TẤT CẢ CÁC BẢN VẼ KẾT CẤU PHẢI ĐƯỢC ĐỌC CHUNG VỚI CÁC BẢN VẼ KIẾN TRÚC VÀ BẢN VẼ HỆ THỐNG CƠ ĐIỆN LIÊN QUAN, NHÀ THẦU PHẢI THÔNG BÁO CHO KỸ SƯ CÔNG TRƯỜNG CÁC MÂU THUẪN, NẾU CÓ, GIỮA CÁ
Trang 1Duy Hai Commune, Duy Xuyen District, Quang Nam Province
ISSUED DATE 10/10/2017
INVESTOR:
ITEM: STRUCTURE
HOI AN SOUTH DEVELOPMENT LIMITED
BASIC DESIGN
Address: Tay Son Tay Hamlet, Duy Hai Commune Duy Xuyen District, Quang Nam Province, Vietnam
HOI AN STAFF VILLAGE
NKC CONSULTANCY CO LTD.
74 Nguyen Co Thach, An Loi Dong Ward, District 2, Ho Chi Minh City Tel: (84 28) - 36203611 Fax:(84 28) - 36203612
Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
ADMIN BUILDING
Trang 342.
SỐ THANH CHỦNG LOẠI
KÍ HIỆU THANH KHOẢNG CÁCH (mm)
ĐƯỜNG KÍNH (mm)
SÀN 1 - PHƯƠNG :
SÀN 2 - PHƯƠNG :
GHI CHÚ TỔNG QUÁT - GENERAL NOTES
1 TẤT CẢ CÔNG VIỆC PHẢI TUÂN THEO TIÊU CHUẨN XÂY DỰNG VIỆT NAM HOẶC TIÊU CHUẨN ANH HOẶC TƯƠNG ĐƯƠNG CAO HƠN VÀ TIÊU CHÍ KỸ THUẬT CỦA DỰ ÁN DO ĐƠN VỊ THIẾT KẾ BAN HÀNH VÀ ĐƯỢC CHỦ
ĐẦU TƯ PHÊ DUYỆT KHI THI CÔNG, NẾU CẦN THAY ĐỔI ĐỀU PHẢI BÁO CHO TƯ VẤN THIẾT KẾ VÀ CHỦ ĐẦU TƯ ĐỂ CÓ Ý KIẾN VÀ PHÊ DUYỆT
2 TẤT CẢ CÁC BẢN VẼ KẾT CẤU PHẢI ĐƯỢC ĐỌC CHUNG VỚI CÁC BẢN VẼ KIẾN TRÚC VÀ BẢN VẼ HỆ THỐNG CƠ ĐIỆN LIÊN QUAN, NHÀ THẦU PHẢI THÔNG BÁO CHO KỸ SƯ CÔNG TRƯỜNG CÁC MÂU THUẪN, NẾU CÓ, GIỮA
CÁC BẢN VẼ
3 TẤT CẢ CÁC CAO TRÌNH TÍNH BẰNG ĐƠN VỊ MÉT GHI TRÊN BẢN VẼ ĐƯỢC CĂN CỨ VÀO MỐC CAO ĐỘ GIẢ ĐỊNH GHI TRÊN BẢN VẼ KIẾN TRÚC, TRONG ĐÓ CAO TRÌNH HOÀN THIỆN GIẢ ĐỊNH +0.000m TẠI TẦNG TRỆT,
TƯƠNG ĐƯƠNG VỚI CAO TRÌNH QUỐC GIA +8.350m CAO TRÌNH KẾT CẤU ĐƯỢC KÝ HIỆU SSL
4 PHẦN ĐẤT NỀN BÊN DƯỚI TẤT CẢ CÁC MÓNG PHẢI ĐƯỢC KỸ SƯ GIÁM SÁT KIỂM TRA VÀ NGHIỆM THU TRƯỚC KHI TIẾN HÀNH RẢI LỚP BÊ TÔNG LÓT
5 LỚP BÊ TÔNG LÓT B10 THEO TCVN 5574 : 2012 ĐÁ 1X2 DÀY 100 MM ĐƯỢC SỬ DỤNG CHO TẤT CẢ CÁC HẠNG MỤC GHI TRÊN BẢN VẼ KẾT CẤU NGOẠI TRỪ CÓ NHỮNG VỊ TRÍ ĐƯỢC CHỈ ĐỊNH KHÁC
6 BÊ TÔNG B30 ĐƯỢC SỬ DỤNG CHO TẤT CẢ CÁC HẠNG MỤC BÊ TÔNG CỐT THÉP CỦA CÔNG TRÌNH
7 BÊ TÔNG PHẢI ĐƯỢC CUNG CẤP BỞI NHÀ CUNG CẤP ĐÃ ĐƯỢC ĐĂNG KÝ CHẤT LƯỢNG VỀ SẢN XUẤT VÀ CUNG CẤP BÊ TÔNG
8 BÊ TÔNG TRỘN VỚI ĐỘ SỤT DƯỚI 75 MM SẼ KHÔNG ĐƯỢC SỬ DỤNG, TRỪ KHI NHÀ THẦU CHỨNG MINH RẰNG CÓ THỂ ĐẠT ĐƯỢC ĐỘ RẮN KẾT PHÙ HỢP VỚI ĐỘ SỤT THẤP HƠN, NHƯNG TRONG MỌI
TRƯỜNG HỢP KHÔNG ĐƯỢC THẤP HƠN 50 MM ĐỘ SỤT ĐƯỢC QUI ĐỊNH NHƯ SAU:
BÊ TÔNG SÀN : 100 ± 20 MM
BÊ TÔNG CỘT : 120 ± 20 MM
BÊ TÔNG VÁCH : 120 ± 20 MM
9 KHI THIẾT KẾ HỖN HỢP BÊ TÔNG TRỘN, HÀM LƯỢNG XI MĂNG KHÔNG ĐƯỢC ÍT HƠN 350KG/M³
10 LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU TỚI CỐT THÉP PHẢI TUÂN THỦ THEO NHƯ SAU (MM):
CÁC THÀNH PHẦN
KHẢ NĂNG CHỊU LỬA 2 GIỜ ĐẾN THÉP CHỦ ĐẾN THANH THÉP NGOÀI CÙNG DẦM
SÀN CỘT TƯỜNG LÕI CẦU THANG BỘ TƯỜNG BAN CÔNG
35 (45)
35 (40) 35 35 35 30
25 (30)
25 (35) 25 25 35 20
GHI CHÚ:
A LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU TỚI CỐT THÉP SẼ CÓ GIÁ TRỊ ĐƯỢC NÊU RA TRONG BẢNG TRÊN HOẶC BẰNG ĐƯỜNG KÍNH THANH THÉP TÙY THEO GIÁ TRỊ NÀO LỚN HƠN
B CÁC GIÁ TRỊ TRONG DẤU NGOẶC ĐƠN DÀNH CHO CẤU KIỆN MỘT NHỊP
C LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU TỚI CỐT THÉP CỦA CẤU KIỆN TIẾP XÚC TRỰC TIẾP VỚI BÊ TÔNG LÓT MÓNG SẼ LÀ 50 MM; VÀ HAI BÊN 50 MM
D LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU TỚI CỐT THÉP CỦA THÀNH PHẦN BỂ NƯỚC HOẶC HẠNG MỤC KÍN NƯỚC SẼ LÀ 40 MM
E VỚI TẤT CẢ CÁC CẤU KIỆN TIẾP XÚC TRỰC TIẾP VỚI THỜI TIẾT, LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU TỚI CỐT THÉP SẼ LÀ 35 MM
F LỚP BẢO VỆ CHO CỐT THÉP DƯỚI CỦA ĐÀI CỌC SẼ LÀ 100MM
11 CỐT THÉP PHẢI TUÂN THEO TCVN 5574 : 2012
THÉP CƯỜNG ĐỘ CAO A III GIỚI HẠN CHẢY = 390 N/MM² (Ø > 10 MM) KÍ HIỆU T
THÉP MỀM A II GIỚI HẠN CHẢY = 295 N/MM² (Ø 10 MM) KÝ HIỆU R
26 CUNG CẤP CÁC GIÁ ĐỠ BẰNG THÉP ĐỦ ĐỂ ĐỠ LỚP CỐT THÉP TRÊN TRONG CÁC BẢN SÀN, NHỊP THANG VÀ BẢN MÓNG DÀY TRÊN 150 MM VÀ CÁC THANH THÉP CHỮ U ĐỂ GIỮ CỐT THÉP ĐỨNG TRONG TƯỜNG Ở
VỊ TRÍ THẲNG ĐỨNG
27 KHÔNG ĐƯỢC BỐ TRÍ CÁC LỖ HỔNG VÀ CÁC HỐC TRONG CÁC BỘ PHẬN KẾT CẤU MÀ KHÔNG CÓ SỰ ĐỒNG Ý CỦA KỸ SƯ CÔNG TRƯỜNG
28 KHÔNG ĐƯỢC SỬ DỤNG CỘT CHỐNG GIÀN GIÁO BẰNG GỖ CỨNG NHIỆT ĐỚI NẾU KHÔNG ĐƯỢC SỰ ĐỒNG Ý CỦA KỸ SƯ CÔNG TRƯỜNG
29 KHI THIẾT KẾ VÁN KHUÔN HAY CỐP-PHA, KHÔNG ĐƯỢC ĐỂ VÁN KHUÔN HAY CỐP-PHA CHỌC VÀO TRONG BỀ MẶT CỦA BÊ TÔNG THÀNH PHẨM
30 THIẾT KẾ VÁN KHUÔN HAY CỐP-PHA BAO GỒM CẢ CỘT CHỐNG VÀ MÓNG PHẢI ĐƯỢC KỸ SƯ CÔNG TRƯỜNG ĐỒNG Ý TRƯỚC KHI BẮT ĐẦU BẤT KỲ HOẠT ĐỘNG THI CÔNG NÀO PHƯƠNG PHÁP THÁO DỠ
CỐP-PHA VÀ VÁN KHUÔN PHẢI ĐƯỢC TRÌNH LÊN KỸ SƯ CÔNG TRƯỜNG XIN PHÊ DUYỆT TRƯỚC KHI CÔNG VIỆC THÁO DỠ ĐƯỢC TIẾN HÀNH
31 TẤT CẢ CÁC THANH CHẮN NƯỚC (WATERSTOP) SẼ ĐƯỢC LẮP ĐẶT THEO ĐỀ XUẤT CỦA NHÀ SẢN XUẤT VÀ ĐƯỢC GẮN CHẮC CHẮN VÀO VỊ TRÍ THI CÔNG TẤT CẢ CÁC MỐI NỐI MỘT CÁCH PHÙ HỢP, SỬ DỤNG
LƯU HÓA NÓNG HOẶC LẠNH NGĂN CÁC CHỖ PHỒNG RÌA DI CHUYỂN TRONG KHI ĐỔ BÊ TÔNG PHẢI RẤT CẨN TRỌNG KHI ĐẦM NÉN BÊ TÔNG QUANH CÁC THANH CHẮN NƯỚC NHẰM ĐẢM BẢO KHU VỰC ĐỔ BÊ
TÔNG ĐÓ KHÔNG BỊ RỖNG HAY RỖ TỔ ONG
32 VỊ TRÍ VÀ PHƯƠNG PHÁP THI CÔNG CÁC MỐI NỐI THI CÔNG, BAO GỒM CẢ VIỆC XỬ LÝ MẪU, PHẢI ĐƯỢC ĐỆ TRÌNH KỸ SƯ CÔNG TRƯỜNG ĐỂ PHÊ DUYỆT TRƯỚC KHI THI CÔNG
33 TRỪ KHI CÓ QUI ĐỊNH KHÁC, VÁN KHUÔN CHO TẤT CẢ CÁC DẦM CÔNG XÔN / BẢN SÀN VÀ DẦM VỚI KHẨU ĐỘ LỚN HƠN 6M SẼ ĐƯỢC LÀM VỒNG LÊN TRƯỚC (PRE-CAMBERED) NHƯ SAU:
A BẮC NHỊP GIỮA CÁC ĐIỂM TỰA: 0.2% CHIỀU DÀI NHỊP TẠI GIỮA NHỊP
B CÔNG XÔN: 0.4% CHIỀU DÀI CỦA CÔNG XÔN TẠI ĐẦU TỰ DO
34 THAM KHẢO BẢN VẼ KIẾN TRÚC VỀ CHI TIẾT CÁC TƯỜNG BÊ TÔNG KHÔNG CHỊU LỰC MÀ KHÔNG ĐƯỢC BAO GỒM TRONG HỆ KẾT CẤU TRONG CÁC BẢN VẼ KẾT CẤU CỦA CÔNG TRÌNH
35 NHÀ THẦU PHẢI CHUẨN BỊ CÁC BẢN VẼ TỔNG HỢP VỀ BỐ TRÍ LỖ / HỐC CỦA HỆ THỐNG CƠ - ĐIỆN ĐỂ TRÌNH KỸ SƯ CÔNG TRƯỜNG XIN PHÊ DUYỆT TRƯỚC KHI THI CÔNG
36 ĐỐI VỚI TẤT CẢ CÁC CHI TIẾT CHỐNG THẤM, ĐỀ NGHỊ XEM CÁC BẢN VẼ KIẾN TRÚC LIÊN QUAN
37 ĐỐI VỚI VIỆC XÁC ĐỊNH VỊ TRÍ CHÍNH XÁC VÀ CÁC CHI TIẾT CỦA HỐ THĂM, HỐ THU NƯỚC (SUM PIT), HỐ CHẮN DẦU MỠ (PETROL INTERCEPTOR), V.V ĐỀ NGHỊ THAM KHẢO CÁC BẢN VẼ KỸ THUẬT VỀ HỆ THỐNG
CƠ - ĐIỆN VÁCH VÀ SÀN CỦA CÁC HỐ NÀY PHẢI CÓ BỀ DÀY TỐI THIỂU LÀ 200 MM, TRỪ KHI CÓ SỰ CHỈ DẪN KHÁC
38 VIỆC THI CÔNG CHỐNG THẤM SẼ ĐƯỢC TRIỂN KHAI TRONG TẤT CẢ CÁC KẾT CẤU TƯỜNG, DẦM, BẢN SÀN Ở DƯỚI CAO TRÌNH MẶT ĐẤT VÀ TIẾP XÚC VỚI ĐẤT BẰNG BÊ TÔNG LOẠI B30 (KHÔNG THẤM
NƯỚC)
39 SAU KHI HOÀN THÀNH CẤU TRÚC HẠ TẦNG, TẤT CẢ CÁC KHOẢNG RỖNG PHẢI ĐƯỢC LẤP ĐẦY TỚI CÁC CAO TRÌNH MẶT ĐẤT BẰNG VẬT LIỆU ĐÃ ĐƯỢC CHẤP THUẬN TRỪ KHI ĐƯỢC KỸ SƯ CÔNG TRƯỜNG CÓ CÁC
CHỈ DẪN KHÁC ĐỘ CHẶT TƯƠNG ĐỐI PHẢI ĐẠT 90% TỈ TRỌNG KHÔ TỐI ĐA TRỪ KHI ĐƯỢC QUI ĐỊNH KHÁC VẬT LIỆU LẤP SẼ ĐƯỢC ĐỔ THÀNH TỪNG LỚP CÓ CHIỀU DÀY KHÔNG LỚN HƠN 300 MM, TRỪ KHI
ĐƯỢC KỸ SƯ CÔNG TRƯỜNG CHỈ DẪN CÁCH KHÁC
40 TẤT CẢ CÁC MỐI NỐI THI CÔNG TRONG TƯỜNG, DẦM VÀ BẢN SÀN TIẾP XÚC VỚI ĐẤT PHẢI ĐƯỢC BỐ TRÍ VỚI CÁC THANH CHẮN NƯỚC GẦN MẶT TIẾP XÚC VỚI ĐẤT, CÁC ỐNG NỐI CÓ CÁNH (PUDDLE FLANGE) PHẢI
ĐƯỢC SỬ DỤNG CHO TẤT CẢ CÁC LỖ HỔNG CHO HỆ THỐNG CƠ ĐIỆN ĐI XUYÊN QUA CÁC CẤU KIỆN TIẾP XÚC TRỰC TIẾP VỚI ĐẤT
41 CHỦ ĐẦU TƯ PHẢI TỔ CHỨC THIẾT LẬP CÁC MỐC QUAN TRẮC THEO DÕI ĐỘ LÚN CỐ ĐỊNH THEO ĐÚNG QUI ĐỊNH CỦA TCXDVN-357: 2005
KÝ HIỆU TRONG CÁC BẢN VẼ CỐT THÉP :
1 ALL WORKS SHALL COMPLY WITH THE VIETNAMESE STANDARDS OR EQUIVALENT BRITISH STANDARDS OR MORE ONEROUS, BUILDING CODE OF VIETNAM AND THE TECHNICAL SPECIFICATIONS APPROVED BY CLIENT DURING THE CONSTRUCTION, THE CONTRACTOR SHOULD INFORM THE DESIGN ENGINEER AND THE CLIENT ANY CHANGES OR PROBLEMS (IF ANY) FOR COMMENT AND APPROVAL
2 ALL STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL & M-E DRAWINGS THE CONTRACTOR SHOULD INFORM THE ENGINEER ANY DISCREPANCIES WHICH MAY
BE FOUND AMONGST THESE DRAWINGS
3 ALL LEVEL SHOWN IN METRES BASED ON THE ASSUMED FINISHED LEVEL OF +0.000m ON GROUND FLOOR EQUIVALENT TO THE NATIONAL DATUM OF +8.350m
4 SUBSOIL UNDERNEATH ALL FOUNDATIONS SHALL BE INSPECTED BY THE SUPERVISING ENGINEER BEFORE LAYING OF BLINDING LAYER
5 100MM THICK BLINDING LAYER OF GRADE B10 TO TCVN 5574 : 2012 WITH 1 X 2 AGGREGATES TO BE USED FOR ALL ITEMS SHOW ON STRUCTURAL DRAWINGS UNLESS NOTED OTHERWISE
6 CONCRETE GRADE B30 SHALL BE USED TO ALL STRUCTURAL ITEMS OF THE PROJECT
7 CONCRETE SHALL BE PROVIDED BY A SUPPLIER REGISTERED UNDER THE QUALITY SCHEME FOR THE PRODUCTION AND SUPPLY OF CONCRETE
8 CONCRETE MIX WITH A NORMAL SLUMP LESS THAN 75MM SHALL NOT BE USED UNLESS THE CONTRACTOR CAN DEMONSTRATE THAT PROPER COMPACTION CAN BE ACHIEVED WITH A LOWER SLUMP AND IN
NO CASE BE LESS THAN 50 MM THE SLUMP SHOULD BE SPECIFIED AS BELOW:
CONCRETE FOR FLOOR : 100 ± 20 MM CONCRETE FOR COLUMN : 120 ± 20 MM CONCRETE FOR CORE WALL : 120 ± 20 MM
9 WHEN DESIGN MIXES OF CONCRETE, THE CEMENTITIOUS CONTENT SHALL NOT BE LESS THAN 350KG/M³
10 MINIMUM COVER TO REINFORCEMENT TO BE AS FOLLOWS (MM):
42
NUMBER OF BARS
BAR TYPE
BAR NUMBER BAR SPACING (MM)
DIAMETER OF BAR (MM)
ONE - WAY SLAB:
TWO - WAY SLAB:
BEAM SLAB COLUMN CORE WALL STAIRCASE BALCONY WALL
35 (45)
35 (40) 35 35 35 30
25 (30)
25 (35) 25 25 35 20
NOTES:
A MINIMUM COVER TO REINFORCEMENT SHALL BE THE VALUES AS SHOWN IN THE ABOVE TABLE OR THE BAR DIAMETER WHICHEVER IS THE GREATER
B VALUES IN THE BRACKET ARE FOR SINGLE SPAN ELEMENT
C MINIMUM COVER TO REINFORCEMENT OF ELEMENTS CAST DIRECTLY AGAINST BLINDING LAYERS TO BE 50 MM, COVER TO SIDES TO BE 50MM
D MINIMUM COVER TO REIINFORCEMENT OF WATER TANK ELEMENT OR WATERTIGHT CONSTRUCTION IS 40 MM
E FOR ALL ELEMENTS EXPOSED DIRECTLY TO WEATHER, MINIMUM COVER TO REINFORCEMENT SHALL BE 35 MM
F THE COVER TO BOTTOM REINFORCEMENT STEEL FOR PILECAP SHALL BE 100MM
11 REINFORCEMENT TO BE IN ACCORDANCE WITH TCVN 5574 : 2012 HIGH YIELD STEEL BAR A III YIELD STRENGTH = 390 N/MM² (Ø > 10MM) DENOTED AS T MILD STEEL A II YIELD STRENGTH = 295 N/MM² (Ø 10MM) DENOTED AS R
26 THE CONTRACTOR SHOULD PROVIDE STEEL CHAIRS TO SUPPORT THE TOP STEEL LAYERS INSIDE THE SLAB, STAIR FLIGHT AND FOUNDATION HAVING MORE THAN 150 MM THICKNESS AND U BARS TO HOLD VERTICAL BARS INSIDE CORE WALL
27 HOLES AND POCKETS IN STRUCTURAL ELEMENTS SHALL NOT BE ALLOWED UNLESS AGREED BY THE ENGINEER
28 NO TROPICAL HARDWOOD PROPPING SHALL BE USED TO SUPPORT ALL FORMWORK FOR CONCRETE WORK EXCEPT AGREED OTHERWISE BY THE ENGINEER
29 THE DESIGN OF FORMWORK OR FALSEWORK THAT NO PART OF THE FORMWORK OR FALSEWORK CAN IMPAIR THE FINISHED SURFACE OF THE CONCRETE
30 THE DESIGN OF FORMWORK OR FALSEWORK INCLUDING SUPPORTS AND FOUNDATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO COMMENCEMENT OF ANY SUCH CONSTRUCTION ACTIVITY THE METHOD STATEMENT FOR DISMANTLING OF FALSEWORK AND FORMWORK SHALL BE SUBMITTED TO THE ENGINEER FOR AGREEMENT BEFORE WORKS COMMENCE
31 ALL WATERSTOPS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION AND BE SECURELY HELD IN POSITION MAKE ALL JOINTS PROPERLY, USING HOT
OR COLD VULCANISING PREVENT EDGE-BULBS FROM MOVING DURING CONCRETING SPECIAL CARE SHALL BE TAKEN TO COMPACT CONCRETE AROUND WATERSTOPS SUCH THAT NO VOIDS OR POROUS AREAS RESULT
32 THE POSITION AND METHOD OF FORMING CONSTRUCTION JOINTS INCLUDING SAMPLE TREATMENT SHALL BE SUBMITTED AND APPROVED PRIOR TO WORK ON SITE
33 UNLESS OTHERWISE STATED, FORMWORK TO ALL CANTILEVER BEAMS/SLABS AND BEAMS WITH SPAN GREATER THAN 6M SHALL BE PRE-CAMBERED AS FOLLOWS:
A SPANNING BETWEEN SUPPORTS 0.2% OF SPAN LENGTH AT MID-SPAN
B CANTILEVER 0.4% OF SPAN AT FREE END
34 NON STRUCTURAL CONCRETE WALLS ARE NOT SHOWN ON STRUCTURAL FRAMING PLANS REFER TO ARCHITECTURAL DRAWING FOR LOCATIONS
35 THE CONTRACTOR SHALL PREPARE THE COMBINED BUILDER WORKS DRAWING FOR THE ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION
36 FOR ALL WATERPROOFING DETAILS, REFER RELEVANT ARCHITECTURAL DRAWINGS
37 FOR EXACT LOCATION AND DETAILS OF MANHOLE, SUMP PIT, GREASE INTERCEPTOR, PETROL INTERCEPTOR ETC , REFER TO SERVICES ENGINEER'S DRAWING ALL WALLS AND SLABS OF THESE ELEMENTS ARE TO BE MIN 200MM THK UNLESS OTHERWISE STATED
38 WATERPROOFING CONSTRUCTION SHALL BE CARRIED OUT IN ALL WALL STRUCTURE, BEAM, SLAB AT UNDERGROUND AND CONCRETE TO BE CASTED DIRECTLY AGAINST SOIL SHALL BE B30 (WATERPROOF)
39 AFTER COMPLETION OF THE SUBSTRUCTURER, ALL VOIDS SHALL BE BACKFILLED TO THE GROUND LEVELS WITH APPROVED WELL COMPACTED MATERIAL UNLESS OTHERWISE INSTRUCTED BY ENGINEER, THE RELATIVE COMPACTION SHALL ACHIEVE 90% OF THE MAXIMUM DRY DENSITY UNLESS OHTHERWISE SPECIFIED
40 ALL CONSTRUCTION JOINTS IN WALLS, BEAMS AND SLABS IN CONTACT WITH EARTH SHALL BE PROVIDED WITH EXTERAL WATER BARS, PUDDLE FLANGE IS TO BE USED IN ALL SERVICE OPENING THROUGH STRUCTURAL ELEMENTS IN CONTACT WITH EARTH
41 THE CLIENT SHOULD SET UP THE LOCATIONS FOR MONITORING TO CONTROL BUILDING SETTLEMENT AS DEFINED IN THE REGULATION OF VIETNAMESE STANDARD (TCXDVN-357: 2005) ABBREVIATIONS IN RC DRAWINGS:
ALL REINFORCEMENT
CÁC LỚP CỐT THÉP TRÊN TÍNH TỪ MẶT TRÊN CÙNG CÁC LỚP CỐT THÉP DƯỚI TÍNH TỪ MẶT DƯỚI CÙNG LUÂN PHIÊN CÁCH ĐỀU
T1, 2
B1, 2
AP
CỐT THÉP CHỮ U UB
CHIỀU DÀI THAY ĐỔI L.V
ĐOẠN NỐI CHỒNG LAP
LUÂN PHIÊN SO LE AS
LAYER OF TOP REINFORCEMENT FROM UPPER FACE LAYERS OF BOTTOM REINFORCEMENT FROM THE BOTTOM FACE ALTERNATE PLACED
T1, 2
B1, 2
AP
U BAR UB
LENGTH VARIES L.V
TENSION LAP LENGTH LAP
ALTERNATE STAGGERED AS
4 200 25 T
-4 200 25 T
12 CỐT THÉP PHẢI ĐƯỢC CẤT GIỮ TRONG ĐIỀU KIỆN SẠCH SẼ KHÔNG BỊ RỈ SÉT TẠI THỜI ĐIỂM ĐẶT VÀ ĐỔ BÊ TÔNG SAU ĐÓ
13 CỐT THÉP SẼ ĐƯỢC GIA CÔNG THEO ĐÚNG TCXD 4453 : 1995
TRƯỚC KHI LẮP ĐẶT VÀO VỊ TRÍ BÁN KÍNH TRONG CỦA CÁC ĐƯỜNG CONG ÍT NHẤT BẰNG 5 LẦN ĐƯỜNG KÍNH THANH THÉP TRỪ KHI NHÀ THẦU CÓ THỂ THUYẾT MINH RẰNG BÁN KÍNH TRONG NHỎ HƠN CÓ THỂ SỬ
DỤNG ĐƯỢC NHÀ THẦU PHẢI UỐN THÉP THỬ THEO BÁN KÍNH ÍT NHẤT BẰNG PHÂN NỬA BÁN KÍNH YÊU CẦU CHO CỐT THÉP THI CÔNG
14 BÊ TÔNG ĐƯỢC PHÂN LOẠI TRÊN CƠ SỞ CƯỜNG ĐỘ NÉN TRUNG BÌNH Ở NGÀY THỨ 28 CÙNG VỚI CỠ CỐT LIỆU TỐI ĐA, THÀNH PHẦN XI MĂNG TỐI THIỂU VÀ TỶ LỆ NƯỚC - XI MĂNG TỐI ĐA CÁC YÊU CẦU ĐƯỢC QUI ĐỊNH NHƯ
SAU CHO 1m BÊ TÔNG:
LOẠI BÊ TÔNG : B30
CƯỜNG ĐỘ NÉN TRUNG BÌNH KHỐI LẬP PHƯƠNG Ở NGÀY 28 (MPa ) : 38.53 MPa
CỠ CỐT LIỆU TỐI ĐA (mm) : 20
THÀNH PHẦN XI MĂNG TỐI THIIỂU (KG) : 400
TỈ LỆ NƯỚC - XI MĂNG TỐI ĐA : 0.55
15 VẬT LIỆU XI MĂNG PHẢI LÀ XI MĂNG PORTLAND THÔNG THƯỜNG (OPC) TUÂN THỦ TCVN 2682 - 2009: XI MĂNG PORTLAND - YÊU CẦU KỸ THUẬT
16 XI MĂNG PHẢI ĐƯỢC GIỮ KHÔ RÁO TRONG KHI CHUYÊN CHỞ VÀ Ở TÌNH TRẠNG TỐT TRÊN MỖI THÙNG CHỨA PHẢI GHI RÕ LOẠI XI MĂNG VÀ TÊN NHÀ SẢN XUẤT
17 TẤT CẢ XI MĂNG PHẢI ĐƯỢC LƯU GIỮ TRÁNH KHỎI ÁNH NẮNG, MƯA VÀ HƠI ẨM KHÔNG DÙNG XI MĂNG BỊ VỠ TÁCH RỜI TRÊN SÀN HOẶC ĐÃ CỨNG XI MĂNG PHẢI ĐƯỢC SỬ DỤNG THEO THỨ TỰ NHẬN ĐƯỢC
TRÊN CÔNG TRƯỜNG
18 CỐT LIỆU PHẢI LÀ VẬT LIỆU TỰ NHIÊN TRỪ KHI CÓ QUI ĐỊNH KHÁC CỐT LIỆU TUÂN THỦ THEO TCVN 7570 : 2006 VÀ DO NHÀ THẦU CHỌN, PHẢI ĐƯỢC CHỦ ĐẦU TƯ CHẤP THUẬN TRƯỚC KHI NHÀ THẦU SỬ DỤNG CỐT
LIỆU ĐÓ TRONG THI CÔNG
19 NHÀ THẦU PHẢI TIẾN HÀNH ĐIỀU TRA VÀ TIẾN HÀNH THỬ SẢN PHẨM ĐÁ ĐÓ TRONG PHÒNG THÍ NGHIỆM CÁC PHÉP THỬ PHẢI BAO GỒM SỰ HẤP THU TRỌNG LƯỢNG RIÊNG, SỰ BÀO MÒN la, ĐỘ VỮNG CHẮC BẰNG
NATRI SULPHAT, TẠP CHẤT HỮU CƠ VÀ BẤT KÌ PHÉP THỬ NÀO KHÁC CẦN THIẾT ĐỂ CHỨNG MINH CÓ THỂ TẠO RA CÁC CỐT LIỆU CÓ CHẤT LƯỢNG CHẤP NHẬN ĐƯỢC TỪ MỎ ĐÁ ĐỀ XUẤT
21 NHÀ THẦU PHẢI THỰC HIỆN VIỆC THỬ NGHIỆM VÀ TRỘN THỬ BÊ TÔNG, VIỆC TRỘN VÀ CÁC THÍ NGHIỆM LIÊN QUAN PHẢI ĐƯỢC HOÀN THÀNH TRONG THỜI GIAN SỚM NHẤT CÓ THỂ HỖN HỢP BÊ TÔNG ĐƯỢC TẠO RA
PHẢI LÀ LOẠI HỖN HỢP CÓ TỶ LỆ NƯỚC VÀ XI MĂNG KHÔNG VƯỢT QUÁ 0.55 HỖN HỢP THỬ TRONG PHÒNG THÍ NGHIỆM VÀ TRÊN CÔNG TRƯỜNG CÓ MỨC GIỚI HẠN VỀ CƯỜNG ĐỘ NÉN LÀ 120KG/CM ĐỐI VỚI TẤT CẢ CÁC LOẠI BÊ TÔNG
22 CƯỜNG ĐỘ NÉN MẪU LẬP PHƯƠNG SẼ ĐƯỢC XÁC ĐỊNH THEO ĐÚNG TCVN 5574 : 2012 HOẶC CÁC TIÊU CHUẨN TƯƠNG ĐƯƠNG TỶ LỆ NƯỚC - XI MĂNG ĐƯỢC ÁP DỤNG THỰC TẾ PHẢI LÀ NHỮNG GIÁ TRỊ THẤP NHẤT
CẦN THIẾT ĐỂ ĐẠT ĐƯỢC KHẢ NĂNG SỬ DỤNG YÊU CẦU ĐỐI VỚI THÀNH PHẦN NHẤT ĐỊNH CỦA CÔNG TRÌNH NHƯNG KHÔNG ĐƯỢC VƯỢT MỨC TỐI ĐA QUI ĐỊNH Ở TRÊN
23 NHÀ THẦU PHẢI SỬ DỤNG CHẤT PHỤ GIA ĐÃ ĐƯỢC CHỦ ĐẦU TƯ CHẤP THUẬN CHẤT PHỤ GIA PHẢI TUÂN THEO TCXDVN 8826 - 2011, KHÔNG CHẤT PHỤ GIA NÀO ĐƯỢC PHÉP CHỨA QUÁ 0.02% CAN XI CLORUA KHÔ
TRONG TỔNG TRỌNG LƯỢNG XI MĂNG THÀNH PHẦM
24 NHÀ THẦU PHẢI SỬ DỤNG NƯỚC SẠCH, KHÔNG NHIỄM AXIT, KIỀM, MUỐI, CHẤT HỮU CƠ HAY CÁC TẠP CHẤT KHÁC CÓ THỂ GÂY HẠI CHO BÊ TÔNG HOẶC CỐT THÉP
25 THÀNH PHẦN NƯỚC CỦA CỐT LIỆU BÊ TÔNG PHẢI ĐƯỢC XEM XÉT NHƯ LÀ NƯỚC TRỘN THÀNH PHẦN NƯỚC CỦA CỐT LIỆU PHẢI ĐƯỢC XÁC ĐỊNH THEO TCXDVN 4506 - 2012 LƯỢNG SULPHAT CÓ TRONG
SULPHUR ANHYDRIDE KHÔNG ĐƯỢC VƯỢT QUÁ 1G/L
3
12 REINFORCEMENT MUST BE STORED IN A CLEAN CONDITION, NOT TO BE RUSTED AT THE TIME OF FIXING AND CONCRETING
13 REINFORCEMENT TO BE CUT AND BENT IN ACCORDANCE WITH TCXD 4453 : 1995 BEFORE FIXING INTO THE POSITION, THE INTERNAL RADIUS OF THE BENDS MUST BE AT LEAST EQUAL TO 5 TIMES THE REBAR DIAMETER, UNLESS THE CONTRACTOR CAN DEMONSTRATE THAT A SMALLER INTERNAL RADIUS CAN BE USED THE CONTRACTOR MUST CARRY OUT A TRIAL BENT TEST FOR THE INTERNAL RADIUS AT LEAST EQUAL TO HALF OF THE RADIUS REQUIRED FOR CONSTRUCTION
14 CONCRETE TO BE SPECIFIED BASED ON THE MEAN CHARACTERISTIC CUBE STRENGTH AT 28 -DAY, TOGETHER WITH THE MAXIMUM AGGREGATE SIZE, AND THE MINIMUM WATER / CEMENT RATIO THE REQUIREMENTS FOR 1m OF CONCRETE ARE SHOWN AS BELOW:
CONCRETE TYPE : MEAN COMPRESIVE CUBE STRENGTH - 28 DAY (MPa ) : MAXIMUM AGGREGATE SIZE (mm) : MINIMUM CEMENT CONTENT (KG) : MAXIMUM WATER / CEMENT RATIO :
15 CEMENT TO BE ORDINARY PORTLAND CEMENT (OPC) IN ACCORDANCE WITH TCVN 2682 : 1999 PORTLAND CEMENT: TECHNICAL REQUIREMENTS
16 CEMENT MUST BE STORED IN A DRY AND GOOD CONDITION DURING TRANSPORTATION ON EACH OF THE CONTAINER, CEMENT TYPE AND NAME OF THE PRODUCER MUST BE LABELLED
17 CEMENT MUST BE STORED AWAY FROM DIRECT SUNLIGHT, RAIN AND HUMIDITY NOT TO USE THE CEMENT WHICH ARE DROPPED ON THE FLOOR OR HARDENED CEMENT MUST BE USED IN THE ORDER THAT HAS RECEIVED ON SITE
18 AGGREGATES MUST BE NATURAL TYPE UNLESS OTHERWISE SPECIFIED AGGREGATES TO BE IN ACCORDANCE WITH TCVN 7570 : 2006 AND SELECTED BY THE CONTRACTOR, BUT SUCH A SELECTION MUST BE APPROVED BY THE CLIENT BEFORE USING IT ON SITE
19 THE CONTRACTOR MUST CARRY OUT AN INVESTIGATION AND TESTING SUCH AGGREGATES IN THE LABORATORY THE TESTS MUST INCLUDE THE ABSORPTION OF SPECIFIC GRARITY, ABRASION la, RIGIDITY BY SULPHATE NATRI, ORGANIC MATTERS AND ANY OTHER TESTS THAT MAY BE NECESSARY TO DEMONSTRATE THAT SUCH AGGREGATE HAS THE ACCEPTABLE QUALITY FROM THE STONE QUARRY
21 THE CONTRACTOR MUST CARRY OUT THE TESTS AND TRIAL MIX OF CONCRETE, MIXING AND RELEVANT TESTS MUST BE COMPLETED AS SOON AS POSSIBLE THE CONCRETE MIX MUST HAVE THE WATER / CEMENT RATIO NOT GREATER THAN 0.55 THE LABORATORY TRIAL TEST MIX AND ON SITE HAS A LIMIT ON COMPRESSIVE STRENGTH OF 120 KG/CM FOR ALL TYPES OF CONCRETE
22 THE COMPRESSIVE CUBE STRENGTH TO BE DETERMINED IN ACCORDANCE TO TCVN 5574 : 2012 OR EQUIVALENT STANDARDS THE ACTUAL WATER / CEMENT RATIO MUST BE THE LOWEST VALUE TO OBTAIN THE STRENGTH REQUIRED FOR THIS PARTICULAR PROJECT, BUT MUST EXCEED THE MAXIMUM RATIO AS STATED ABOVE
23 THE CONTRACTOR MUST USE THE ADMIXTURES THAT HAS BEEN APPROVED BY THE CLIENT THE ADMIXTURES MUST BE IN ACCORDANCE TO TCXDVN 8826 - 2011, NO ADMIXTURES HAS BEEN ALLOWED TO CONTAIN MORE THAN 0.02% DRY CLORUR CALCIUM IN THE CONCRETE BY WEIGHT
24 THE CONTRACTOR MUST USE CLEAN WATER, NOT BEING CONTAMINATED BY ACID, BASE, SALT, ORGANIC MATTER OR OTHER FOREIGN MATTERS WHICH CAN CAUSE HARM TO THE CONCRETE OR REINFORCEMENT
25 WATER CONTAINED IN AGGREGATES MUST BE CONSIDERED AS THE MIXING WATER, AND TO BE DETERMINED IN ACCORDANCE TO TCXDVN 4506 - 2012 THE AMOUNT OF SULPHATE IN SULPHUR ANHYDRIDE MUST NOT EXCEED 1G/L
3
2 2
STRUCTURAL SLAB LEVEL IS DENOTED AS SSL
20 CÁC PHƯƠNG PHÁP VÀ TRÌNH TỰ KIỂM TRA CƯỜNG ĐỘ CỐT LIỆU THÔ PHẢI TUÂN THỦ THEO CÁC YÊU CẦU CỦA TCVN 7570 : 2006 CỐT LIỆU CHO BÊ TÔNG VÀ VỮA - YÊU CẦU KỸ THUẬT 20 THE METHOD AND TEST PROCEDURES FOR THE STRENGTH OF AGGREGATES MUST BE IN ACCORDANCE WITH TCVN 7570: 2006 AGGREGATES FOR CONCRETE AND MORTAR.
KHI GIA CÔNG TUÂN THEO TCVN 198: 1985
CÁC MẪU THÉP PHẢI ĐƯỢC NHÀ THẦU LẤY TỪ MỖI MẺ THÉP ĐƯỢC GIAO ĐẾN CÔNG TRƯỜNG THỬ MẪU PHẢI ĐƯỢC TIẾN HÀNH THEO TCVN 197: 1985 VÀ TẦN SỐ KIỂM TRA TRƯỚC REINFORCEMENT SAMPLES MUST BE TAKEN BY THE CONTRACTOR FROM EACH BATH OF STEEL DELIVERED TO SITE TESTING OF SAMPLES MUTS BE CARRIED OUT IN ACCORDANCE TO TCVN 197 : 1985 AND THE
FREQUENCY OF TESTS BEFORE FABRICATION MUST BE IN ACCORDANCE TO TCVN 198 : 1985
MỖI MẶT
B30 38.53 MPa 20 400 0.55
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
GENERAL NOTES
HASV-BD-0001
NTS
Trang 4150mm MIN.
D
2
D
<70mm
8D MIN
10D MAX
MIN
75mm
r
r
r r
<70mm 10D MAX
8D MIN
r
4D MIN 6D MAX
10D MAX
8D MIN
<70mm
r
r
8D MIN 10D MAX.
r
r
<70mm
10D MAX
8D MIN
<70mm 10D MAX
8D MIN
a/2
4
'L'
3
'L'
5.5D
4D
r
8D MIN
<70mm 10D MAX
Ø10-300 Ø10-300
THÉP BỔ SUNG = 1 THANH TRÊN & THANH DƯỚI CHO CẢ 4 BÊN, CÙNG ĐƯỜNG KÍNH VỚI THÉP SÀN THANH LIÊN TỤC THEO HƯỚNG ĐANG CỨU XÉT
THANH - U TRÊN TẤT CẢ CÁC BÊN, ĐOẠN CHỒNG BẰNG 42D VỚI THÉP SÀN BỊ GIÁN ĐOẠN, ĐƯỜNG KÍNH NHỎ HƠN MỘT BẬC ĐƯỜNG KÍNH CỦA THÉP SÀN BỊ GIÁN ĐOẠN THEO HƯỚNG ĐANG CỨU XÉT.
THÉP SÀN LIÊN TỤC PHẢI ĐƯỢC BỐ TRÍ XUYÊN SUỐT CẠNH 2 BÊN LỖ (TRÊN VÀ DƯỚI)
THÉP SÀN BỊ GIÁN ĐOẠN
THÉP BỐ TRÍ THEO ĐƯỜNG CHÉO LỚP THỨ 3, 4 THANH TRÊN & 4 THANH DƯỚI ĐƯỜNG KÍNH GIỐNG NHƯ THANH THÉP SÀN LỚN NHẤT
BỊ GIÁN ĐOẠN
CHI TIẾT TRIM ĐIỂN HÌNH CHO CÁC LỖ HỔNG TRÊN SÀN
NHỎ HƠN 500MM, SÀN DÀY HƠN 150MM
r = 3D THÉP CƯỜNG ĐỘ CAO 5mm + ĐƯỜNG KÍNH CỦA THÉP CHÍNH CÁI NÀO LỚN HƠN THÌ CHỌN
KÍCH THƯỚC UỐN THÉP CỦA THÉP ĐAI
THÉP ĐAI
THÉP CỘT
2mm HOẶC 5mm + ĐƯỜNG KÍNH CỦA THÉP CHÍNH CÁI NÀO LỚN HƠN THÌ CHỌN
MÉP CONG CỦA THÉP CƯỜNG ĐỘ CAO
THÉP CƯỜNG ĐỘ CAO
CHI TIẾT ĐIỂN HÌNH CHO SÀN VỚI MƯƠNG TRŨNG
THAM KHẢO THÉP SÀN
CHI TIẾT CỐT THÉP ĐIỂN HÌNH CHO MỐ BÊ TÔNG
THÉP BỔ SUNG = TIẾT DIỆN THÉP TRÊN HOẶC DƯỚI BỐ TRÍ ĐỀU NHAU CẠNH LỖ, HOẶC CÙNG ĐƯỜNG KÍNH VỚI THÉP
SÀN HOẶC ĐƯỜNG KÍNH LỚN HƠN 1 BẬC
VÀ BỐ TRÍ THEO DẢI NHƯ HÌNH VẼ
THÉP SÀN KHÔNG BỊ GIÁN ĐOẠN PHẢI ĐƯỢC BỐ TRÍ XUYÊN SUỐT CẠNH 2 BÊN LỖ (TRÊN VÀ DƯỚI)
THÉP SÀN BỊ GIÁN ĐOẠN BỞI LỖ = 1 THANH TRÊN
VÀ/HOẶC 2 THANH DƯỚI
THÉP BỔ SUNG = TIẾT DIỆN THÉP TRÊN HOẶC DƯỚI
BỐ TRÍ ĐỀU NHAU CẠNH LỖ, HOẶC CÙNG ĐƯỜNG KÍNH VỚI THÉP SÀN HOẶC ĐƯỜNG KÍNH LỚN HƠN 1 BẬC
VÀ BỐ TRÍ THEO DẢI NHƯ HÌNH VẼ
THÉP SÀN BỊ GIÁN ĐOẠN BỞI LỖ = 3 THANH TRÊN VÀ/HOẶC 4 THANH DƯỚI
THÉP BỐ TRÍ THEO ĐƯỜNG CHÉO LỚP THỨ 3, 4 THANH TRÊN
& 4 THANH DƯỚI ĐƯỜNG KÍNH GIỐNG NHƯ THANH THÉP SÀN LỚN NHẤT BỊ GIÁN ĐOẠN
THÉP SÀN BỊ GIÁN ĐOẠN BỞI LỖ = 1 THANH TRÊN VÀ/HOẶC 2 THANH DƯỚI
THANH - U TRÊN TẤT CẢ CÁC BÊN, ĐOẠN CHỒNG BẰNG 42D VỚI THÉP SÀN BỊ GIÁN ĐOẠN, ĐƯỜNG KÍNH BẰNG ĐƯỜNG KÍNH CỦA THÉP SÀN KHÔNG BỊ GIÁN ĐOẠN
THEO HƯỚNG ĐANG CỨU XÉT
THÉP SÀN BỊ GIÁN ĐOẠN BỞI LỖ = 3 THANH TRÊN VÀ/HOẶC 4 THANH DƯỚI
CHI TIẾT TRIM ĐIỂN HÌNH CHO CÁC LỖ HỔNG TRÊN SÀN 500MM, SÀN DÀY HƠN 150MM
CHIỀU DÀI MỐI NỐI CHỒNG
MÁI DỐC 1:12 (MÁI DỐC TỐI ĐA 1:10)
CHIỀU DÀI MỐI NỐI CHỒNG
MỐI NỐI CHỒNG (KHÔNG GÃY) CHO THÉP TRONG TƯỜNG, SÀN & CẦU THANG
MỐI NỐI CHỒNG (KHÔNG GÃY) CHO THÉP TRONG DẦM & CỘT
THÉP NẮP
(KHÔNG CÓ DẦM TRIM)
'L' KHÔNG NHỎ HƠN 300MM
'L' NHƯ TRÊN BẢNG 1
REQUIRED FOR BOTH DIRECTIONS
SLAB STEEL INTERRUPTED BY HOLE = AS 1 TOP
AND/OR AS 2 BOTTOM
BUT CONFINE TO A STRIP WIDTH AS SHOWN
AS THE BASIC SLAB REINFORCEMENT OR ONE DIA LARGER PLACED EVENLY EACH SIDE OF HOLE, EITHER USE SAME BAR DIA
ADDITIONAL REINFORCEMENT = AS TOP AND/OR AS BOTTOM
NORMAL UNINTERRUPTED SLAB STEEL TO CARRY THROUGH ADJACENT TO HOLE (TOP AND/OR BOTTOM)
ADDITIONAL REINFORCEMENT = AS TOP AND/OR AS BOTTOM PLACED EVENLY EACH SIDE OF HOLE, EITHER USE SAME BAR DIA
AS THE BASIC SLAB REINFORCEMENT OR ONE DIA LARGER
BUT CONFINE TO STRIP WIDTH AS SHOWN
TO BE SAME AS LARGEST MAIN SLAB BAR INTERRUPTED BY THE HOLE
DIAGONAL BARS IN 3rd LAYER, 4 NO TOP & 4 NO BOTTOM, BAR DIA
SLAB STEEL INTERRUPTED BY HOLE = AS TOP 1 AND/OR AS 2 BOTTOM
IN THE DIRECTIONBEING CONSIDERED
SLAB BARS, SAME DIA AS LARGEST INTERRUPTED BAR
U BARS ON ALL SIDES TO LAP 42D WITH INTERRUPTED SLAB STEEL INTERRUPTED BY HOLE = AS 3 TOP AND/OR AS 4 BOTTOM
SLAB STEEL INTERRUPTED BY HOLE = AS 3 TOP AND/OR AS 4 BOTTOM
UNINTERRUPTED BAR IN THE DIRECTION BEING CONSIDERED.
ON ALL 4 SIDES, SAME BAR DIA AS THE LARGEST ADDITIONAL REINFORCEMENT = 1 BAR TOP & 1 BAR BOTTOM
(TOP AND/OR BOTTOM) THROUGH ADJACENT TO HOLE
SLAB STEEL TO CARRY NORMAL UNINTERRUPTED
BAR DIA TO BE SAME AS LARGEST
BY THE HOLE.
MAIN SLAB BAR INTERRUPTED
DIAGONAL BARS IN 3rd LAYER,
4 NO TOP & 4 NO BOTTOM,
BAR IN THE DIRECTION BEING CONSIDERED.
INTERRUPTED SLAB BARS
U BARS ON ALL SIDES TO LAP 42D WITH INTERRUPTED SLAB BARS, ONE BAR DIA.
LESS THAN THE LARGEST INTERRUPTED
r = 3D FOR H.Y BAR OR 5mm + DIA.OF MAIN BAR WHICHEVER IS GREATER
CLOSER
WHICHEVER IS GREATER 2r OR 5mm + DIA OF COLUMN BAR
COLUMN REINFORCEMENT
LINKS
(WITHOUT TRIMMING BEAMS)
REFER SLAB REINF'T (TYP.) r
TYPICAL R.C DETAILS FOR BENDING DIMENSIONS OF LINKS
SLAB WITH DISC CHANNEL
TYPICAL SLAB TRIMMING DETAILS FOR OPENING SIZE LESS THAN 500mm.
SLAB THICKNESS GREATER THAN 150mm.
>
TYPICAL SLAB TRIMMING DETAILS FOR OPENING SIZE GREATER THAN 500mm SLAB THICKNESS GREATER THAN 150mm
TYPICAL CONCRETE PLINTH R.C DETAIL
H.Y STEEL MIN BEND OF STEEL
LAPS (WITH CRANK) FOR STEEL IN BEAMS & COLUMNS
LAPS (WITHOUT CRANK) FOR STEEL IN WALLS, SLAB & STAIRCASE
BASEMENT LEVEL
1000
TOP REINFORCEMENTS
BOTTOM REINFORCEMENTS BAR CHAIRS T25-2500c/c BW
BAR CHAIR ARRANGEMENT ON PLAN (MẶT BẰNG BỐ TRÍ THÉP ĐỠ LỚP TRÊN CỦA MÓNG)
SECTION 1-1
CONTRACTOR SHALL VERIFY THE ADEQUACY AND BE RESPONSIBLE FOR STRENGTH & STABILITY OF THESE BAR CHAIRS IF USED AS SUPPORTS OF TOP REINFORCEMENT
T12 TIES TO BE PROVIDED FOR STABILITY SPACINGS AS SHOWN
ON PLAN
2500
T12 TIES
900 600
2500
1 NHÀ THẦU PHẢI KIỂM TRA SỰ TƯƠNG XỨNG VÀ CÓ TRÁCH NHIỆM XEM XÉT CƯỜNG ĐỘ VÀ ỔN ĐỊNH CỦA CÁC
HỆ THÉP ĐỠ NÀY NẾU DÙNG ĐỂ CHỐNG LỚP THÉP TRÊN
THANH T25 CÁCH KHOẢNG 2500, 2 PHƯƠNG
GHI CHÚ:
NHÀ THẦU CHỈ SỬ DỤNG CHI TIẾT ĐIỂN HÌNH NÀY NẾU KHÔNG CÓ CÁC CHI TIẾT KHÁC GHI TRÊN CÁC BẢN VẼ TƯƠNG ỨNG
NOTE:
CONTRACTER ONLY USE THIS TYPICAL DETAIL IF THERE IS NO OTHER DETAILS SHOWN ON CORRESPONDING DRAWING
BÊ TÔNG LÓT LEAN MIX CONCRETE
1
1
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
TYPICAL DETAILS 1
HASV-BD-0002
NTS
Trang 5MESH REINFORCEMENT
* CHIỀU DÀY THỂ HIỆN TRÊN MẶT BẰNG
WATERPROOFING MEMBRANE
FIBRE REINFORCED CONCRETE SLAB
CÁT ĐẦM CHẶT 150mm
150 THK COMPACTED GRANULAR MATERIAL
SSL
LƯỚI THÉP
MÀNG CHỐNG THẤM
* THICKNESS AS SHOWN ON PLAN
10mm
FILLER
U/S BEAM OR SLAB
U/S OF SLAB
OR BEAM
PREFABRICATED GALVANISED STRAP
AT 800 c/c 2.5mm THICK REFER DETAIL 4 SHOT FIXING (2 NO.)
30
75
15 50
200 10mm WEAK MORTAR PACKING
50
15
U/S RC SLAB
TYP
R.C COLUMN
SEALANT ON BOTH SIDES AS PER SPECIFICATIONS
NOTE:- JOINT TO BE PROVIDED THROUGH PLASTER & FINISH WHERE APPLICABLE
SEALANT ON BOTH SIDES
AS PER SPECIFICATIONS
U/S BEAM
OR SLAB
TẤM KIM LOẠI BẢO VỆ TẤT CẢ CÁC MỐI NỐI
METAL LATH TO COVER ALL JOINTS
R.C WALL
30mm x 1.5mm THK STAINLESS STEEL TIE SHOT FIXED TO WALL AT ALTERNATE COURSES
(MIN 2 FIXINGS)
PLASTER STOP ON BOTH SIDES OF JOINT (TYP.)
WEAK MORTAR
GALVANISED STEEL FLAT
300 x 50 x 2.5mm THK DEBONDED ON ONE SIDE AT ALTERNATE COURSES
VẬT LIỆU TRÁM SEALANT TRÊN 2 MẶT THEO TIÊU CHÍ KỸ THUẬT
DEBONDED GALVANISED MILD STEEL FLAT 300x50x2.5 SHOT-FIXED TO POST ALTERNATE COURSES
SEALANT ON BOTH SIDES AS PER SPECIFICATIONS
GHI CHÚ: KHOẢNG CÁCH TỐI ĐA 6M
NHÀ THẦU PHẢI DỆ TRÌNH CÁC VỊ TRÍ CHO TƯ VẤN NOTE: MAXIMUM SPACING 6m CONTRACTOR TO SUBMIT LOCATIONS FOR ENGINEER'S APPROVAL
BED JOINT REINF
SSL
MẶT ĐỨNG CỬA ĐI & CỬA SỔ ĐỔ BT MÁC 50 DÀY NỬA VIÊN GẠCH (100mm)
CỬA SỔ
LINTEL
CỬA ĐI
C
REINF SYMM
BED JOINT REINF
L
30mm x 1.5mm THK GALVANISED HOOP-IRON ANGLE SHOT FIXED TO COLUMN
AT ALTERNATE COURSE (MIN 2 FIXINGS)
1R20 DOWEL BAR 350 LONG DEBONDED IN POST
10mm COMPRESSIBLE FILLER FLEXCELL
OR SIMILAR APPROVED WITH SEALANT
WHERE VISIBLE
25mm DIA PURPOSE MADE CAP WITH COMPRESSIBLE FILLER
1R20 DOWEL BAR
TIES TO BE PROVIDED EVERY SECOND COURSE
2T16w/T10w-200
SỬ DỤNG EXPAMET CHO CÁC MỐI NỐI EXPAMET TO COVER ALL JOINTS
10mm
FILLER TƯỜNG GẠCH LỐC
C15/10 GROUT
150 TYP
3544.5
10
10
150
800
2T16w/T10w-200
150
CỐT THÉP GIẰNG
VERTICAL SIDES OF DOORS AND WINDOWS TO BE GROUTED WITH C15/10 CONC OVER A MIN OF HALF BLOCK
TYPICAL BLOCKWALL DETAILS
MẶT CẮT A
MẶT CẮT B
MẶT CẮT C CHI TIẾT LỖ TRỐNG TẠI CỬA ĐI / CỬA SỔ
MẶT CẮT D
MẶT CẮT E
THANH DOWEL TẠI CÁC MỐI NỐI DỰ ĐỊNH TRƯỚC
CHI TIẾT SÀN TRỰC TIẾP TRÊN ĐẤT
BÊTÔNG CỐT THÉP ĐỔ SAU KHI XÂY
TƯỜNG (CHỈ CHO TƯỜNG 200)
RC COLUMN
CỐT THÉP GIẰNG CÁCH KHOẢNG 2 LỚP GẠCH (CHỈ ÁP DỤNG CHO TƯỜNG BIÊN)
4200 MAX
DẦM GIẰNG / STIFF BEAM
BED JOINT REINFORCEMENT EVERY SECOND COURSE (FOR EXTERNAL WALL ONLY)
RC CONC POST CAST AFTER
BLOCKWORK (RESTRAINT POST)
200 THK WALLS ONLY
B
A ĐAI
12Ø OF BAR
OR EQUIVALENT ANCHORAGE (TYP.)
CLEAR SPAN
LINTEL SIZE REINFORCEMENT
WIDTH DEPTH A B LINKS
< 2500
>2500 < 4500
>4500 < 6500
SCHEDULE OF LINTELS UNO
Ø24 OF BAR STRAIGHT OR BOB THẲNG HOẶC CONG
NHÀ THẦU PHẢI ĐẢM BẢO THÉP CHỜ CHÍNH XÁC TRONG BÊTÔNG
NOTES:
1 BEARING ON BLOCK WALL ON EITHER SIDE OF OPENING SHALL BE
AT LEAST EQUAL TO THE OVERALL DEPTH OF THE LINTEL
2 OVERALL LINTEL DEPTHS COULD BE INCREASED TO SUIT BLOCK-WORK COURSING
B
A
LINKS
12Ø HOẶC TƯỜNG CHIỀU DÀI NEO TIÊU CHUẨN
12Ø OF BAR
OR EQUIVALENT ANCHORAGE (TYP.)
12Ø HOẶC TƯƠNG CHIỀU DÀI NEO TIÊU CHUẨN
Ø24
CONTRACTOR TO ENSURE CORRECT STARTER BARS ARE CAST INTO CONC
ELEMENTS AS NECESSARY
CONCRETE FACE LINKS
BẢNG THỐNG KÊ LANH TÔ - NGOẠI TRỪ GHI CHÚ KHÁC
GHI CHÚ:
1 CHIỀU DÀI GỐI VÀO TƯỜNG CHO MỖI BÊN LANH TÔ TỐI THIỂU BẰNG CHIỀU CAO LANH TÔ
2 CHIỀU CAO LANH TÔ CÓ THỂ TĂNG LÊN BẰNG MẶT HÀNG GẠCH XÂY
K.T LANH TÔ THÉP RỘNG CAO ĐAI NHỊP
RÃNH 25 x 25 QUANH ỐNG
VÀ TRÁM LẠI BẰNG MASTIC
BITUTHENE MASTIC HC
PUDDLE FLANGE WITH GRIT
25 x 25 CHASE AROUND PIPE PRIMED AND FILLED WITH MASTIC
CHI TIẾT ỐNG XUYÊN TƯỜNG BÊTÔNG
THROUGH RC WALL
LANH TÔ TIÊU CHUẨN TYPICAL STANDARD LINTELS MẶT ĐỨNG TƯỜNG
KẾT NỐI GIỮA TƯỜNG BÊ TÔNG VỚI TƯỜNG XÂY
KẾT NỐI GIỮA 2 TƯỜNG XÂY
E
CHI TIẾT 2
DETAILS 1
A A
CHI TIẾT 3 DETAILS 3
CHI TIẾT 4
DETAILS 4
40Ø OF BAR
E
NHỊP CLEAR SPAN
NHỊP CLEAR SPAN
WALL PANEL ELEVATION
DETAILS AT DOOR / WINDOWS OPENINGS IN WALL
DOWELLED CONTROL JOINTS
TYPICAL GROUND SLAB DETAIL JUNCTION OF 2 BLOCKWALLS
JUNCTION OF RC WALL TO BLOCKWALL
SECTION A
SECTION B
SECTION C
SECTION D
SECTION E
THÉP CỘT
LANH TÔ
CỐT THÉP GIẰNG
VẬT LIỆU TRÁM SEALANT TRÊN 2 MẶT THEO TIÊU CHÍ KỸ THUẬT
MẶT DƯỚI DẦM HOẶC SÀN
VẬT LIỆU TRÁM 10mm MẶT DƯỚI DẦM HOẶC SÀN
VẬT LIỆU TRÁM SEALANT TRÊN 2 ĐẦU THEO TIÊU CHÍ KỸ THUẬT
BLOCKWALL
CÁC THÉP CHỮ L MẠ KẼM BẮN ÁP LỰC VÀO CỘT GẠCH CÁCH KHOẢNG 1 CẤP
THÉP CỘT
THÉP TẤM MẠ KẼM 300x50x2.5 PHỦ LỚP CHỐNG DÍNH ĐƯỢC GẮN VÀO CÁC LỚP GẠCH CÁCH KHOẢNG BẰNG ÁP LỰC
VẬT LIỆU TRÁM SEALANT TRÊN 2 MẶT THEO TIÊU CHÍ KỸ THUẬT
SÀN BÊ TÔNG CỐT THÉP KẾT CẤU
SEALANT ON BOTH SIDES AS PER SPECIFICATIONS
THANH THÉP NỐI MẠ KẼM GẮN VÀO TƯỜNG BẰNG
ÁP LỰC CHO CÁC LỚP GẠCH CÁCH NHAU 1 LỚP
THANH NỐI MẠ KẼM 300x50x2.5 mm PHỦ LỚP CHỐNG DÍNH 1 ĐẦU CÁCH NHAU KHOẢNG 1 LỚP GẠCH
TÔ VỮA 2 MẶT MỐI NỐI (ĐIỂN HÌNH)
BỐ TRÍ THANH NEO CHO MỖI LỚP CÁCH NHAU 1 LỚP
VỮA LỎNG C15/10
LỚP CHỐNG THẤM BITUTHENE
CÁNH THÉP HÀN VÀO ỐNG THANH DOWEL 1R20
GẮN BẰNG PHƯƠNG
PHÁP BẮN ÁP LỰC
TRÁM BẰNG VỮA MÁC THẤP 10mm
THANH DOWEL 1R20 DÀI 350 PHỦ LỚP CHỐNG DÍNH TRONG CỘT
THÉP SÀN
VẬT LIỆU CHỊU NÉN FLEXCELL DÀY 10mm HOẶC CÁC VẬT LIỆU TƯƠNG ĐƯƠNG KHÁC PHỦ SEALANT KHI LỘ RA BÊN NGOÀI
NẮP Ø 25 VỚI VẬT LIỆU NÉN BÊN TRONG
GHI CHÚ: MỐI NỐI BỐ TRÍ XUYÊN VỮA TRÁC & KẾT THÚC KHI YÊU CẦU
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
TYPICAL DETAILS 2
HASV-BD-0003
NTS
Trang 6CHI TIẾT DẦM THANG MÁY CHO PHÒNG MÁY
NOTE: FOR LOCATION OF HOISTING BEAM REFER TO M&E DRAWINGS
254 x 254 x 89 KG/M UB MAX TONNAGE OF LIFT = 40kN
2 M20 BOLTS
MẶT CẮT 1-1
4 NOS HILTI HVA M16 BOLTS
ANGLE
80 X 80 X 10
NOTE: THE LIFTING CAPACITY OF HOOK = 60 KN (KHẢ NĂNG TREO 60kN)
1 - 1
150
6 FILLET WELD (HÀN GÓC)
254X152X59.6 Kg/m UB HOISTING BEAM (DẦM VỚI MÓC TREO)
FILLET WELD ALL AROUND 6mm M.S PLATE WITH 6mm
R25
250X180X12mm P
GREATER WHICHEVER IS SLAB REINFT.
T16-200 T16-200 OR
SLAB REINFT.
SIMILAR AS BOTTOM REINFORCEMENT
BEAM AND SLAB WITH RECESS (DẦM VÀ SÀN VỚI RÃNH) N.T.S
d = SLAB DEPTH (BỀ DÀY SÀN)
H = BEAM DEPTH (CHIỀU CAO DẦM) BOTTOM REINFORCEMENT
SIMILAR AS TOP REINFORCEMENT TOP REINFORCEMENT (Eg SCUPPER DRAIN ETC) (RÃNH NƯỚC)
RECESS
45°
MASS CONCRETE ONE LAYER OF WSFR A6
RC FLOOR SLAB (SÀN BÊ TÔNG CỐT THÉP)
OR APPORVED EQUIVALENT
BEAM
SLOPED, WHERE APPLICABLE DRAIN
Ø12 MS BOLTS
ALL STEEL MEMBERS TO BE HOT-DIPPED GALVANISED EXCEPT FOR
LOCATION & LENGTH OF CAT LADDER REFER TO M&E'S DWG.
UNLESS OTHERWISE STATED.
BUTT WELD
50 x 13 THICK Ø25 M.S BARx500
FLAT BAR WELDED TO
Ø12 MS BOLTS
200 R
150 R
MASS CONC INFILL
T10-150 (MIN.) BUT NOT LESS THAN SLAB REINFORCEMENT AS SHOWN ON PLAN
LOCATION & DIMENSION
WSFR A6
2d
115
d
2d
T10-300
ALL ROUND 1T16(TYP.) REFER TO ARCH'S DWG FOR
NOTE: DIMENSION TO CONFIRM WITH ARCH DWG
SLAB SUPPORTED BY UPTURNED BEAMS (DẦM LẬT ĐƯỢC ĐỠ SÀN)
NOTED OTHERWISE
5T10
T10-200
SAME SIZE & SPACING AS BOTTOM REINFORCING UNLESS
ASPHALT/FINISHES
35 90
JOINT IN SLAB (KHE THI CÔNG SÀN)
JOINT IN BEAM (KHE THI CÔNG DẦM)
LOCATION OF JOINT TO BE APPROVED BY THE ENGINEER (VỊ TRÍ DO KỸ SƯ QUYẾT ĐỊNH)
FOR MULTIPLE SPAN BEAM THE LOCATION AND TYPE OF CONSTRUCTION
KHE THI CÔNG CHO SÀN TREO
REFER ALSO TO GENERAL NOTES (XEM BẢN GHI CHÚ CHUNG).
2.
1.
NOTE (GHI CHÚ)
JOINT SHALL BE APPROVED BY THE ENGINEER
THROUGHLY SCABLED VERTICALLY
SPAN ONLY
JOINT IN MIDDLE THIRD OF
4T20 X 800 BW 600
CHI TIẾT MÓC TREO THANG MÁY CHO SÀN BTCT
R25 BAR HOT-DIP GALVANIZED
NOTE: THE LIFTING CAPACITY OF HOOK = 60 kN (KHẢ NĂNG TREO 60kN)
120
RC FLAT ROOF
(FOR EXTERNAL WORK)
SLAB
ADD 2T16 T&B
REINFORCEMENT
FACADE WHEREVER APPLICABLE
STARTER BARS WHEREVER APPLICABLE
ACCESS TO WATER TANK WHERE STAINLESS STEEL CAT LADDER SHALL BE PROVIDED.
STRUCTURAL FLOOR LEVEL
GRADE 30 MPa CONCRETE CAST WITH BARS `A' BOTHWAYS
TYPICAL DETAIL OF R.C PLINTH (CHI TIẾT BỆ TƯỜNG)
KHE THI CÔNG
STRUCTURAL FLOOR LEVEL
TYPICAL R.C PLINTH DETAILS (CHI TIẾT BỆ TƯỜNG)
CONSTRUCTION JOINT (KHE THI CÔNG)
Add'L SIDE BARS T10-200 IF VERTICALLY FOR H > 300 (TYP.)
REFER TO M&E DRAWINGS DIMENSIONS & LOCATION OF R.C PLINTH
ADD INTERMEDIATE RIBS BOTHWAYS
IF SPACING EXCEEDS 1200
STYROFORM IN-FILL T10-250 B/W
CHI TIẾT THANG LEO
1 VỊ TRÍ VÀ CHIỀU DÀI THANG LEO THAM KHẢO BẢN VẼ M&E TRỪ KHI CÓ CHỈ ĐỊNH KHÁC
2 TẤT CẢ KẾT CẤU THÉP PHẢI ĐƯỢC MẠ KẼM NGOẠI TRỪ CHO BÊ NƯỚC LÀ DÙNG THÉP KHÔNG GỈ
HÀN ĐỐI ĐẦU
(THÊM THÉP LIÊN KẾT
LÀM NHÁM BỀ MẶT THEO PHƯƠNG ĐỨNG
CHO DẦM NHIỀU NHỊP, VỊ TRÍ VÀ LOẠI KHE THI CÔNG DO KỸ SƯ QUYẾT ĐỊNH
CHI TIẾT DẦM TREO ĐỠ SÀN
CHI TIẾT LỖ CHO QUẠT DẸP
BÊ TÔNG KHỐI PHỦ LÊN
(THAM KHẢO BẢN VẼ KIẾN TRÚC
VỀ VỊ TRÍ VÀ KÍCH THƯỚC)
GIỐNG THÉP LỚP TRÊN
GIỐNG THÉP LỚP DƯỚI
GIỐNG KÍCH THƯỚC VÀ KHOẢNG CÁCH NHƯ KÍCH THƯỚC SÀN
GHI CHÚ: VỊ TRÍ DẦM XEM BẢNG VẼ M&E
TẢI TRỌNG THANG LỚN NHẤT 40 kN
THÉP CHỜ
THÊM THÉP TẠI ĐẦU CÁC SÀN
CHI TIẾT MƯƠNG NƯỚC TẠI ĐẦU RAMP
CAO ĐỘ SÀN THÊM SƯỜN CỨNG 2 PHƯƠNG NẾU KHOẢNG CÁCH VƯỢT QUÁ 1200
THÊM THÉP GIÁ T10-200 NẾU CHIỀU CAO >=300
CHI TIẾT LIÊN KẾT MÓC TREO THANG MÁY VÀO DẦM
HÀN XUNG QUANH
SÀN MÁI BÊ TÔNG
CHI TIẾT MƯƠNG NƯỚC TẠI ĐẦU RAMP
CHI TIẾT GỜ LỀ CỦA SÀN
ĐAI DẦM TỪ CÁC CHI TIẾT
THÉP R25 MẠ KẼM
GHI CHÚ: KÍCH THƯỚC SO LẠI VỚI BẢN VẼ KIẾN TRÚC
CHIỀU DÀI ĐOẠN NỐI
GHI CHÚ:
NHÀ THẦU CHỈ SỬ DỤNG CHI TIẾT ĐIỂN HÌNH NÀY NẾU KHÔNG CÓ CÁC CHI TIẾT KHÁC GHI TRÊN CÁC BẢN VẼ TƯƠNG ỨNG
NOTE:
CONTRACTER ONLY USE THIS TYPICAL DETAIL IF THERE IS NO OTHER DETAILS SHOWN ON CORRESPONDING DRAWING
MỐI NỐI TẠI 1/3 NHỊP
CONSTRUCTION JOINT IN SUSPENDED FLOOR
TYPICAL HOISTING HOOK DETAILS FOR LIFT HOISTING BEAM
TYPICAL HOISTING HOOK @ LIFT MOTOR ROOM TYPICAL HOISTING BEAM DETAILS FOR LIFT MOTOR ROOM
TẤM THÉP 50x13
THÉP MỀM Ø25 DÀI 500 HÀN VÀO
CƯỜNG ĐỘ THẤP
BU LÔNG
BU LÔNG CƯỜNG ĐỘ THẤP
TYP DOWNHANG DETAIL FROM BEAM
TO SUPPORT SLAB
ADD REBARS AT EDGE
TYPICAL KERB DETAILS ON SLAB
COLUMN
PLAN (MẶT BẰNG) TYPICAL ADDITIONAL LINKS DETAILS FOR BEAM LARGER THAN COLUMN TYPICAL DETAIL OF SCUPPER DRAIN AT EDGE OF SLAB/RAMP
TYPICAL DETAIL OF MASS CONCRETE TOPPING
TYPICAL SQUAT PAN DETAILS TYPICAL CAT LADDER DETAILS
CAO TRÌNH KẾT CẤU SÀN
THÉP SÀN
CHO VẬT LIỆU TRÁM STYROFORM
THÉP LỚP DƯỚI
CONSTRUCTION JOINT
SEC 1-1
MẶT DỰNG KHI CÓ YÊU CẦU THÉP SÀN
ÍT NHẤT LÀ T10-150 NHƯNG KHÔNG ÍT HƠN
MƯƠNG NƯỚC
4 BU LÔNG M16 HILTI HVA
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
TYPICAL DETAILS 3
HASV-BD-0004
NTS
Trang 72
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
1
2
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
PILE CAPS DETAILS TABULATION
PC1 PC2 PC3
PC8
1500 x 1500 x (500~1000) 06
19 09
01
1800 x 1800 x (500~1000)
2000 x 2000 x (500~1000)
PC2
PC2
PC1 PC1
PC1
PC1
PC8 PC6
PC6
PC2 PC2
PC2 PC3
PC3
PC2 PC3
PC2 PC3
PC2 PC3
PC3 PC2
PC1
PC1
PC2
PC7
PC2
PC5
PC2 PC2
PC2 PC3
PC3
PC2
PC2
PC2
PC3
PC4
PC4
PC4
PC4
PC4
PC4
PC4
PC4
PC4
PC4
PC9
(h = 500~1000)
PC10
PC10
(h = 500~1000)
2806
3317
106°
2615
1703
3060
2148 147°
PC9
1400 3600 1400
h = 500
h = 2000
01
700
700 1100
1200 800
800 1690
900 900
1100 700
1100 700
1100 700
1100 700
1100 700 1100
700
700
500
1100 700 2350
1980
1100
1100 700
1740
700 1100
950 550
1100
3910
1100
2500
565
700 1100
700 1100
1140 660
92°
92°
1095 705
1095 705
900 900
1100
1750
700 1100
1100
1750
1750
750 750
2290 275
60°
2535
3670
86°
6150
1805
86°
2360
2005
94°
700
900
1100 700
1100 700
16°
1100 700
LEAN CONCRETE 100mm THK
SECTION 1-1 (TYPICAL)
SCALE: 1/50
100 700 400 700 100
1 1
-2.050
1200
800 1200
800 1200
2000
180
1200 800
1200 800
5250
1330
5105
83°
800 1200 800
1200
5055
800 1200
800 1200
3400
1250
1250
1050
1450
1450
1050
1050
1450
1450
1050
1050
1450
1250
1250
1450 1050
1050
1450
1050
1450
1250
1250
6840
2500
1050
1450
1250
1250
1460
1040
1240
1260
1450
1050
1450
1050
1250
1250
3940
1500
1500
1700
1300
1700
1300
1700
1300
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
FOUNDATION LAYOUT
SCALE: 1/100
FOUNDATION LAYOUT
HASV-BD-0100
1/100
NOTES:
1 THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL & M&E DRAWINGS
2 ALL LEVELS SHOWN IN DRAWINGS ARE STRUCTURAL SLAB LEVEL (SSL) AND IN METRES, UNLESS OTHERWISE SPECIFIED
3 ALL DIMENSIONS ARE IN MILIMETERS (MM), UNLESS OTHERWISE SPECIFIED
4 TOC: TOP OF CONCRETE LEVEL (M)
Trang 82
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
THB5-1(500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TVB4-3(500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (400x700)
TB (400x700)
TB (400x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
THB5-2(500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (400x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TVB4-2(500x700)
1
2
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TOC -0.050
TOC -0.050
TOC -0.050
TOC -0.050
TOC -0.050
TOC -0.050 TOC -0.050
TOC -0.050
TOC -0.050
TOC -1.550
TB(500x700)
TB(500x700)
TB (500x700)
TB (500x700)
TB(500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
TB (500x700)
SLAB 500mm SLAB 2000mm
TB (500x700)
TB (500x700)
TB (500x700)
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
TIE BEAM LAYOUT
SCALE: 1/100
TIE BEAM LAYOUT
HASV-BD-0101
1/100
NOTES:
1 THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL & M&E DRAWINGS
2 ALL LEVELS SHOWN IN DRAWINGS ARE STRUCTURAL SLAB LEVEL (SSL) AND IN METRES, UNLESS OTHERWISE SPECIFIED
3 ALL DIMENSIONS ARE IN MILIMETERS (MM), UNLESS OTHERWISE SPECIFIED
4 TOC: TOP OF CONCRETE LEVEL (M)
Trang 9COLUMN LAYOUT FROM LEVEL 1 TO UNDERSIDE LEVEL 2 FLOOR
SCALE: 1/100
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25 C26
C27
C28
C29
C33
C34
C35
C36
C37
C38
C39
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C1, C10, C13, C15, C17, C19, C21,C22, C26, C28, C31, C33, C36, C46, C49
C11, C12, C16, C20, C23, C24, C25, C27, C32, C37, C45
COLUMN SCHEDULE
400x400 FROM LEVEL 1 TO UNDERSIDE LEVEL 2 FLOOR
400x400 FROM LEVEL 1 TO UNDERSIDE LEVEL 3 FLOOR
1
2
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
400
400
400
200
5000
400
400
400
400
200
400
400
58°
1800
400
1375
200
400
400
400
400
400
400
400
400
200
400
9140
200
400
400
200
400
6040
200
400
5195 4°
2450
400
400 400
400
400 4770
400 400
400
400
400
400
400
400 200 400
400
400
400
1000
1850
1200
1850
1200
1000
1000 1000 400
400 5855
400
400
4040
79°
400 400
400 200
400
400
400
400
200
400
175
400
400
7895
6°
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
1/100 HASV-BD-0200
COLUMN LAYOUT (SHEET 1)
NOTES:
1 THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL & M&E DRAWINGS
2 ALL LEVELS SHOWN IN DRAWINGS ARE STRUCTURAL SLAB LEVEL (SSL) AND IN METRES, UNLESS OTHERWISE SPECIFIED
3 ALL DIMENSIONS ARE IN MILIMETERS (MM), UNLESS OTHERWISE SPECIFIED
4 TOC: TOP OF CONCRETE LEVEL (M)
Trang 10COLUMN LAYOUT FROM LEVEL 1 TO UNDERSIDE LEVEL 2 FLOOR
SCALE: 1/100
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25 C26
C27
C28
C29
C33
C34
C35
C36
C37
C38
C39
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C1, C10, C13, C15, C17, C19, C21,C22, C26, C28, C31, C33, C36, C46, C49
C11, C12, C16, C20, C23, C24, C25, C27, C32, C37, C45
COLUMN SCHEDULE
400x400 FROM LEVEL 1 TO UNDERSIDE LEVEL 2 FLOOR
400x400 FROM LEVEL 1 TO UNDERSIDE LEVEL 3 FLOOR
1
2
4
3 D
7
6
E F
8
9
11
A
10
H
J
I
15
K
N
8700
4400
8700
8300
8190
9650
8500
14050
G
4000
12300
14
L
M
3700
12200
13
12
7333
4800
4600
B
C
6700
6740
13440
3900
9540 13440
8600
400
400
400
200
5000
400
400
400
400
200
400
400
58°
1800
400
1375
200
400
400
400
400
400
400
400
400
200
400
9140
200
400
400
200
400
6040
200
400
5195 4°
2450
400
400 400
400
400 4770
400 400
400
400
400
400
400
400 200 400
400
400
400
1000
1850
1200
1850
1200
1000
1000 1000 400
400 5855
400
400
4040
79°
400 400
400 200
400
400
400
400
200
400
175
400
400
7895
6°
REVISION No.
THIẾT KẾ CƠ SỞ/ BASIC DESIGN
DRAWING STATUS
STAFF VILLAGE
DATE
- LOCATION
SCALE DRAWING TITLE
PROJECT NAME
- DRAWN BY
DRAWING No.
- STRUCTURE
Duy Hai Commune, Duy Xuyen District,
Tư vấn Thiết kế Kết cấu và Cơ điện / C&S and M&E Consultant
- CHECKED BY
- DESIGNED BY
- PRESIDED
DIRECTOR
- INVESTOR
HOI AN SOUTH DEVELOPMENT
LIMITED
Duy Xuyen District, Quang Nam Province, Vietnam Tay Son Tay Hamlet, Duy Hai Commune
A1-00.01 Khu Phức Hợp M1,
74 Nguyễn Cơ Thạch, P An Lợi Đông, Quận 2, Tp Hồ Chí Minh Tel: (+84) 28 3620 3611 Fax: (+84) 28 3620 3612 Email: consulting.engineer@nkc.com.vn Website: w w w n k c c o m v n
revision details
REVISION
KÝ HIỆU
initials
HIỆU CHỈNH
NỘI DUNG HC
suffix
STT
revision
NGÀY HC
date of revision
05/10/2017
00 Quang Nam Province
KEYPLAN
LOADING BAY
2899.9872 2899.9872
2899.9872
BLOCK A1
BLOCK A2
BLOCK B1
BLOCK B2
BLOCK C1
BLOCK C2 ADMIN BUILDING
ITEM
ADMIN BUILDING
1/100 HASV-BD-0201
COLUMN LAYOUT (SHEET 2)
NOTES:
1 THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL & M&E DRAWINGS
2 ALL LEVELS SHOWN IN DRAWINGS ARE STRUCTURAL SLAB LEVEL (SSL) AND IN METRES, UNLESS OTHERWISE SPECIFIED
3 ALL DIMENSIONS ARE IN MILIMETERS (MM), UNLESS OTHERWISE SPECIFIED
4 TOC: TOP OF CONCRETE LEVEL (M)