Addition of Document Alteration of Document Revocation of Document The Information contained herein is the exclusive property of WNC and shall not be distributed, reproduced, or disclose
Trang 1Addition of Document Alteration of Document Revocation of Document
The Information contained herein is the exclusive property of WNC and shall not be distributed, reproduced, or disclosed in whole or in part without prior written permission of WNC.
Form No.: 2-JQ-021-04, 006
Document Content
Revision History
Rev
Status
Revision
1 2011/01/10
Qiang Li/ Jack
GH Lee
ADD PAGE 5 Added page 5 Static Pile
Modified verification frequency of grounding wrist straps 6.2 4
Modified compliance verification frequency of anti-static floors
6.2.6 Modified compliance verification frequency of Ion discharging effectiveness
3 2011/04/28
Jack GH Lee
Page 5, 6.2.1.3 test procedure item 3: Added NQJ /NQX: static grounding cable (green), equipment grounding cable (chartreuse)
< 1.0 x 10^9
Page 7, 6.2.2.3 test procedure: added item 11 In addition
to point-to-ground test, point-to-point tests must comply with < 1.0 × 109
6.2.5.1 Page 13 Modified ESD Jacket/anti-static chair cover verifications of 6.2.5 and modified 6.2.5.1 Purpose
Page 16 Modified item 11: WTQ dissipation specifications and item 12 NQJ /NQX dissipation specifications
Page 18 Modified 6.2.8, the compliance verification of moving equipment (cart)/shelf/static conveyor and modified “6.2.8.1 Purpose”