PTT PUBLIC COMPANY LIMITED PLATFORM COMPRESSION FACILITIES PROJECT CONTRACT No PTT.GAS /2/38/53
INSPECTION AND TEST PLAN
( PIPING )
22"Novenber 2010 | KS | APPROVED FOR CONSTRUCTION | JTR | ARK
0 — | 2"September 2010| KS ISSUED FOR APPROVAL ÍR | ARK
30%June 2010 | KS ISSUED FOR APPROVAL HR | ARK REV DATE BY DESCRIPTION CHECK | APPR | COMPANY
TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN
WITHOUT PRIOR WRITTEN AUTORIZATION OF PTT
PUNJ LLOYD GROUP JOINT
Trang 2
PROJECT NAME: PLATFORM COMPRESSION FACILITIES PROJECT, THAILAND
FLUOR COMMENTS ON: Inspection and Test plan (Piping) -
FLUOR FILE REF NO: CB/PCF/T/PB-0364 DATED 05/11/2010 2Ð tunj Lioyd
REF: PLG TRANSMITTAL/LETTER NO :PB/PCF/DT/CB/0650 DATED 29/10/2010
Doc Name: Inspection and Test plan (Piping)
Doc No.QA-P-1004.01-010-001 Rev.0
(Sr.No as per PTT's numbering)
Procedure","Acceptance Criteria" and " Verify Document" left without duly |ITP with latest revision numbers The detailed specification & code exhibit are
related references & acceptance criteria as specified in ITP
Trang 3
J18AO
BuIuoIssIu1u1o2-e1c|
BuIdic|
9;eq
Pi) ror
aeq
ad
Trang 430
| egeseumeuaepeeoSioslmvesronourwsdoiossrarrndmezamj|
Trang 5
yjoz
Trang 6
vi
Trang 7to