Project name Software Requirements Specification this is document describes the Software Requirement Specification of Stock Control. This document is used by development team. This is document describes the Software Requirement Specification of Stock Control.
Trang 1[P N ] Software Requirements Specification
Date [April 12, 2010]
Author [Le Minh Vuong, BA]
Reviewed by [Le Tat Hai, Project Manager]
Approved by [Nguyen Thi Thanh Thuy, Director]
Trang 2<April 12, 2010> <1.0> <Describles Software Requirement Specification > <Le Thanh Tung>
Trang 31 INTRODUCTION
4
1.1 PURPOSE
4
1.2 SCOPE
4
1.3 DEFINITIONS, ACRONYMS AND ABBREVIATIONS
4
1.4 REFERENCES
4
1.5 OVERVIEW
4
2 RISK ANALYSIS
5
2.1 TECHNOLOGICAL RISKS
5
2.2 SKILLS RISKS
5
2.3 POLITICAL RISKS
5
2.4 BUSINESS RISKS
5
2.5 REQUIREMENTS RISKS
5
3 BUSINESS PROCESSES
5
4 FUNCTION REQUIREMENT
5
5 NON FUCTION REQUIREMENTS
6
6 USE CASES MODEL
6
7 USER INTERFACE PROTOTYPE
6
Trang 41 Introduction
1.1 Purpose
<Define purpose of project and purpose of document>
Smart World technology is proud of being a leading IT company in Vietnam offering Smart Card
and RFID (Radio Frequency Identification) technology for Education, Banking, Government and
Industry
This is document describes the Software Requirement Specification of Stock Control
1.2 Scope
<Provide a short description of the software being specified and its purpose, including relevant
benefits, objectives, and goals. Relate the software to corporate goals or business strategies. If a
separate vision and scope document is available, refer to it rather than duplicating its contents
here. An SRS that specifies the next release of an evolving product should contain its own scope
statement as a subset of the longterm strategic product vision.>
This is document describes the Software Requirement Specification of Stock Control
This document is used by development team
1.3 Definitions, Acronyms and Abbreviations
1.4 References
<List any other documents or Web addresses to which this SRS refers. These may include
Trang 52 Risk Analysis
2.1 Technological Risks
<This subsection specifies new technology issues that could affect the project.>
RIS001
RIS002
RIS003
RIS004
2.2 Skills Risks
<This subsection specifies the risk of not getting staff with the required expertise for the
project.>
RIS001
RIS005
RIS006
2.3 Political Risks
<This subsection identifies political forces that could derail or affect the project.>
2.4 Business Risks
<This subsection describes the business implications if the project is canceled.>
2.5 Requirements Risks
<This subsection describes the risk that you have not correctly described the requirements.
List areas whose requirements were most likely to be incorrectly captured.>
RIS007
RIS008
3 Business processes
1. FeatureSpecification\[ProjectName]_2.BusinessProcessSpecification.doc
Trang 65 Non fuction requirements
1
FeatureSpecification\[ProjectName]_4.NonFunctionREQs.doc
6 Use cases model
2. UsecaseModel\[ProjectName]_5.UsecaseModel.doc
7 User interface prototype
1. FeatureSpecification\[ProjectName]_6.UserInterfacePrototype.doc