1. Trang chủ
  2. » Tất cả

Lecture operations management chapter 11 aggregate planning and master scheduling

7 4 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề Aggregate Planning and Master Scheduling
Trường học McGraw-Hill/Irwin
Chuyên ngành Operations Management
Thể loại lecture notes
Năm xuất bản 2012
Định dạng
Số trang 7
Dung lượng 1,51 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Aggregate Planning and Master Scheduling McGraw­Hill/Irwin Copyright © 2012 by The McGraw­Hill Companies, Inc.. Explain what aggregate planning is and how it is useful 2.. Identify the

Trang 1

Aggregate Planning  and Master Scheduling

McGraw­Hill/Irwin         Copyright © 2012 by The McGraw­Hill Companies, Inc. All rights reserved.

Trang 2

1. Explain what aggregate planning is and how it is useful

2. Identify the variables decision makers have to work with in aggregate 

planning and some of the possible strategies they can use

3. Describe some of the graphical and quantitative techniques planners 

use

4. Prepare aggregate plans and compute their costs

5. Describe the master scheduling process and explain its importance

11-2

Student Slides

Trang 3

Intermediate­range capacity planning that typically covers 

a time horizon of 2 to 18 months

Useful for organizations that experience seasonal, or other 

variations in demand

Goal:

Achieve a production plan that will effectively utilize the 

organization’s resources to satisfy demand

11-3

Student Slides

Trang 4

Student Slides

Trang 5

Maintaining a steady rate of regular­time output while 

meeting variations in demand by a combination of options: 

 

inventories, overtime, part­time workers, subcontracting, and 

back orders

Matching capacity to demand; the planned output for a 

period is set at the expected demand for that period.

11-5

Student Slides

Trang 6

requirements over the planning horizon

Advantages

Investment in inventory is low

Labor utilization in high

Disadvantages

The cost of adjusting output rates and/or workforce levels

11-6

Student Slides

Trang 7

horizon

Stable output rates and workforce

Greater inventory costs

Increased overtime and idle time

Resource utilizations vary over time

11-7

Student Slides

Ngày đăng: 27/02/2023, 07:28