“Where residents feel the comforts of home”GRE-35-5.84 US 35 AT VALLEY/TREBEIN RD ELIMINATION OF AT-GRADE INTERSECTION WITH NEW INTERCHANGE... Jackson Regional Airport • Greene County C
Trang 1“Where residents feel the comforts of home”
GRE-35-5.84
US 35 AT VALLEY/TREBEIN RD ELIMINATION OF AT-GRADE INTERSECTION WITH NEW
INTERCHANGE
Trang 2U.S 35 at Valley/ Trebein Rd
For more info on the project including drone videos:
https://www.greenecountyohio.gov/1652/TrebeinValleyUS-35-Interchange-Project
Part of final component of long-term project to upgrade US 35 from IR75 (Dayton) to IR 64 (Charleston, WV)
project
$820,000.00 26 Acres Valley Springs Farms
$201,500.00 6.5 Acres Martin Marietta
Trang 3Significant Users of the Intersection and Roadway
• Wright-Patterson Air Force Base
• Ohio University
• Sinclair Community College
• Cedarville University
• Central State University
• Wilberforce College
• Clark State College
• Wright State University
• Lewis A Jackson Regional
Airport
• Greene County Career Center
• Aviation Maintenance Technician Program
• Beavercreek Schools
• Cities of Beavercreek, Xenia, Fairborn, etc
• Greene County Residents
• Greene County Businesses
• Traffic Driving thru Greene County on US 35
Trang 5Crash Information
• Majority of the 175 mile system is free flowing facility except for a 1.7 mile portion of US 35.
• This is first traffic signal after driving 130 miles (or 2 hours) west across the State of Ohio on US 35 from Point
Pleasant, WV.
• 2017 HSIP (Highway Safety Improvement Program)
o Ranked 105 th in the state for suburban intersections for crashes from 2013-2017
• While zero fatalities have occurred at this intersection in the last five-plus year period, the injury crashes alone at this
location exceed the statewide average threshold, which
underscores the critical safety issues that need to be addressed.
• Several suburban non-freeway segments approaching the
intersection are also ranked red (high priority) in addition to the intersection.
• Removing the stop-condition on US-35 via construction of
an interchange will reduce the rate of high-injury, rear end crashes.
Trang 6Both the volume and severity of crashes during the most recent five-year period support the conclusion Highway safety is a critical need for the construction of an interchange at US-35 and Trebein/Valley Roads.
Trang 79,337 new jobs proposed with 1.8 miles of the intersection
575 new homes proposed with 1.5 miles of the intersection
Trang 8Economic/Residential
Development
2019
48% of Residential Greene County Construction Valuations were in Beavercreek
Township 77.28% higher than any jurisdiction
8.9% increase from 2018
36% of Commercial Greene County Construction Valuations were in Beavercreek
62.77% increase from 2018
Township had the second highest Commercial Valuations in the County
Trang 9MIX PUD Valley Springs
TOTAL Estimated New Employment: 2,020 – 5,040 jobs
Trang 10MIX PUD Valley Springs
9 buildings totaling 790,000 square feet
1,000-2,600 employees
Mix of upper and middle office
management
Research/Engineering
Light manufacturing/warehousing
Medical research and development
Retail/Service establishments catering to
above professions
Janitorial and other support staff for above
professions
Park
5 facilities 4,500 to 9,000 square feet per building
High technology and medical research (400-1200 positions)
Restaurant and hotel staff (200-400 positions)
Trang 11MIX PUD Valley Springs
SH Area Hotel/Restaurants
3 facilities
Hotel management (20-40 positions)
Hotel service and maintenance (200-400 positions)
Restaurant and other services (200-400 positions)
Trang 12Stonehill Village
PUD EMPLOYMENT ESTIMATES ZONE 3
750,000 – 1,250,000 Total Square Feet New Buildings
556 Health Care jobs
1,200 Retail/Mercantile jobs
2,541 Lodging Jobs
Trang 13Ohio University/Russ Research Center
72 Acre Campus
194,000 square feet of office and light manufacturing space on 60 acres
Engineering, IT, development, design, manufacturing firms
13 firms located on campus
Current number of jobs 200
Proposed 2021 new jobs 300
Commercial PUD approved in 2020 for 14 Acres
New 80,000 to 100,000 square feet building 2021
Trang 14Local Public Investments
Investments by Greene County Airport in Last 5 years
New Hanger-$500,000
Water/Sewer Extension on site - $350,000
Runway Extension – $1 million
Total 5000-feet
Ramp Modifications - $ 1 million
Taxiway Modification - $600,000
Navigation Improvements - $180,000
Investments by Airport in Next 5 years
New Weather Station - $150,000
Infrastructure modifications - $150,000
Investment by Greene County Career Center
Hanger/Classroom - $1 million
Trang 15Local Public Investments
Water/Sewer Project to Airport and
Surrounding Area
$2,001,835
Beavercreek Twp.-OPWC Grant $653,010
Beavercreek Twp.-$100,000
Beavercreek Twp.-In-Kind $48,825
Greene County Sanitary Eng.-Loan $300,000
Greene County Commissioners-$900,000
Beavercreek Fire Station 66 at Valley Rd/Dumford
Rd/Regional Airport - $6 million
Beavercreek Fire Station at Fairground Rd/Trebein Rd
-$5 million
Planned in next 5 Years
Intersection Improvements at Dayton Xenia Rd at
Trebein Rd - $1.5 million
Intersection Improvements at Hilltop Rd at Trebein
Road - $1.5 million
Roundabout at Dumford Rd/Valley Rd - $2 million
Valley Bell Connector - $ 4 million
Trang 16Residential Development
The Township has approved 3,943 new homes
3,029 have been completed
84% of the approved developments have been completed
As of 04/26/2021, 378 lots are considered shovel ready
2020 Approved Developments
River Reserve two new sections
White Barn Trails new section
Nathanial's Grove three new sections
River West & Scarborough two new sections
Claiborne Greens final section
2021 Developments in PUD Process or Design Phase
99 bed Nursing Home construction begins in 2021 - $10 million
Five new Housing Developments
575 additional homes within 1.5 miles of the U.S 35/Trebein intersection
Trang 17Questions?