College of EngineeringInterdisciplinary Education & Research Building... > Increase undergraduate enrollment by 1,000 and the addition of 40 tenure-track faculty inc.. associated researc
Trang 1College of Engineering
Interdisciplinary Education & Research Building
Trang 2> Increase undergraduate enrollment by 1,000 and the addition of 40 tenure-track faculty (inc associated research space)
> Create a student-focused interdisciplinary center enabling the college
to promote project-based learning and research, collaboration, and innovation for faculty and students in a curricular and co-curricular setting.
> Enhance program excellence through increased student access and industry engagement.
> Nurture campus/program connectivity through a prioritized phased framework of new construction, renovation, and strategically
reallocated space.
Goals & Objectives
Trang 3> Increase undergraduate enrollment by 1,000 and the addition of 40
tenure-track faculty (inc associated research space)
> Create a student-focused interdisciplinary center enabling the college
to promote project-based learning and research , collaboration, and innovation for faculty and students in a curricular and co-curricular setting
> Enhance program excellence through increased student access and
industry engagement
> Nurture campus/program connectivity through a prioritized phased framework of new construction , renovation , and strategically
reallocated space
Goals & Objectives
Trang 4> $100M Project Cost
– $75M for new facility (+/-75,000 GSF)
– $25M for a targeted
renovation of Mechanical Engineering
State/Donor (50%/50%)
Project Overview
Trang 5> College of Engineering Strategic Plan
2014 - 2019
Assessment & Academic Facilities Plan
– Office of the University Architect
Hive Site Development Study – Payette
Background - Previous Planning Efforts
Trang 6> Predesign: March 2018 – October 2018
Timeline
Trang 7> Predesign: March 2018 – October 2018
Timeline
Trang 8Sites Considered
considered
Trang 9Sites Considered
considered
initial discussions
Trang 10Sites Considered
considered
initial discussions
evaluation process
Trang 11Preferred Site
Union Building)
pedestrian network
Trang 12Preferred Site
Union Building)
pedestrian network
– potential of high bay/daylight access on eastern facade
Trang 13Challenges
Trang 14Challenges
Trang 15Site Topography
^
N
Trang 16View Corridors
N
Trang 17View Corridors
N
Trang 18Pedestrian Connections
The “Engineering” Mid Slope Path
^
N
Trang 19Project Summary