Investment capitalCost million green-house construction cost is 300million VND including transparentcanopy imported fee is 150 million 1 Construction cost 2,500 dong including 10% of tar
Trang 1National Economics University
***
-GROUP ASSIGNMENT
Topic 6: Cost - Benefit Analysis For A National Park
Group member 1 Đinh Thúy Quỳnh (Leader) 11184218
Class Investment Economics 60
Subject Cost Benefit Analysis
Professor TS Hoàng Thu Hà
✦ HÀ NỘI - 2021 ✦
Trang 2A NATIONAL PARK Table of Content
Option 1 Eco green park
Trang 3check-in and have a picnic space In addition, visitors can fully enjoy the
atmosphere with outdoor activities such as cycling, jogging along the road Picture
1.1 Eco green Park
Besides, there are rows of benches so that guests can stop to avoid the sun underthe trees and enjoy the atmosphere Moreover, public wastebaskets andpropaganda slogans about preserving the environment are indispensable
Picture 1.2 Eco Green Park - preserving nature
Going straight to the center will be a bridge spanning a canal with two banks offlowers surrounding a greenhouse with a tropical landscape inside and a small lakeoccupying an empty space at the end of the greenhouse, and the larger spaceinside is a place to hold events and exhibitions
Picture 1.3 Eco Green Park - Flower garden
Trang 4Furthermore, to meet the entertainment needs of visitors as well as to increaseprofits, the park can sell vending machines so that guests can buy water or fastfood.
II Identify Cost-benefit associated with the project Table 1.1 Cost-benefit
analysis
Reduce the cost Traffic noise Cost of acquiring Temporary affect
of air condition production the property the living
surroundingpeople (dust,noise pollution)Create income Create beautiful Design and
from tourism scene construction
costReduce Enhance air Operation and
stormwater quality maintenance
Trang 5Create income Educational and The opportunity
from events, social benefit costs associated
exhibitions, with the loss of
communitywould havereceived if theproperty hadbeen developedfor other
purposesReduce the cost Landscaping
expenditure
III Valuing impacts
Table 1.2 Benefit(annual revenue)
The average revenue
5 Bicycle rental service 730
Children’s playground (sculpture painting,
Trang 6Table 1.3 Investment capital
Cost (million
green-house construction cost is 300million VND including transparentcanopy imported fee is 150 million
1 Construction cost 2,500 dong (including 10% of tariff)
Table 1.4.1 Investment capital (labor cost)
Wage per Wage per person per person Wage per month per year year
(million (million (million
Trang 8Table 1.5 The benefits and costs of the project from both private and social
perspectives
Private point view Social point view
From
year 4 Revenue 11249.55 11249.55
Greenhouseconstruction 300 286.36->
Net profit (private pointview) 7217.55
Net profit (social pointview) 8323.95
Table 1.6 The benefit and cost of the non market price
Cost of avoidance(avoid the cost ofTraffic noise soundproof wall
production decrease construction) 30
Hedonic pricing(increase the value ofthe land if the natureBeautiful scene scene is preserved) 500
Enhance the air Cost of avoidance 2
7
Trang 9TIEU LUAN MOI download : skknchat@gmail.com
Trang 10quality (avoid air purifier)
Contingent valuationmethod (WTP
survey) - how muchRecreational activity are people willing to
(educational and pay for the public
social benefit) recreational service 0,4
Contingent valuationTemporary affect the (WTA survey) - how
living environment much are people
of surrounding willing to accept for
people (dust, noise the temporary
pollution) dust/noise pollution 3
Table 1 7 Total Cost and Benefit of the Project ( Unit: million VND)
Benefit 0,00 0,00 0,00 11782 11782 11782 11782 11782
Table 1.8 Real Cost and Benefit (Unit: million VND)
Trang 11TIEU LUAN MOI download : skknchat@gmail.com
Trang 12PV -7994.91 -7536.68 -7104.71 6993.92 6593.06 6215.18 5858.96 2720.10 Accumul
ative -7994.91 -15531.59 -22636.30 -15642.38 -9049.32 -2834.14 3024.82 54650.76
NPV = 54650,76 (million VND)
NPV>0
9
Trang 13TIEU LUAN MOI download : skknchat@gmail.com
Trang 14Option 2 Creative Park
I Concept:
A creative park where artworks are exhibited.
Citizens are probably familiar with the common type of parks that are spacious andfilled with trees as well as flowers This common design is widely popular since itserves the surrounding habitants’ need for exercising and fresh air which are thetop priorities of visitors according to a study on urban public parks of Leeduniversity However, such infrastructures are becoming a norm of every metropolis,and citizens of the modern age are subtly demanding a form of entertainment andrelaxation of a higher level In the meantime, never before witnessed a moreimpactful movement of artistic creativity in the community For that reason, Thecreative park will be a perfect solution to the matter as it provides a public space forartists and citizens to enjoys the creative works
Since there is already a tobacco factory, some minor adjustments to the existingfacility are enough This will save a great deal of public finance as no large-scaleconstruction is needed
Creative park design: Unlike other parks, this infrastructure is designed distinctively
in a very modern way under the cooperation of many artists and architects Themain theme will be the city of the future which focuses on the special design ofincluded facilities and the exhibition of artwork within the area of the park
Picture 2.1 Creative Park
In the middle of the park, the used-to-be factory will be converted to an exhibitionbuilding of which the main purpose is to exhibit artworks
Main services of this park includes:
- Parking: This service will require payment
- Public space: walk, playing, chilling area
- Exhibition: artworks, music
10
TIEU LUAN MOI download : skknchat@gmail.com
Trang 15- Cafe: The cafe is installed in the same building as the exhibition so visitors can enjoy the artwork while chilling
- An outdoor movie theater (available at night only)
II Identify Cost-benefit associated with the project Table 2.1 Cost-benefit
analysis
With market Non-market With market Non-market
- Revenue from - Physical and - Construction - Negativeparking service mental cost impact on the
- Revenue from contentment of - Maintenance surroundingsthe cafe shop surrounding cost during the
- Revenue from inhabitants - Management constructionthe movie - A great and operation (Temporary airtheater motivation to cost pollution)
artistic activities
of thecommunity
III Valuing impacts
1 Description
An enterprise with 40% foreign capital has a project to build a creative park where art exhibitions take place
The construction phase starts in the first 3 years and the project goes into
operation from year 4 to year 15
Project revenue comes from:
- Coffee shop: on average, 250 bills are sold per day, each bill is 70,000
Profit tax is 25%, resource tax is 7% of the revenue
Construction investment cost in the first 3 years is 500 million VND/year The
annual operating cost when the project is put into operation is 1 billion VND/year
In the first 3 years of construction, the project hires 100 workers and from the 4th year onwards hires another 25 people
Trang 16- The unemployment rate is 20% and all unemployed people think their value of rest is 50 million VND/year
- The average salary per worker is 100 million VND/year
Assume that 1 year has 360 days
Table 2.2 Project financial information
Foreign capital 40%
Coffee shop/ per
day 250 bills 0,07 million VND per bill
Cinema/ per day 200 tickets 0,1 million VND per ticket
Parking area/ 40%
cars 0,05 million VND per ticket
of the
Investment cost in first 3 year 500 million VND per year
from year 4
in first 3 year 100 peoplefrom year 4
Unemploym
Value of rest 50 million VND per yearAverage
salary perpeople 100 million VND per year
fit
12
Trang 17TIEU LUAN MOI download : skknchat@gmail.com
Trang 18Total (per year) 14742 9465,282
capital
Operation cost 1000 1000Year 4-15 Resource tax 412,776 0
Net profit = Revenue - Labor cost - Operation cost - Resource tax = 829,224
Table 2.4 The benefit and cost of the nonmarket price
VND/1ha of creative park
Annual One time Physical and Contingent valuation method 780
exhibition organization costs)
(Increasing value of the surrounding lands)
quality to the surroundings due
to trees placement in comparison with that of the tobacco factory)
13
Trang 19TIEU LUAN MOI download : skknchat@gmail.com
Trang 20Cost Method Valued by million
VND/1ha of creative park
Annual Onetime Temporary air Contingent valuation method 10
pollution (willingness to accept
compensation to live in an environment near a construction site)
Trang 21Year 1 2 3 4 5 6 7 15
Cash flow -10303,92 -10101,88 -9903,81 1559,61 1529,03 1499,04 1469,65 1254,33 Discount rate 0,96 0,92 0,89 0,85 0,82 0,79 0,76 0,56
PV -9907,62 -9339,76 -8804,45 1333,16 1256,75 1184,72 1116,81 696,49 Accumulative -9907,62 -19247,38 -28051,83 -26718,67 -25461,92 -24277,20 -23160,39 -16247,10
NPV = -16247,10 (million VND)
NPV<0
Trang 22Option 3 Sport Park
I Concept:
This is a project to provide public sport space for people of all ages It is expected
to enhance citizens' physical as well as mental health, especially for children Thispark is also famous for being the ideal place to hold team building
The main facilities of this park include:
- Outdoor space:
+ Tennis courts, basketball courts, playground for pre-school and school-aged children
+ 2 picnic shelters (nearby stream)
+ Restroom building with all-gender restrooms
+ A stream where people can join kayak
+ Water fountain
- In-door sport complex
+ Artificial mountain climbing (for kids, adolescents)
+ Trampoline jumping
+ Gym
With an area of around 28 hectares, Sports Park anchors the redevelopment of theformer tobacco factory, and offers a world class destination for all interests SportsPark will provide high-quality facilities, not only for major events but also for dailyenjoyment by the community With a wide variety of sports venues, open spaces,park facilities, retail and dining outlets, it is set to be an urban oasis to meet thediverse needs of the public, and professional and amateur athletes
16
TIEU LUAN MOI download : skknchat@gmail.com
Trang 23Picture 3.1 Sport Park Design
Picture 3.2 Sport Park Main Facilities
Trang 24II Identify Cost-benefit associated with the project Table 3.1 Identify
cost-benefit
- Income Improve the Construction Temporary airfrom the local people cost pollution
camping health
gear rental
- Provide Offer places to Maintenance Temporary noisejobs for do exercise no cost pollution
people matter what the
living weather’s like
nearby that day :D
- Income Green Operation cost
from kayak atmosphere,
rental beautiful scene
III Valuing impacts
+ Construction investment cost in the first 3 years - 1,5 billion yearly +
Cost of operation is 55 000 000 VND each year
- Annual revenue of the park comes from:
+ Kayak rents: 50 000 VND/ ticket - on average, 150 kayak tickets are sold each day
+ Artificial mountain climbing fee: 100 000 VND/ ticket - on average 200 turns per day
+Trampoline jumping fee: 100 000 VND/ ticket - on average 150 turns per
day
+ Gym: 50 000 VND/ hour
+ Parking fee: 5000 VND per motorbike and 20.000 VND per car It isestimated that there are 100 vehicles including 70 motorbikes and 30 cars per day onaverage
+ Camping service cost: 50000 VND/ turn - on average 20 turns per day
+ Tennis court rent: 30000 VND / turn - on average 50 turns each day
18
TIEU LUAN MOI download : skknchat@gmail.com
Trang 25- Salvage is estimated at 0,5 billion
- Profit tax is 20% of the profit
- In the first 3 years, 100 labors are hired for the project, and from year
4->20, 100 more laborers are recruited to operate the park
+ The unemployment rate is 50% (unemployment workers are receiving unemployment benefits)
+ Wage for each worker is 60 000 000 VND/ year
- Assume that 1 year has 360 days
2 Valuation: (For Detailed information, click here )
Table 3.2 The Project Revenue ( Unit: thousand VND)
Trampoline
jumping
Turn(Motorbike
Table 3.3 The benefits and costs of the project from both private and
social perspectives ( Unit: thousand VND)
Trang 26Capital 1500000 1500000
Labor cost 12000000 6000000Profit tax 1279000 0
Table 3.4 Valuing indirect impacts (Unit: million VND)
Valued by million VND/1ha of
Hedonic pricing(increase the value ofthe land if the nature
Contingent valuation
Improve local Contingent valuation
Trang 27TIEU LUAN MOI download : skknchat@gmail.com
method (willingness toaccept compensation tolive in an environmentnear a construction site) 50
Table 3.6 Real Cost and Benefit (Unit: million VND)
Trang 28TIEU LUAN MOI download : skknchat@gmail.com
Trang 29rate 0.96 0.92 0.89 0.85 0.82 0.79 0.76 0.46
PV -7117.27 -6709.34 -6324.79 4300.28 4053.81 3821.46 3602.43 1672.48 Accumul
ative -7117.27 -13826.61 -20151.41 -15851.13 -11797.32 -7975.86 -4373.42 27369.29
NPV = 27369.29 (million VND)
NPV>0
Trang 30TIEU LUAN MOI download : skknchat@gmail.com
Trang 31Option 4 Astronomical Park
I Concept
The Astronomical Park has many types of facilities to meet the
recreational needs of the community Specifically :
- The center of the park is a large lake, in the center of the lake is a statue ofPresident Ho Chi Minh, a world cultural celebrity, connected by many bridges so thatpeople can visit and take photos Surrounding the lake are statues of other culturalcelebrities in the world
- The park also has an outdoor stage and surrounding seating system, where manyevents and activities take place Profits can be made through the rental of fairs andexhibitions, thereby maintaining the park's operation
Besides, there is also a galaxy square with a simulation model of planets andastronomical phenomena to help visitors have more knowledge about science It ispossible to profit through the fact that visitors can hire a tour guide for a morethorough and in-depth explanation of the history of astronomy
- The park also has a large observatory Visitors can purchase tickets to have a night out at the park and see the stars in the sky
The park also has many trees and benches as well as umbrellas for visitors to restalong the way In addition, the park also has a play area for children and exerciseequipment so that residents near the park can come and relax
Picture 3.2 Sport Park Main Facilities
Trang 32II Identify Cost-benefit associated with the project Table 4.1 Identify
cost-benefit
With market Non Market With market Non Market
a place to relaxand have fun
Trang 33Project revenue comes from:
- Coffee shop: on average, 200 bills per day, each bill is 50,000
Construction investment cost in the first 3 years is 1,2 billion VND/year
The annual operating cost when the project is put into operation is 1 billion
- The average salary per worker is 100 million VND/year
Assume that 1 year has 360 days
Table 4.1 Project Revenue Information
Foreign capital 35%
Trang 34million per
in first 3 year 100 peoplefrom year 4 to
Unemployment
million per
2 Valuation:
Table 4.2 The benefits and costs of the project from both private and
socialperspectives ( Unit: thousand VND)
Unit: millionVND
Trang 35TIEU LUAN MOI download : skknchat@gmail.com