Tài liệu Lab Exercise 1: VLAN, Trunk, and EtherChannel Configuration pptx
... 11/06/01 Date of Issue: 05-01-2001 Lab Exercise 1: VLAN, Trunk, and EtherChannel Configuration by Dan Farkas Introduction Equipment Initial Configuration Part 1: VLANs and Trunks Goals Task List Solutions ... Answers Configurations Part 2: EtherChannel Goals Task List Solutions - Part 2 Answers Configurations Introduction This lab has two parts. The first part...
Ngày tải lên: 18/01/2014, 04:20
... Configs You can work on this lab in several ways, but the best way is to just write erase your routers and paste in the configurations below. An alternative method is to analyze the configurations, spot ... Wolsefer Lab Scenario 1 Frame Relay and OSPF Introduction This lab is designed to be a build-to-specifications test. There are numerous issues that need to be addressed for this...
Ngày tải lên: 24/01/2014, 19:20
... wiring standards is 3 m (9.84 ft), although this can vary. Standard lengths are 1.83 m (6ft) and 3.05 m (10 ft). Step 2 Cut a piece of stranded Cat UTP cable to the desired length. Use stranded ... Prior to starting the lab, the teacher or lab assistant should have a spool of Cat 5 Unshielded Twisted Pair (UTP) cable, RJ-45 (8-pin) connectors, an RJ-45 crimping tool and an Etherne...
Ngày tải lên: 24/01/2014, 19:20