It is made from the following list of subassemblies semi-finished products and raw materials These materials already exist in the Material Master: Item Code Material Description Material
Trang 1Production Planning – Master
Data
Trang 2Scenario
Global Bikes Inc (GBI) was founded in 2001 following the merger of two bicycle
manufacturers, one based in the US and the other in Germany GBI has three lines of business: deluxe and professional touring bikes, men‟s and women‟s off-road bikes, and bike accessories
GBI sells its bikes to a network of specialized dealers throughout the world, and it procures its raw materials from a variety of suppliers globally
GBI has two manufacturing facilities, one in the US and one in Germany It also has three additional warehouses, two in the US and one in Germany
GBI has more than 100 employees globally The organization uses SAP ERP to support its processes
Organisational Units
During the implementation of SAP R/3 once the business processes to be implemented are determined the next stage is to define the organisational units Organisational units are areas of the company where various business processes are implemented Different
processes can use different organisational units The organisational units used in
Production Planning are Client, Company Code, Plant and Storage Location
Company Code
A company code is an independent accounting unit Balance sheet and profit and loss
statements that are required by law are created at the company code level In our scenario
the company code will be US00
Plant
A plant produces goods, renders services or makes goods available for distribution It has
attributes such as:
Trang 3A storage location defines where materials are stored A plant could have more than one storage location The storage locations in our scenario is FG00
A summary of the organisational units used in our scenario are illustrated below
Display Level BOM Report
Multi-Create Work
Centres Create Routings
Trang 4Material Master
The Material Master contains all the information on all the material that a company procures, produces, stores and sells It is used by all of the Logistics components in the
R/3 System such as purchasing, inventory management, materials planning, invoice
verification, and so on
Information stored in the Material Master can describe the component as well as how it
should be treated in the business processes Materials with similar basic attributes are
grouped together by material type This means you can manage your materials according
to their business requirements
Creating Material Master records
We are going to define a new Finished Product, The Mongoose Mountain Bike with item
code ORMG1### (Where ### is the last 3 digits of your SAP user id.)
It is made from the following list of subassemblies (semi-finished products) and raw
materials (These materials already exist in the Material Master):
Item Code Material Description Material Type
ORWA1### Wheel Assembly Semi-Finished Product
DGAM1### Gear Assembly Semi Finished Product
ORWH1### Aluminium Wheel Raw Material
BOLT1### Socket Head Bolt Raw Material
We will now create the Material Master record for the Mongoose bike
01 Choose Logistics => Production => Master Data => Material
Master => Material => Create (general) =>Immediately
The Create Material (Initial Screen) appears
02 Type the following information about the Finished Product:
Trang 5Your screen appears as follows:
03 Press <ENTER> to accept the values
The Select Views dialog box is displayed (or click on the button on the
Application Toolbar) In SAP, the information stored in the Material Master record is
divided into different views so that a user can request to look at only the information that is
of interest to him/her Each user department has its own view of a material master record For example, data that relates to the accounting department is stored in the accounting
view and data that relates to material planning is stored in the MRP view A view can extend to one or more screens For example, the MRP view has several screens
04 Click to select the following six views:
Basic Data 1 Sales : Sales Org Data 1 Sales : Sales Org Data 2 Sales : General Plant Data General Plant Data/Storage 1 Accounting 1
05 Make sure that the “Create views selected” option is ticked, then Press
<ENTER> to accept the views
Trang 606 You now need to specify the organisational elements relevant to this material
In the Organisational Levels box, type:
Storage Location: FG00 Finished Goods
Sales Organisation: UE00 US East
Distribution Channel: WH Wholesale
Check that the four codes above have been entered correctly before pressing <Enter>
Trang 7Press <ENTER>
07 The Create Material screen for Finished Products will be displayed If the “Basic
data 1” tab is not selected, click on it to select it
Trang 808 Type the following information about material ORMG1### :
Basic Data 1
Description: Mongoose Mountain Bike
Base unit of measure: EA (Each)
Material group: BIKES (Finished bikes)
Division: BI (Bicycles)
Lab/office: 001 (Laboratory 1)
Gross Weight: 8000
Net Weight 8000
Weight Unit G (Grams)
Sales : Sales Org 1
Tax classification 0 (Exempt)
(Note : There are three of these to be entered You may have to use the
scroll bars to view them all)
Sales : General Plant Data
Availability check 02 (Individual reqmts)
Trans gp 0001 (Palettes)
Loading grp 0002 (Handcart)
Accounting 1
Valuation Class 7920 (Finished product)
Price Control S (Standard)
Standard Price 1500
09 Click to save your document (or type CTRL-S)
If you get the message “Prices have been recalculated”, Save again
You should now be back at the Create Material (Initial Screen) with the following message on the Status Bar “Material ORMG1### created” If you do not see this
message check with your tutor !
Trang 9Changing Material Master records
We will now make a change to one of the existing Semi-Finished Products, the Off Road
Wheel Assembly
10 Choose Logistics => Production => Master Data => Material
Master => Material => Change =>Immediately
11 Enter Material ORWA1### and press <enter>
12 Select the Basic Data 1
MRP 1
and General Plant Data/Storage 1 views
13 In the Organisational Levels dialog box, enter
DL00 Dallas
SF00 Semi-finished goods Press <enter>
The Change Material (Semifinished Product) screen appears
Trang 1014 Click on the MRP1 tab
15 Change the ABC Indicator to “B”
16 Save the updated material record
Note the message at the bottom of the screen:
Displaying Material Master records
We will now display one of the existing Raw Materials, the Tire
17 Choose Logistics => Production => Master Data => Material
Master => Material => Display => Display Current
18 Enter Material ORTR1### and press <enter>
19 Select the Basic Data 1
Purchasing Accounting 1
and Costing 1 views
20 In the Organisational Levels dialog box, enter
DL00 Dallas
Press <enter>
The Display Material (Raw Materials) screen appears
21 Click on the Purchasing tab
What Purchasing Group does the material belong to ?
22 Return to the Standard menu
Trang 11Bill of Materials (BOM) The BOM is a complete formally structured list of components that make up a product or
assembly The list contains the item number of each component together with the quantity
and unit of measure It creates the relationships between an assembly and all of its direct
components
The structure of the bicycle can be represented using a Bill-of-Material
The BOM for the Mongoose Mountain Bike can be represented as follows:
This BOM shows how the bicycle is assembled from raw materials For example, to make
the subassembly ORWA1### we use 6 different raw materials In the next process 2
units of ORWA1### are combined with 1 unit of subassembly ORFR1### and 1 unit of
DGAM1### to make the final product Each component has its own material master
Defining the Bill of Materials
You are now ready to define the Bill of Materials for our Mongoose bicycle You will define the Bill
for the finished product, the bills for the subassemblies are already defined in the BOM master data file
23 Choose Logistics => Production => Master Data => Bills of Material => Bill of
Material => Material BOM => Create
The Create material BOM : Initial Screen appears
Trang 1224 Type the following data:
Material : ORMG1###
Plant : DL00
BOM usage : 1 (Production)
Your screen appears as follows:
25 Press <ENTER>
The General Item Overview screen appears
26 Enter the data for the components of the Finished product ORMG1### as follows :
Item Category (ICt) Component Quantity
Do not enter the unit of measure
27 Press <ENTER> to display the component description, unit of measure and other data
Trang 1328 Click to save your data
The Initial Screen will be displayed with the message „Creating BOM for material
ORMG1###’ on the Status bar
You can now check the material structure by displaying a Multi-Level BOM :
29 Return to the Standard menu,
30 Choose Information Systems => General Report Selection =>
Logistics – General => Logistics Basic Data => Bill of
Material => Display Multilevel BOM
31 Type Material ORMG1###, Plant DL00, BOM Usage 1, Application PP01,
Required qty 1
32 Click to execute the report
The report should appear similar to the screen below
Trang 14You can drill down to view the details of any component
33 Double click a component number to drill down
34 Click or to return to the SAP standard menu
Work Centres
Now that we have defined the materials to be used
in making a bicycle, we need to define the location and sequence in the plant in which the
manufacturing processes take place
A work center is where an operation or activity is carried out within a plant It can represent a
geographical location or a particular machine in a dept Examples : Lathe 2,
Line A, Group 12 Work centres are used in
routings, costing calculations, and scheduling
Trang 1536 Type the following data :
Plant : DL00 (Dallas)
Work center : WC1-###
Work center category : 0001 (Machine) Your screen should appear as follows:
37 Press <ENTER> to continue
The Basic Data screen is displayed
38 Type Assembly as the work center description,
000 as the Person Responsible,
001 as the Usage SAP1 as the Standard key value
Click on the Costing tab and enter Cost Centre NAPR1000
Trang 1639 Click to save your data
You will return to the Create Work Centre: Initial Screen
40 Repeat this process for the remaining three work centres In all cases use the same
data as for WC1 and the following descriptions:
You now need to produce a Work Center List to check that you have entered the data correctly
42 Type /nCR05 in the Command Field on the Standard Toolbar
43 Press <ENTER>
The Work Center List selection screen is displayed
44 Select all work centers in Plant DL00, Work Center WC*-### (wild card) and execute the
report
/nCR05
Trang 17Routings
A routing contains the operations to be performed, their sequence and the various work centers
involved to manufacture an item
45 Choose Logistics => Production => Master Data => Routings =>
Routings => Standard Routings => Create
The Create Routing: Initial Screen appears
46 Type the following data:
Material: ORMG1###
Plant: DL00
47 Press <ENTER> to accept the data
The Create Routings : Header Details screen appears
48 Type 1 for the Usage field (Production)
and 3 for the Status field (Released for Costing)
Your screen appears as follows, the Group number will be assigned by the system
Trang 1849 Press <ENTER> to accept the values
50 Click on the Applications Tool Bar to display the Operation
Overview screen
51 Type the details of each operation as follows :
Operation Work Center Control Description
0010 WC1-### PP01 Assemble Raw Materials
0020 WC2-### PP01 Final Assembly
0030 WC3-### PP01 Paint
0040 WC4-### PP01 Final Test
52 Click to save your data
You now need to produce a Routing Report to check that we have entered the data
correctly
53 Type /nCA51 in the Command Field on the Standard Toolbar
Trang 19The Task List selection screen is displayed
55 Type Task List Type : “N” (Routing)
Material “ORMG1###”
to review the routings
56 Execute
Materials List Report
57 Go to transaction MM60, the Materials List
58 Enter *1### in the Material field The “*” is a wild-card character which means :
include all materials whose code ends with ###
Enter DL00 as the plant
Trang 2059 Execute the report
60 This report uses the standard “SAP List Viewer” format
Note all the options on the applications toolbar
61 With the help of the Information button, try some of the options
Trang 21END OF WORKSHOP - RETURN TO SAP MENU Useful Transaction Codes
MM01 Create Material Master
MM02 Change Material Master
MM03 Display Material Master
CR05 Workcentre List Report
MM60 Material List Report