Installation flow of installing a cabinet on the antistatic floor...2 Cabinet installed on the antistatic floor...3 Positioning a cabinet independently...4 Positioning a cabinet close to

Trang 1

3 Installing a Cabinet on

the Antistatic Floor 1

3.1 Installation Flow and Expected Result 2

3.1.1 Installation Flow 2

3.1.2 Expected Result 3

3.2 Positioning the Cabinet 4

3.2.1 Positioning a Cabinet Independently 4

3.2.2 Positioning a Cabinet Close to an Installed Cabinet 5

3.2.3 Positioning Cabinets Abreast 6

3.2.4 Positioning Cabinets Back to Back 7

3.2.5 Checking the Positioning 7

3.3 Positioning the Support 8

3.3.1 Types of the Support 8

3.3.2 Positioning the Support on the Floor 9

3.4 Installing the Support 10

3.5 Installing the Cabinet on the Support 12

3.6 Checking the Cabinet Installation 15

Trang 2

Installation flow of installing a cabinet on the antistatic floor 2

Cabinet installed on the antistatic floor 3

Positioning a cabinet independently 4

Positioning a cabinet close to an installed cabinet 5

Positioning cabinets abreast 6

Positioning cabinets back to back 7

S300A support 8

Mounting holes for the support (a single cabinet) 9

Installing the expansion tube and expansion nut 10

Fixing the support on the floor 11

Placing the cabinet and the insulation plates 12

Leveling the cabinet 13

Securing the cabinet on the support 14

Installing the floor pallet 15

Trang 3

Tables Figure 1.1Types of the support 8

Trang 4

3 Installing a Cabinet on

the Antistatic Floor

About This Chapter

When the installation is well prepared, install the cabinet There are three modes for installing the cabinet according to the floor of the equipment room

 Installation on the antistatic floor

 Installation on the cement floor (see Chapter 4 "Installing a cabinet on the Cement Floor")

 Installation on the wooden floor (the same as the installation on the cement floor)

This chapter guides you to install the cabinet on the antistatic floor We

recommend reading OptiX OSN 3500 Intelligent Optical Transmission System Compliance and Safety Manual This helps you to ensure a safe and smooth

installation

The following table lists the contents of this chapter

Section Description

3.1Installation Flow and Expected Result

Describes the installation flow.

3.2Positioning the Cabinet Describes operations and procedures of marking

the installation position for the cabinet.

3.3Positioning the Support Describes operations and procedures of marking

the position for the support.

Trang 5

Section Description

3.4Installing the Support Describes operations and procedures of installing

the support.

3.5Installing the Cabinet on the Support

Describes operations and procedures of installing the cabinet on the support.

3.6Checking the Cabinet Installation

Describes the check points of the installation.

3.1 Installation Flow and Expected Result

This section describes the installation flow and expected installation result

3.1.1 Installation Flow

Figure 1.1 shows the installation flow for cabinet installation on the antistatic floor

Starting

Positioning the cabinet

End

Positioning the support

Installing the support

Installing the cabinet on the

support

Checking the installation

Figure 1.1 Installation flow of installing a cabinet on the antistatic floor

Trang 6

3.1.2 Expected Result

Figure 1.1 shows the expected result of a cabinet installed on the antistatic floor

Cabinet

Antistatic floor

Figure 1.1 Cabinet installed on the antistatic floor

 Note

There is no antistatic floor between the cabinet and the support

 Note

To install multiple cabinets of the same type side by side, you only need to install the side doors at two ends of the row of cabinets

Trang 7

3.2 Positioning the Cabinet

This section guides you to mark the installation position for the cabinet on the antistatic floor The position varies with the number of cabinets and their layout

3.2.1 Positioning a Cabinet Independently

Purpose This procedure guides you to position a cabinet which is

installed independently.

Tools /Materials Pencil

Ruler

Prerequisites The cabinet and the accessories (including the support and

fixing pieces) have been transported to the site.

Required/As needed Required if the cabinet is installed independently.

Caution

Read technical documents on construction before you mark the installation position for the cabinet

Step 1 Mark the reference point for installing the cabinet according to the construction

drawing

Step 2 Draw a 600 mm x 300 mm rectangle according to the reference point See Figure

1.1

600mm

800mm

Reference point

the wall

Front of cabinet

≥ 1000mm

Figure 1.1 Positioning a cabinet independently

Trang 8

3.2.2 Positioning a Cabinet Close to an Installed Cabinet

Purpose This procedure guides you to position a cabinet close to an

installed cabinet.

Tools /Materials Pencil

Ruler Plummet

Prerequisites The cabinet and the accessories (including the support and

fixing pieces) have been transported to the site.

Required/As needed Required if the cabinet is installed close to an installed

cabinet.

Step 1 Use a plummet to determine and mark the side projective position (on the ground)

of the installed cabinet

Step 2 Draw the side outline of the cabinet to be installed according to the marks made in

step 1

Step 3 Draw the front outline of the cabinet to be installed according to the front outline

of the cabinet already installed

Step 4 Mark the installation reference point

Step 5 Draw a 600 mm x 300 mm rectangle as shown in Figure 1.1 according to the

reference point, and then draw the central lines for the cabinet

600mm

300mm

5

1 Front outline of the cabinet to be installed 2 Central lines of the cabinet to be installed

3 Side outline of the cabinet to be installed 4 Layout of the cabinet already installed

5 Reference point

Figure 1.1 Positioning a cabinet close to an installed cabinet

End

Trang 9

3.2.3 Positioning Cabinets Abreast

According to Figure 1.1, mark the position of cabinets

≥ 1000mm

Inner corner

≥ 800mm

≥ 1000mm

≥ 1000mm

Cabinet

600mm 300mm

Plan view of cabinets

Figure 1.1 Positioning cabinets abreast

Trang 10

3.2.4 Positioning Cabinets Back to Back

According to Figure 1.1, mark the position of cabinets back to back

≥ 1000mm

Inner corner

≥ 800mm

≥ 1000mm

≥ 1000mm

Cabinet

600mm 300mm

Plan view of cabinets

Front of cabinet

Front of cabinet

Front of cabinet

600mm 300mm

Figure 1.1 Positioning cabinets back to back

3.2.5 Checking the Positioning

Check the positioning as the following items

 The minimum distance between two rows of cabinets is 1 m

 The minimum distance between the cabinet side and the wall is 0.8 m

 The minimum distance between the front/back of the cabinet and the wall is 1 m

 An aisle at least 1 metre wide is reserved in the equipment room

 The cable outlet on the top of the cabinet is aligned with the lower part of the cabling trough of the equipment room

 The position for installing the cabinet is correct and meets the requirements in the construction drawing

Trang 11

3.3 Positioning the Support

This section describes how to position the support in the equipment room An S300A support assembly is used to support the cabinet It also facilitates floor installation and cabling Each cabinet needs one S300A support assembly ("support" hereinafter)

3.3.1 Types of the Support

Figure 1.1 shows the appearance of the support

Cabinet installation hole

Height indicator

Support installation hole

Height adjusting screw Front of the

support

Figure 1.1 S300A support

There are four types of support: three types of height-adjustable support and one type of fixed-height support Figure 1.1 lists the range of the adjustable height for each type

Figure 1.1 Types of the support

Type Suitable floor height

(mm) Description

within their ranges, by moving the upper and lower supports.

floor height (minimum 100 mm)

Support IV is of fixed-height It is applied to the extra-high or extra-low antistatic floor The floor for this type of support must be at least 100 mm high.

Trang 12

3.3.2 Positioning the Support on the Floor

Purpose This procedure guides you to position the support on the

floor after positioning the cabinet.

Tools /Materials Pencil

Ruler

Prerequisites The cabinet has been positioned.

Required/As needed Required if the cabinet is installed on the antistatic floor.

Step 1 Draw a 460 mm x 264 mm rectangle according to the central lines (see the dotted

rectangle in Figure 1.1) One side of this rectangle is 41.5 mm away from the back

of the cabinet

600mm

Center line

41.5mm

460mm

230mm

Front 800mm

1000mm

1000mm

Figure 1.1 Mounting holes for the support (a single cabinet)

Step 2 The four vertexes of the dotted rectangle are the mounting holes for the support

Mark them with a marking pen

Caution

Check whether the mounting holes are fit for the support to eliminate any possible mistakes

Trang 13

End 3.4 Installing the Support

Purpose This procedure guides you to install the support on the floor.

Tools /Materials Drill

Drill bit (Ф16) Expansion bolts M12 Dust cleaner

Rubber hammer

Prerequisites The support has been positioned.

Required/As needed Required if the cabinet is installed on the antistatic floor.

Caution

A dust cleaner is recommended to remove the dust in the course of drilling Clean out the dust inside before measuring the depth of the holes

Step 1 Drill holes on the marked positions The depth of the four holes ranges from 52

mm to 60 mm

Step 2 Remove the expansion tube and nut from the expansion bolt

Step 3 Insert the guide rib on the expansion nut into the guide slot on the expansion tube

Step 4 Put the expansion tube and nut vertically into the hole, as shown in Figure 1.1

Bolt Expansion tube Guide slot on expansion tube Expansion nut Guide rib on expansion nut

Figure 1.1 Installing the expansion tube and expansion nut

Trang 14

Step 5 Drive the expansion tube completely into the floor with a rubber hammer.

Step 6 Repeat steps 2–5 to install the other three expansion tubes and expansion nuts

Step 7 Use height adjusting screws to level the height indicator on the support with the

height of the antistatic floor See 3.3.1 I I Step 1Figure 1.1

Step 8 Tighten the height-locking bolt on the support

Caution

Follow the principle of "middle first, sides later", that is, tighten the middle height locking bolt first and then that of both sides

Step 9 Align the support installation holes with the expansion bolt holes on the floor

Step 10 Mount the spring washer and flat washer on the bolt M12 x 60

Step 11 Insert the bolt vertically into the expansion hole through the support installation

hole

Step 12 Check the support position and fix the bolt M12 x 60 See Figure 1.1

S300A support M12 x 60 bolt

Expansion tube Expansion nut

Figure 1.1 Fixing the support on the floor

End

Trang 15

3.5 Installing the Cabinet on the Support

Purpose This procedure guides you to install the cabinet on the

support.

Tools /Materials Horizontal ruler

M12 x 40 bolt Insulation plate Washer

Prerequisites The support has been installed.

Required/As needed Required if the cabinet is installed on the antistatic floor.

Caution

At least three persons are required to install the cabinet on the support

Step 1 Place the two insulation plates on the support with the holes aligned from the top

down See Step 2Figure 1.1

Step 2 Place the cabinet on the plates with the holes aligned from the top down See

Figure 1.1

Insulation plate

Figure 1.1 Placing the cabinet and the insulation plates

Trang 16

Step 3 Adjust the levelness of the cabinet by adding washers between the insulation

plates and the support See Figure 1.1

Caution

If the washers are not inserted between the insulation plates and the support, insulation between the cabinet and the floor cannot be guaranteed

Washer

Figure 1.1 Leveling the cabinet

Step 4 On the top of the cabinet, place the level instrument in two perpendicular

directions to check the levelness of the cabinet

Step 5 Vertically insert the M12 x 40 bolt assembly through the lower enclosure frame of

the cabinet, and into the connecting hole of the support See Figure 1.1

Trang 17

M12X40 bolt

Insulation washer

Figure 1.1 Securing the cabinet on the support Step 6 Tighten the bolts alternately to reduce the stress between the bolts and the cabinet

Step 7 Measure the resistance between the support and the cabinet The normal resistance

should be larger than 5 megaohm

 If the measured resistance is less than 5 megaohm, demount the cabinet and check the insulation components Then repeat the operations from step 1

 If the measured resistance is larger than 5 megaohm, continue to the next step

Step 8 Fix the horizontal pallet and side pallet to the support See Figure 1.1

 If a cabinet is separately installed (no other equipment around), it needs to fix both the horizontal and side pallets on the support with M12 x 30 bolts

 If several cabinets are installed side by side, only the leftmost and rightmost support need side pallets

Trang 18

1 4

5

3

2

1 M12 x 30 bolt 2 Side pallet 3 Support

4 Horizontal pallet 5 Cabinet

Figure 1.1 Installing the floor pallet

Step 9 Cut and restore the antistatic floor according to the circumstance around the

cabinet

End 3.6 Checking the Cabinet Installation

The following requirements should be met when the support is installed properly

 The position of the cabinet is consistent with the engineering design drawing

 The installation position of the cabinet meets the requirements in the engineering design drawing

 All bolts are installed correctly and firmly The sequence for installing the spring washer, flat washer and insulation washer is correct

 With the insulation pad shipped with the equipment, the requirement for insulation of the cabinet and the support should be fully satisfied Insulation measures are taken if the user-supplied mount base is used

 The cabinet should be kept upright, and the horizontal deviation shall not be more than 3 mm

 The main walkway in the equipment room should be lined up with a deviation less than 5 mm Adjacent cabinets should be in line

 All bolts on the cabinet are equipped with flat washer and spring washer, and all are screwed tight

 No part of the cabinet is distorted

 The exterior varnish and the marks on the cabinet should be kept intact, and the marks and signs should be correct, clear, and complete

 The cabinet label is properly pasted on the cabinet