Aggregate Planning and Master Scheduling McGrawHill/Irwin Copyright © 2012 by The McGrawHill Companies, Inc.. Explain what aggregate planning is and how it is useful 2.. Identify the
Trang 1Aggregate Planning and Master Scheduling
McGrawHill/Irwin Copyright © 2012 by The McGrawHill Companies, Inc. All rights reserved.
Trang 21. Explain what aggregate planning is and how it is useful
2. Identify the variables decision makers have to work with in aggregate
planning and some of the possible strategies they can use
3. Describe some of the graphical and quantitative techniques planners
use
4. Prepare aggregate plans and compute their costs
5. Describe the master scheduling process and explain its importance
11-2
Student Slides
Trang 3Intermediaterange capacity planning that typically covers
a time horizon of 2 to 18 months
Useful for organizations that experience seasonal, or other
variations in demand
Goal:
Achieve a production plan that will effectively utilize the
organization’s resources to satisfy demand
11-3
Student Slides
Trang 4Student Slides
Trang 5Maintaining a steady rate of regulartime output while
meeting variations in demand by a combination of options:
inventories, overtime, parttime workers, subcontracting, and
back orders
Matching capacity to demand; the planned output for a
period is set at the expected demand for that period.
11-5
Student Slides
Trang 6requirements over the planning horizon
Advantages
Investment in inventory is low
Labor utilization in high
Disadvantages
The cost of adjusting output rates and/or workforce levels
11-6
Student Slides
Trang 7horizon
Stable output rates and workforce
Greater inventory costs
Increased overtime and idle time
Resource utilizations vary over time