Page 1PROBLEM SOLVING WORKBOOK Disciplined Problem Solving Note; See instruction book for guidance at each discipline.. No.: D0 Symptoms: D0 Emergency Response Actions: % Effective: Dat
Trang 18D Report DISTRIBUTED TO ALL TEAM MEMBERS
Spec No / Part No:
CORRECTIVE ACTION:
ACCEPTED
SOME QUESTIONS REMAIN FOR CLARIFICATION
NOT ACCEPTED – PLEASE EXPLAIN
Please return to the Attention of _ via fax at (?)?? - Thank you!
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
CHECK, SIGN, AND DATE BELOW SHOWING APPROVAL ON STATUS OF 8D.
PLEASE FAX BACK TO ME WITHIN 5 DAYS OF RECEIPT.
Trang 2Page 1
PROBLEM SOLVING WORKBOOK Disciplined
Problem Solving
Note; See instruction book for guidance at each discipline.
THE DISCIPLINED PROBLEM SOLVING PROCESS SUMMARY REPORT
Quality
Product/Process Information: Organization Information: Ref No.:
D0 Symptom(s):
D0 Emergency Response Action(s): % Effective: Date Implemented: Verification/Validation: Customer Contact:
D1 Team (Name, Dept., Tel)
Champion:
D2 Problem Problem Statement:
D3 Interim Containment Action(s): % Effective: Date Implemented: D4 Root Cause(s) and Escape Point(s) % Contribution: D5 Chosen Permanent Corrective Action(s) % Effective: D6 Implemented Permanent Corrective Action(s):
Validation:
Date Implemented:
D8 Team and Individual Recognition: Date Closed: Reported by:
Page 2
Trang 3THE DISCIPLINED PROBLEM SOLVING PROCESS
Use this process flow to guide you through the disciplined problem solving process Also refer to the Instruction Book for further guidance If you need any further advice or help seek out someone in the Quality Assurance Department who has been
trained to a more detailed level of problem solving.
D0 Consider emergency response action (ERA); decision to use, and preparation for, this or
the more detailed approach,.
D1 Establish the team and use teamworking approach, if required.
D2 Describe the problem.
D3 Develop, validate and implement the interim containment action (ICA), if required.
D4 Find, define and verify root cause(s) and escape point(s).
D5 Choose and verify permanent corrective actions (PCAs) for root cause and escape point.
D6 Implement and validate permanent corrective actions (PCAs).
D7 Prevent recurrence of this and possible similar failures, also identify systematic
improvement opportunities.
D8 Recognise team and individual contributions, as appropriate.
DISCIPLINE D0
You are aware that something has gone wrong, and you don’t know the reason why Before you can describe the problem accurately and thus find root cause(s), you may need to protect the customer (internal or external) from continuing to experience the symptom, if this has not already been done.
What was the Emergency Response action(s):
All inventory was accounted for Lot “1” remaining samples put in quarantine.
(Use the following as a check list)
WIP on hold
WIP checked
Warehouse stock on hold
Warehouse stock checked
Deliveries in transit identified
Deliveries in transit checked
Deliveries at customer checked
Verify control plan controls are properly working
Review all past inspection data
Other actions
Note: See Instruction book for guidance at each Discipline.
Page 3
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
Trang 4TIME LINE OF EVENTS
As you proceed through the Disciplines, you will find out information concerning the product and process associated with the problem Document any information such as date of approval of first batches made and any changes to process, material, methods, machines, people or the environment with dates Keep this Time Line live through the investigation.
Dates Event(s) i.e changes or happenings
Define very simply “What is wrong with what” i.e what object has what defect?
Use the techniques of “Sub Dividing” and “Stair Stepping” to assist you, to show the relationship of the Problem Statement to the symptom.
Note: See Instruction Book for guidance at each discipline.
Page 4
Trang 5DISCIPLINE 2 DESCRIBE THE PROBLEM
Before trying to define the root cause or jump to solutions – stop and take time to describe the problem, using as much data and facts as you can gather Use the questions below to guide you and, if it helps, draw a diagram on the next page It is possible that the problem was not described correctly on the complaint/DMR you received If so re-state the problem correctly
PROBLEM PROFILE DESCRIPTION AREA Be as specific as possible, identifying part numbers,DESCRIPTION DATA
machines, dates, quantities etc
QUESTIONS CHECKLIST
WHAT
WHERE
you see the defect?
defective object observed?
WHEN
First seen?
By the customer?
When did we make the part?
When in time, was the defect first observed?
When were the defectives made?
has the defect been observed? (e.g continuously, in patterns, only on Mondays?)
When seen in
Process flow?
When is the defect seen in the process of making the object?
operating cycle of the object? (i.e when the object/system is used)
the object? (e.g when new or after
200 hours?)
HOW BIG
How many objects have the
defect?
How many objects have the defect?
How many/much defect(s) per
object?
How much or how many defect(s) per object? (ie are all bad parts defective to the same extent?)
first observation and what is it now? (e.g stable/erratic, getting better/worse)
Consider Similar Parts Could this problem affect other similar parts: on other lines, in other plants with the same process, other parts with the same materials/process? List those areas or parts you
consider at risk, and inform the Champion to enable communication with others.
Similar parts
Page 5
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
Trang 6D2 continued D2 Attach a Picture or Diagram here
Attach any other relevant documents to this workbook as you go.
Now that you have completed D2, review the emergency response action to see if it can be used as an ICA or improved in order to allow production to continue while still detecting and containing all defective output, giving you time to analyse root cause If it can’t, then identify a better containment action (Do not remove Interim Corrective Action until permanent corrective action is implemented and verified)
Note: In some circumstances an ICA may not be needed.
IS AN ICA REQUIRED?
IS ERA OK AS AN ICA?
IF YOU CONSIDER ICA NOT NECESSARY, WHY NOT?
ICA NOT NECESSARYCONTAINMENT ACTION IS PERMENANT.
DESCRIBE THE ICA THAT YOU PROPOSE –
WHO WILL DO IT, AND WHEN? –
HOW WILL OK PARTS BE IDENTIFIED? –
IF YOU PROPOSE CHANGE(S), REPORT TO CHAMPION AND OBTAIN APPROVAL OF CONTROL PLAN, WORK
INSTRUCTIONS AND AUDIT SHEETS.
Keep the following chart up to date until you complete D8.
EFFECT OF ACTIONS ON CUSTOMER
ACTION DATE IN
PLACE
MONTH
ERA
ICA
PCA
Page 6
Trang 7D4 continued ROOT CAUSE THEORIES
Consider the Cause of Effect Diagram Then create some Root Cause Theories that explain a strong logical link to the Problem
Statement and Problem Profile recorded at D2 Document your theories as complete sentence statements.
ROOT CAUSE THEORY STATEMENTS:
1
2
3
4
5
Consider each theory in turn Eliminate those which are not logical when you consider the Time Line of Events and/or the Problem Profile Record your reasons for elimination.
DO WE HAVE AN INSPECTION/CONTROL POINT THAT SHOULD HAVE ENSURED THAT NON-CONFORMANCES WERE FOUND? YES OR NO?
IF YES, WHY DID THE INSPECTED/CONTROL POINT FAIL?
Page 9
For the theories which pass through the Logic Test, show the logical links (steps) between the root cause theory, the problem
statement and the symptom Do this for each theory Repeatedly ask why? to show the links.
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
Trang 8ROOT CAUSE THEORY NUMBER 1
ROOT CAUSE THEORY NUMBER 2
PROVING THE ROOT CAUSE – VERIFICATION ACTION PLAN
What testing are you going to do to prove that this is (or these could be) the root cause?
1
2
3
4
UPGRADING THE PROBLEM If you find after these tests that you have not been able to discover cause(s), then take this workbook to your Champion so that the Champion can get you specialist advice.
Page 10
WHY?
WHY?
WHY?
WHY?
WHY?
Trang 9WHAT ARE YOUR IDEAS FOR PERMANENT CORRECTIVE ACTIONS? (This is one of the
most important steps in effective problem solving At this step it is imperative that appropriate time is alloted to thoroughly prove out the proposed solution(s) It should be verified on
multiple machines, across all production shifts, etc A rush to conclusion here can lead to
ineffective corrective action and recurrence of the problem).
CHOSEN PCA
- VERIFICATION - How do you know (proof) that it will work?
APPROVAL - Take the workbook to your Champion for the PCA to be
reviewed and proposal(s) approved.
Define the precise actions you will need to take to implement and validate effectiveness of the PCA (use Key Tasks Action Plan and Monitor.)
List which documents will need to be formally changed, as a result of these actions.
Take a moment to look back at this problem Why did it happen in the first place? What lessons can be learnt? What changes need to be made to ensure that this and similar problems never happen again? Also note down some specific improvements that need to be made in areas such as systems, procedures, machinery, maintenance, people and training.
Prevent Actions Notes:
Systems etc Prevent Recommendations Notes:
Page 11
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
Trang 10DISCIPLINE 8 CONGRATULATE THE TEAM (& COMPLETE THE TASK)
Make sure that you have completed this workbook, presented it to your Champion to enable communication with others Express thanks to those who have helped you in dealing with this problem.
FINALLY – Thank YOU for all your diligent work
KEY TASKS ACTION PLAN AND MONITOR
Use this page, as you move through the workbook to make note of actions that you (or others you have asked) have identified Use the ‘complete’ section to monitor progress of the tasks.
Trang 11DISCIPLINE 4 DEFINE & VERIFY ROOT CAUSE
Brainstorm all possible causes of the problem and record them using the area headings to guide you List all your ideas and do not criticise any at this stage After your first
attempt, take time to think and add any other possible cause(s).
FM 341.12/08-05-02 (Replacing FM341.11/06-07-01)
Note: If you need any further advice or help, seek out someone in the Quality Assurance Department who has been trained to a more detailed level of problem solving.
DIAGRAM
PROBLEM STATEMENT
(See D2)