Scheduled receipts Projected on hand B2 LT = 2 wks... There will be an additional 20 units of B and 30 units of J... Product Structure Treec.
Trang 14 a.
Master
Schedule
E LT = 2 wks Beg.
Scheduled receipts
Projected on hand
B(2) LT = 2 wks Beg.Inv. 1 2 3 4 5 6
Scheduled receipts
J(4) & J(3) LT = 1 wk Beg.
Trang 24 b.
Master
Schedule
E LT = 2 wks Beg.Inv. 1 2 3 4 5 6
Scheduled receipts
Projected on hand
B(2) LT = 2 wks Beg.Inv. 1 2 3 4 5 6
Scheduled receipts
J(4) & J(3) LT = 1 wk Beg.
There will be an additional 20 units of B and 30 units of J
Trang 35 a Product Structure Tree
c
Master
Schedule
d
Scheduled receipts
Projected on hand
Scheduled receipts
P
L
Trang 4H(4) LT = 1 wk Beg.
Scheduled receipts