Soạn thảo Giấy đề nghị thành lập trung tâm tư vấn du học tại Vĩnh Phúc;. – Lập đề án tổ chức và hoạt động của trung tâm theo các quy định Tổ chức kinh doanh dịch vụ tư vấn du học được thành lập theo quy ... Đề án hoạt động tư vấn du học (có mẫu để khách hàng điền thông tin ..
Trang 1Becoming a PTE Academic Approved Test Centre
www.pearsonpte.com
Trang 2Physical Requirements
1.
All test centres must have the following facilities:
Registration room
• Administrator PC
• Waiting area
• Lockers
Test delivery room
• Workstation PCs
• Partitions
• Chairs
Server room
• Locked room storing the file server
P
Bathrooms
Server Room
Testing Room
Registration Room
The waiting area must have one chair for every workstation in the testing room
Bathrooms must be located near to the testing room
The server must
be stored in a locked room
Internal signage directing test takers to the registration and testing room
The external building must have company signage making the building easily identifiable
The waiting area must have one locker for every workstation in the testing room
A chair must be used to seat test takers when capturing their photograph The Administrator’s PC will be used to monitor test takers via CCTV footage
Administrator must
have access to a
printer and scanner
Desk chairs must
be comfortable and
CCTV cameras are installed
in the testing room and the
Partitions must measure 1.5 metres in height Desks must measure
1.2 metres wide
A microphone
The biometric
kit should be
stored on the
Administrator’s
desk
The Logitech camera must be stored
on the Administrator’s desk
Trang 3Processor Windows compatible Intel or AMD dual or multi-core processor The Intel Atom line and AMD Neo line of processors are not permitted
RAM 2GB
Hard Drive NTFS Format with at least 40 GB available space
Operating System Windows 7 Professional or Enterprise (32 bit) with NTFS file system required or Windows XP Professional (32 bit) with Service Pack 3, NTFS file system required Windows Vista and any 64 bit versions of Windows are not currently supported Virtual machine and thin client environments (e.g
VMware, Virtual PC, VirtualBox, Parallels, HP, Wyse, etc.) strictly prohibited
Video Adapter True colour (32 bit) 1024 x 768 pixels 128 MB Video RAM Video adapter must support DirectX 9c or higher Display 17 inch or larger (CRT or flat panel)
Mouse &
Keyboard Mouse, English QWERTY Keyboard DVD-ROM Drive Required
Audio Card Windows audio compatible
USB Minimum of 5 ports required for mouse, keyboard, admissions camera, palm vein, and signature pad May need additional port for scanner
Network Connection Network Interface Card (1) Ethernet card 100 mbps between workstation and switch – with internet access Cabling Ethernet/CAT 5E or better /RJ45 Wireless network connections not permitted
Internet Connection Broadband (DSL, cable or LAN/WAN) required Minimum 512kbps upload Total bandwidth must support 25 kbps Down/10 kbps Up for each Delivery workstation
Browser Internet Explorer 7.0 or 8.0
Printer Laser 600 dpi with Postscript support, accessible from Administration and Delivery workstations
Scanner Flatbed colour scanner
Anti-Virus Software installed, enabled and regularly updated
Administrator PC
Trang 4Workstation PC
Processor Windows compatible Intel or AMD dual or multi-core processor The Intel Atom line and AMD Neo line of processors are not permitted
RAM 2GB
Hard Drive NTFS Format with at least 60 GB available space
Operating System Windows 7 Professional or Enterprise (32 bit) with NTFS file system required or Windows XP Professional (32 bit) with Service Pack 3, NTFS file system required Windows Vista and any 64 bit versions of Windows are not currently supported Virtual machine and thin client environments (e.g
VMware, Virtual PC, VirtualBox, Parallels, HP, Wyse, etc.) strictly prohibited
Video Adapter True colour (32 bit) 1024 x 768 pixels 128 MB Video RAM Video adapter must support DirectX 9c or higher Display 17 inch or larger (CRT or flat panel)
Mouse &
Keyboard Mouse, English QWERTY Keyboard DVD-ROM Drive required
Audio Card Windows audio compatible
USB 3 ports required for mouse, keyboard and headset
Network Connection Network Interface Card (1) Ethernet card 100 mbps between workstation and switch – with internet access Cabling Ethernet/CAT 5E or better /RJ45 Wireless network connections not permitted
Internet Connection Broadband (DSL, cable or LAN/WAN) required Minimum 512kbps upload Total bandwidth must support 25 kbps Down/10 kbps Up for each Delivery workstation
Browser Internet Explorer 7.0 or 8.0
Anti-Virus Software installed, enabled and regularly updated
Trang 5Processor Windows compatible Intel or AMD dual or multi-core processor The Intel Atom line and AMD Neo line of processors are not permitted
RAM 2GB
Hard Drive 60 GB available space
Operating System Windows Server 2008 (more than 20 Windows 7 or 9 Windows XP workstations), 32 bit only, NTFS file system, with latest supported
Service Pack or Windows 2003 Server (more than 20 Windows 7 or 9 Windows XP workstations), 32 bit only, NTFS file system, with latest supported Service Pack Windows or Windows 7 Professional or Enterprise (1 - 20 workstations), 32 bit, NTFS file system required Virtual machine and thin client environments (e.g., VMware, Virtual PC, VirtualBox, Parallels, HP, Wyse, etc.) strictly prohibited
Additional Software
Components Microsoft NET Framework Version 2.0 with Service Pack 1 (x86) DVD-ROM Drive required
Network Connections Network Interface Card Ethernet card 1 GB full 100 mbps from server to switch, wireless networking not permitted, cabling Ethernet /CAT 5E or better /RJ45 Novell NetWare not supported
Power Supply UPS recommended
System Backup Performed daily
Anti-Virus Software installed, enabled and regularly updated
Server
Trang 6Pearson Security Kit
Security Camera EZ Dome camera, EZ Dome camera cable, EZ Dome camera power supply
DVR DVR GX780 imaged Pearson EZ Watch cards-4 channel
E-Pad E-pad VP9801
Palm Vein Palm Vein cable, Pearson Palm Vein hand guide, Palm Vein sensor
Bio Camera Logitech Quick Cam Pro9000
Workstation Kit Headset, HW121N, Canada, US Kit, AVS, DVR, Microphone, instruct/set-up PTE-A media installer, PTE-A media installer v7
The Security Kit must be purchased through Pearson and cannot be sourced independently
Trang 7Staffing Requirements
3.
Test Centre Administrator Administrators are responsible for registering and invigilating test takers on test day.
At least two staff must be trained and certified as Test Administrators, however, only one Administrator will need to be present during testing at any one time
IT Technician The Test Centre must have access to a member of their IT team for the following:
• Installation of Pearson Testing Kit including networking cameras to a DVR
• Set-up and networking of all workstations to one server
• Installation of Pearson test software onto all workstations and the Administrator PC
• Installing and implementing new software releases
• Working with VUE Support Services on resolution of technical issues
• Monitoring the functionality of all hardware components
Trang 8The Test Centre is responsible for all costs associated with both the fit out and the procurement of necessary technical equipment.
The Test Centre will need to source the following:
• Desks
• Chairs
• Partitions
• PCs
• Server
• Internet The list below sets out each piece of equipment required and the indicative price.
Note: these prices are subject to change.
NUMBER Of WORKSTATIONS
6 Workstations 8 Workstations 10 Workstations
EqUIPMENT qty Unit Total qty Unit Total qty Unit Total
EZ DOME Camera – Cable 6 $32 $192 8 $32 $256 10 $32 $320
DVR GX780 (imaged) 1 $669 $669 1 $669 $669 1 $669 $669
EZ-Watch cards 1 $685 $685 1 $1,325 $1,325 1 $1,325 $1,325
Palm-Vein sensor 1 $256 $256 1 $256 $256 1 $256 $256
Logitech QuickCam Pro 9000 2 $90 $180 2 $90 $180 2 $90 $180
Kit, AVS, DVR, microphone 1 $92 $92 1 $92 $92 1 $92 $92
Trang 9Time Frames 5.
Test Centre
Evaluation
Systems Test
Approval
Physical Specifications Assessment
Statement
of Intent
Training
Launch Event
Pre- Activation
IT Infra-structure
Live Testing
Contracts
1week
1week 1week
3 months
1week
1week 1week
1week
2 weeks
2 weeks
3 weeks
2 weeks
Building Works
Software Install
IT Hardware
Media Install
Security Kit Install
Please note:
These times frames are indicative only.
They do not take into account any undue delays
at the end of the test centre and assume that the test centre has the ability to call on staffing and other resources as required