee Afte

Trang 1

TASKS TO BE COMPLETED IN MONTH 3

Complete

3-1 Series of business meetings conducted for

3-2 Series of business meetings conducted by

project team people for all other persons

3-3 Enthusiasm, teamwork, and a sense of

ownership becoming visible throughout

3-4 Inventory record accuracy, including

scheduled receipts and allocations, at 95

percent or better for all slice items

3-5 All slice bills of material at least 98

per-cent accurate, properly structured, and

3-6 All item data for slice products and

com-ponents, plus any necessary work center

data, complete and verified for

TASKS TO BE COMPLETED IN MONTH 4

Complete

4-1 Executive steering committee

authoriza-tion to implement master scheduling

(MS) and Material Requirements

Plan-ning (MRP) on the slice products and

4-2 Master scheduling and MRP operating

300 ERP: M I H

Trang 2

4-3 Plant schedules, and kanban where

ap-propriate, in place and operating

4-4 Feedback links (anticipated delay

report-ing) in place for both plant and

5-2 Performance measurements in place and

being reviewed carefully by the steering

5-3 Audit/assessment II completed; next

Quick Slice or other improvement

Trang 4

PART IV

Beyond ERP Implementation

Trang 6

Chapter 15

Operating ERP

Imagine the feelings of the winning Super Bowl team What a kickthat must be! They’ve reached their goal They’re number one.Now, imagine it’s six months later The team, the coaches, and theteam’s owner have just held a meeting and decided to cancel thisyear’s training camp Their attitude is who needs it? We’re the best inthe business We don’t have to spend time on fundamentals—thingslike blocking, tackling, and catching footballs We know how to dothat We’ve also decided not to hold daily practices during the sea-son We’ll just go out every Sunday afternoon and do the same things

we did last year

Does this make any sense? Of course not But this is exactly theattitude some companies adopt after they become successful ERPusers Their approach is: This ERP thing’s a piece of cake Wedon’t need to worry about it anymore Wrong, of course No Class

A or B ERP process will maintain itself It requires continual tention

at-There are two major objectives involved in operating ERP:

1 Don’t let it slip

2 Make it better and better

It’s easy to let it slip Some Class A companies have learned this

305

Trang 7

INITIAL EDUCA

Trang 8

lesson the hard way They’ve “taken their eye off the ball,” and sumed that ERP will maintain itself In the process, they’ve lost aletter grade They’ve slipped to Class B (Companies who achieveClass B and make the same mistake can become Class C veryquickly.) Then comes the laborious process of reversing the trendand re-acquiring the excellence that once was there The flip side ofthese experiences is represented by the excellent ERP user compa-nies Their attitude is: “We’re Class A, but we’re going to do betternext year than we did this year We’re not satisfied with the statusquo Our goal is to be even more excellent in the future than we arenow.”

as-How should a company address these issues? as-How can they not let

it slip? What’s involved in making it better and better?

Five important elements are involved:

ex-They had arrogance; they lacked understanding ex-They also lacked

any real chance of becoming next year’s Super Bowl champions.Operating at a Class A level is much the same A company needs

to understand that:

• Today’s success is no guarantee of tomorrow’s

• People are the key

• The name of the game is to win, to be better than the

Trang 9

tion, and operating ERP at a Class A level is one of the best ways to

The ERP Operating Committee

After implementation is complete, the ERP project team should main in place, with the following changes:

re-1 The group now has no full-time members; therefore, it’s ably a bit smaller than it was Its membership is now at or near

prob-100 percent department heads

2 Because ERP is no longer a project but is now operational, thename of the group might be changed to ERP operating com-mittee or something along those lines

3 Group meetings are held about once a quarter rather thanonce a week

4 The chairmanship of the group rotates among its members,perhaps once or twice a year First, a marketing managermight be the chairperson, next a manager from accounting,then perhaps someone from engineering or purchasing Thisapproach enhances the collective sense of ownership of ERP

It states strongly that ERP is a company-wide set of processes.

The group’s job is to focus formally on the performance of theERP processes, report results to top management, and develop andimplement improvements

Spin-off Task Forces

Just as during implementation, these temporary groups can be used

to solve specific problems, capitalize on opportunities, and so forth

308 ERP: M I H

Trang 10

The Executive Steering Committee

Following implementation, the executive steering committee shouldmeet about once every six months.1It receives updates on perform-ance from the ERP operating committee Its tasks are much the same

as during implementation: reviewing status, reallocating resourceswhen necessary, and providing leadership

Measuring the effectiveness of ERP performance requires both erational and financial measurements Let’s look at operationalmeasurements first

op-Operational Measurements—The ABCD Checklist

for Operational Excellence 2

Section 5 of the ABCD Checklist is the essential operational surement of “how we’re doing” operating ERP

mea-This part of the ABCD Checklist should be reviewed by the ERPoperating committee formally, as a group, at least twice a year.Agreement should be reached on each of the 22 overview questions.For any answer that’s lower than excellent, this group should fo-cus on:

1 What’s causing the no answer? What’s going wrong? Use thechecklist’s detailed audit questions for diagnosis

2 What’s the best way to fix the problem? Does the problem ist only within one department? If so, that department man-ager should be charged with correcting the problem On theother hand, if the problem crosses departmental boundaries,should the company activate a spin-off task force?

ex-3 How quickly can it be fixed? (Set a date—don’t let it drift.)

ex-ecutive staff meeting.

Wight ABCD Checklist for Operational Excellence (New York, NY: John Wiley &

Sons, 1992).

Trang 11

Each time the ABCD Checklist is reviewed, the results are mally communicated to the executive steering committee: the scoreachieved, the class rating (A, B, C, etc.), what the no answers are,what’s being done about them, and what help, if any, is needed fromtop management.

for-Who does this communication? for-Who presents these results? Thepart time successor to the full-time project leader In other words, thechairperson of the ERP operating committee

Some companies do a formal re-certification once per year Once

a given business unit hits Class A, their challenge is, first, to staythere and, second, to get better and better The Class A certification

is good for only one year, and then it must be “re-earned.” We dorse this approach It’s so easy to let things slip with so manythings competing for attention Re-certification helps to really fo-cus attention once per year, and “get everyone’s heads” back intoERP

en-Operational Measurements—Other

Listed below is a series of detailed technical measurements, not plicitly covered in the ABCD Checklist, relating to the specific ope-ration of certain ERP functions This list will probably not be 100percent complete for any one company, and, further, it containssome elements that may not apply in some organizations We includethem here to serve as a foundation for companies, to be used alongwith the ABCD Checklist, in developing their own measurementsprogram

ex-In master scheduling, some companies measure:

1 Number of master schedule changes in the emergency zone.This should be a small number

2 Master schedule orders rescheduled in compared to thoserescheduled out These numbers should be close to equal

3 Finished goods inventory turnover for make-to-stock tions

opera-Typically, the first two of these measurements are done weekly, andthe third monthly In Material Requirements Planning, check on:

310 ERP: M I H

Trang 12

1 Number of stock outs for both manufactured and purchaseditems.

2 Raw material and component inventory turnover, again forboth make and buy items

3 Exception message volume This refers to the number of tion recommendations generated by the MRP program eachweek For conventional (fabrication and assembly) manufac-turers, the exception rate should be 10 percent or less For pro-cess and repetitive plants, the rate may be higher because ofmore activity per item (The good news is that these kinds ofcompanies usually have far fewer items.)

ac-4 Late order releases—the number of orders released within lessthan the planned lead time A good target rule of thumb here

is 5 percent or less of all orders released

5 Production orders and supplier orders3rescheduled in versusrescheduled out Here again, these numbers should be close toequal

Except for inventory turns, most of these measurements are doneweekly Typically, they’re broken out by the planner including, ofcourse, the supplier schedulers

In Capacity Requirements Planning, some companies track thepast due load Target: less than one week’s work Frequency: weekly

In plant floor control, the following are frequently measured:

1 On-time production order completions, to the operation duedate A good measurement here is to track late jobs in (arriv-ing) to a work center compared to late jobs out (completed).This recognizes that manufacturing departments shouldn’t bepenalized for jobs that arrive behind schedule Some compa-nies expand this to track total days of lateness in and outrather than merely members of jobs This helps to identifypeople who may be making up some of the lost time even whenjobs are completed late

schedule and, for those items not yet being supplier scheduled, conventional chase orders.

Trang 13

pur-2 Capacity performance to plan Standard hours of actual put compared to planned output A good target: plus or mi-nus 5 percent.

out-The frequency of the above: weekly; the breakout: by ing department Please keep in mind these are ERP-related meas-urements only, and are not intended to replace measures ofefficiency, productivity, and others

manufactur-For purchasing, we recommend measuring stock outs and tory turns on purchased material by supplier and by buyer, as well asfor the supplier schedulers as mentioned above Here, also, don’t neg-lect the more traditional important measurements on quality, price,and so forth

inven-For data, we recommend weekly reports on the accuracy of the ventory records, bills of material, and routings The targets for allshould be close to 100 percent

Failure to establish an airtight ongoing education program is a jor threat to the long-term successful operation of ERP Ongoing ed-ucation is essential because:

ma-New people enter the company.

Plus, current employees move into different jobs within the pany, with different and perhaps expanded responsibilities Failure

com-312 ERP: M I H

Trang 14

to educate these new job incumbents spells trouble It means thatsooner or later the company will lose that critical mass of ERP-knowledgeable people The company then will be unable to operateERP as effectively as before.

People tend to forget.

They need refresher education and training To borrow a conceptfrom the physical sciences, there’s a half-life to what one learns Ifthat half-life is one year, people will remember about half of whatthey learned about ERP last year, 25 percent from two years ago

Business conditions change.

For any given company, its operating environment three yearsfrom now will probably differ substantially from what it is today.Companies develop new product lines, enter new markets, changeproduction processes, become subject to new governmental regula-tions, acquire new subsidiaries, find that they’re operating in a buy-ers’ market (not a sellers’ market), or vice versa, and on and on andon

Operating ERP means running the business with the ERP set of tools, which tends not to change.

However, business conditions do change It’s necessary

periodi-cally to match up the tools (ERP) to today’s business environmentand objectives These may be quite different from what they were afew years ago when ERP was implemented

What’s needed is an ongoing process.

That is, one where people can review the tools they’re using to dotheir jobs, match that up against today’s requirements, and ask them-selves, “Are we still doing the right things? How might we use thetools better? How could we do our jobs differently to meet today’schallenges?” We’re back to behavior change (See Chapter 7.) It’snecessary after implementation, as well as before And the way to fa-cilitate behavior change is via education

Trang 15

Ongoing ERP education should be woven tightly into the tional fabric of the company Minimum ERP educational standardsshould be established for each position in the company, and writteninto its job specification New incumbents should be required tomeet these standards within a short time on the job How can on-going ERP education be woven into the operational fabric of thecompany? Perhaps it can best be done by involving the folks in hu-man resources In the H.R office, there are files for each employee.Checklists are maintained there to help ensure that employees havesigned up for programs like health insurance, the blood drive, andthe United Fund Given these files and these checklists, the humanresources department may be the best group to administer the ongo-ing ERP educational program, schedule people into classes, track at-tendance, and report and reschedule no-shows.

opera-Let us add a word about ongoing education for top management

A change in senior management, either at the CEO level or on his orher staff, is a point of peril for ERP If the new executive does not re-ceive the proper education, then he or she will, in all likelihood, notunderstand ERP and may inadvertently cause it to deteriorate Newexecutives on board need ERP education more than anyone else.This requirement is absolute and cannot be violated if the companywants to operate ERP successfully over the long run Here, also, thiscritically important educational requirement should be built directlyinto the executive’s job specifications as a hard-and-fast rule with nolatitude permitted

Lean Manufacturing (formerly called Just-in-Time) is arguably thebest thing that ever happened to ERP The reason? Because LeanManufacturing, done properly, will not allow you to neglect yourERP processes

Let’s take the case of a company that first implements ERP cessfully, and then attacks Lean Manufacturing.4Let’s say the com-pany allows ERP to slip, to deteriorate—perhaps by not keeping theinventory data accurate, or by not managing demand properly, or by

suc-314 ERP: M I H

Manu-facturing first Some companies implement them simultaneously.