1. Trang chủ
  2. » Ngoại Ngữ

2021 GRE-35-5_84 TRAC Presentation Powerpoint

17 0 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề US 35 at Valley/ Trebein Rd Elimination of At-Grade Intersection with New Interchange
Trường học Greene County Ohio
Chuyên ngành Civil Engineering
Thể loại Project report
Năm xuất bản 2021
Thành phố Greene County
Định dạng
Số trang 17
Dung lượng 4,57 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

“Where residents feel the comforts of home”GRE-35-5.84 US 35 AT VALLEY/TREBEIN RD ELIMINATION OF AT-GRADE INTERSECTION WITH NEW INTERCHANGE... Jackson Regional Airport • Greene County C

Trang 1

“Where residents feel the comforts of home”

GRE-35-5.84

US 35 AT VALLEY/TREBEIN RD ELIMINATION OF AT-GRADE INTERSECTION WITH NEW

INTERCHANGE

Trang 2

U.S 35 at Valley/ Trebein Rd

 For more info on the project including drone videos:

https://www.greenecountyohio.gov/1652/TrebeinValleyUS-35-Interchange-Project

 Part of final component of long-term project to upgrade US 35 from IR75 (Dayton) to IR 64 (Charleston, WV)

project

 $820,000.00 26 Acres Valley Springs Farms

 $201,500.00 6.5 Acres Martin Marietta

Trang 3

Significant Users of the Intersection and Roadway

• Wright-Patterson Air Force Base

• Ohio University

• Sinclair Community College

• Cedarville University

• Central State University

• Wilberforce College

• Clark State College

• Wright State University

• Lewis A Jackson Regional

Airport

• Greene County Career Center

• Aviation Maintenance Technician Program

• Beavercreek Schools

• Cities of Beavercreek, Xenia, Fairborn, etc

• Greene County Residents

• Greene County Businesses

• Traffic Driving thru Greene County on US 35

Trang 5

Crash Information

• Majority of the 175 mile system is free flowing facility except for a 1.7 mile portion of US 35.

• This is first traffic signal after driving 130 miles (or 2 hours) west across the State of Ohio on US 35 from Point

Pleasant, WV.

• 2017 HSIP (Highway Safety Improvement Program)

o Ranked 105 th in the state for suburban intersections for crashes from 2013-2017

• While zero fatalities have occurred at this intersection in the last five-plus year period, the injury crashes alone at this

location exceed the statewide average threshold, which

underscores the critical safety issues that need to be addressed.

• Several suburban non-freeway segments approaching the

intersection are also ranked red (high priority) in addition to the intersection.

• Removing the stop-condition on US-35 via construction of

an interchange will reduce the rate of high-injury, rear end crashes.

Trang 6

Both the volume and severity of crashes during the most recent five-year period support the conclusion Highway safety is a critical need for the construction of an interchange at US-35 and Trebein/Valley Roads.

Trang 7

9,337 new jobs proposed with 1.8 miles of the intersection

575 new homes proposed with 1.5 miles of the intersection

Trang 8

Economic/Residential

Development

 2019

 48% of Residential Greene County Construction Valuations were in Beavercreek

 Township 77.28% higher than any jurisdiction

8.9% increase from 2018

 36% of Commercial Greene County Construction Valuations were in Beavercreek

 62.77% increase from 2018

Township had the second highest Commercial Valuations in the County

Trang 9

MIX PUD Valley Springs

TOTAL Estimated New Employment: 2,020 – 5,040 jobs

Trang 10

MIX PUD Valley Springs

 9 buildings totaling 790,000 square feet

 1,000-2,600 employees

Mix of upper and middle office

management

 Research/Engineering

 Light manufacturing/warehousing

Medical research and development

 Retail/Service establishments catering to

above professions

 Janitorial and other support staff for above

professions

Park

 5 facilities 4,500 to 9,000 square feet per building

 High technology and medical research (400-1200 positions)

 Restaurant and hotel staff (200-400 positions)

Trang 11

MIX PUD Valley Springs

 SH Area Hotel/Restaurants

 3 facilities

 Hotel management (20-40 positions)

 Hotel service and maintenance (200-400 positions)

 Restaurant and other services (200-400 positions)

Trang 12

Stonehill Village

 PUD EMPLOYMENT ESTIMATES ZONE 3

 750,000 – 1,250,000 Total Square Feet New Buildings

 556 Health Care jobs

 1,200 Retail/Mercantile jobs

 2,541 Lodging Jobs

Trang 13

Ohio University/Russ Research Center

 72 Acre Campus

 194,000 square feet of office and light manufacturing space on 60 acres

 Engineering, IT, development, design, manufacturing firms

 13 firms located on campus

 Current number of jobs 200

 Proposed 2021 new jobs 300

 Commercial PUD approved in 2020 for 14 Acres

 New 80,000 to 100,000 square feet building 2021

Trang 14

Local Public Investments

Investments by Greene County Airport in Last 5 years

 New Hanger-$500,000

 Water/Sewer Extension on site - $350,000

 Runway Extension – $1 million

 Total 5000-feet

 Ramp Modifications - $ 1 million

 Taxiway Modification - $600,000

 Navigation Improvements - $180,000

Investments by Airport in Next 5 years

 New Weather Station - $150,000

 Infrastructure modifications - $150,000

Investment by Greene County Career Center

 Hanger/Classroom - $1 million

Trang 15

Local Public Investments

 Water/Sewer Project to Airport and

Surrounding Area

 $2,001,835

 Beavercreek Twp.-OPWC Grant $653,010

 Beavercreek Twp.-$100,000

 Beavercreek Twp.-In-Kind $48,825

 Greene County Sanitary Eng.-Loan $300,000

 Greene County Commissioners-$900,000

 Beavercreek Fire Station 66 at Valley Rd/Dumford

Rd/Regional Airport - $6 million

 Beavercreek Fire Station at Fairground Rd/Trebein Rd

-$5 million

Planned in next 5 Years

 Intersection Improvements at Dayton Xenia Rd at

Trebein Rd - $1.5 million

 Intersection Improvements at Hilltop Rd at Trebein

Road - $1.5 million

 Roundabout at Dumford Rd/Valley Rd - $2 million

 Valley Bell Connector - $ 4 million

Trang 16

Residential Development

 The Township has approved 3,943 new homes

 3,029 have been completed

 84% of the approved developments have been completed

 As of 04/26/2021, 378 lots are considered shovel ready

 2020 Approved Developments

 River Reserve two new sections

 White Barn Trails new section

 Nathanial's Grove three new sections

 River West & Scarborough two new sections

 Claiborne Greens final section

 2021 Developments in PUD Process or Design Phase

 99 bed Nursing Home construction begins in 2021 - $10 million

 Five new Housing Developments

 575 additional homes within 1.5 miles of the U.S 35/Trebein intersection

Trang 17

Questions?

Ngày đăng: 01/11/2022, 16:16

w