College of EngineeringInterdisciplinary Education & Research Building... > Increase undergraduate enrollment by 1,000 and the addition of 40 tenure-track faculty inc.. associated researc

Trang 1

College of Engineering

Interdisciplinary Education & Research Building

Trang 2

> Increase undergraduate enrollment by 1,000 and the addition of 40 tenure-track faculty (inc associated research space)

> Create a student-focused interdisciplinary center enabling the college

to promote project-based learning and research, collaboration, and innovation for faculty and students in a curricular and co-curricular setting.

> Enhance program excellence through increased student access and industry engagement.

> Nurture campus/program connectivity through a prioritized phased framework of new construction, renovation, and strategically

reallocated space.

Goals & Objectives

Trang 3

> Increase undergraduate enrollment by 1,000 and the addition of 40

tenure-track faculty (inc associated research space)

> Create a student-focused interdisciplinary center enabling the college

to promote project-based learning and research , collaboration, and innovation for faculty and students in a curricular and co-curricular setting

> Enhance program excellence through increased student access and

industry engagement

> Nurture campus/program connectivity through a prioritized phased framework of new construction , renovation , and strategically

reallocated space

Goals & Objectives

Trang 4

> $100M Project Cost

$75M for new facility (+/-75,000 GSF)

$25M for a targeted

renovation of Mechanical Engineering

State/Donor (50%/50%)

Project Overview

Trang 5

> College of Engineering Strategic Plan

2014 - 2019

Assessment & Academic Facilities Plan

– Office of the University Architect

Hive Site Development Study – Payette

Background - Previous Planning Efforts

Trang 6

> Predesign: March 2018 – October 2018

Timeline

Trang 7

> Predesign: March 2018 – October 2018

Timeline

Trang 8

Sites Considered

considered

Trang 9

Sites Considered

considered

initial discussions

Trang 10

Sites Considered

considered

initial discussions

evaluation process

Trang 11

Preferred Site

Union Building)

pedestrian network

Trang 12

Preferred Site

Union Building)

pedestrian network

potential of high bay/daylight access on eastern facade

Trang 13

Challenges

Trang 14

Challenges

Trang 15

Site Topography

^

N

Trang 16

View Corridors

N

Trang 17

View Corridors

N

Trang 18

Pedestrian Connections

The “Engineering” Mid Slope Path

^

N

Trang 19

Project Summary