Trang 1Chapter 0 Introduction
Trang 2©2013 của Đỗ Thị Xuân Lan , GVC Ths.
Source : O Mon Thermal Power Plant Project
Trang 3Chapter 0 Introduction
0.1 The construction industry
0.2 The construction process
0.3 Codes and regulations
0.4 Construction cost
0.5 Construction management
Trang 41 THE CONSTRUCTION INDUSTRY
Trang 5Increased rate of GDP from 1995-2011
Trang 6©2013 của Đỗ Thị Xuân Lan , GVC Ths.
Gross value of
construction/GDP 1995-2011
Trang 7Increased rate of Gross value of construction1995-2011
Trang 8©2013 của Đỗ Thị Xuân Lan , GVC Ths.
• Construction is a important industry The price of every factory, office building, hotel or power plant must be charged for the goods or services
produce in it or by it (from “More Construction for the Money”, Summary Report of the
Construction Industry Cost Effective Project,
January, 1983, cited in “Project Management for Construction” by Hendrickson C., 2008)
THE CONSTRUCTION
INDUSTRY
Trang 9THE CONSTRUCTION
INDUSTRY
• The construction industry is one of the largest industries
• Construction is an exciting, dynamic
process which often provides high
income for workers and contractors
• The technical aspect of construction is extremely important, it is also essential that construction professionals have
knowledge of the business and
management
Trang 10©2013 của Đỗ Thị Xuân Lan , GVC Ths.
Construction Contractors
• Construction contractor: a person or a
company who has agreed to perform a defined scope of work in accordance with the contract documents and terms of the contract
Trang 11General Contractor and
Specialty Contractor
range of construction activities and
execute most major construction
projects
to one or more construction specialties, such as foundation work, electrical work, plumbing, heating and ventilating,
Trang 12©2013 của Đỗ Thị Xuân Lan , GVC Ths. 12
Trang 14©2013 của Đỗ Thị Xuân Lan , GVC Ths.
Subcontractors &
Prime contractors
• Prime contractor: contracts directly with the owner for the entire job
• Subcontractor: contracts with the prime
contractor for part of the work
Trang 16©2013 của Đỗ Thị Xuân Lan , GVC Ths.
1.
a Chủ đầu tư (EVN, CTTP)
Owner Electricity of Vietnam, Can Tho
MHI Thiết kế, TOA Thi công
O Mon Thermal Power Plant Project
Dự án Nhà máy Nhiệt Điện Ô Môn 1
Trang 17Construction Industry
Divisions
The major divisions of the construction industry consist of:
• building construction ("vertical construction")
− residential and nonresidential
• heavy construction ("horizontal construction").
− highways, bridges, airports, railroad,
canals, harbours, dams, and other major
public works.
• industrial construction
Trang 18©2013 của Đỗ Thị Xuân Lan , GVC Ths. 18
Trang 19Source: http://dddn.com.vn/2011112109486358cat111/thong-xe-duong-ham-dim-dai-nhat-dong-nam-a.htm
Trang 202 THE CONSTRUCTION PROCESS
Chapter 0 Introduction
Trang 21Phases of construction project
Design – Procurement - Construction
Trang 22©2013 của Đỗ Thị Xuân Lan , GVC Ths.
or Owner management of construction
2 Construction by a general contractor
3 Construction using a design/build(turnkey)
contract
4 Construction utilizing a construction
management contract
Trang 232.1 Construction employing owner construction forces.
Many large industrial
organizations and
governmental agencies:
possess their own construction
forces.
• these forces are utilized
primarily for performing repair,
maintenance, and alteration
work,
• they are often capable of
undertaking new construction
Owner
Construction staff
Project manager
Construction forces
Trang 24©2013 của Đỗ Thị Xuân Lan , GVC Ths.
2.2 Owner management of construction
• Owners utilize their construction
staffs to manage their new
construction
• The work may be carried out by:
– workers hired directly by the
Trang 26©2013 của Đỗ Thị Xuân Lan , GVC Ths.
2.3 Construction using a design/build (turnkey) contract
• an owner contracts with a
firm to both design and
build a facility meeting
certain specified
• frequently utilized by
construction firms that
specialize in a particular
type of construction and
possess standard designs
which they modify to suit
the owner's needs
Owner
Subcontractors
Construction work force Design/build
Trang 27– coordination problems are minimized – construction can begin before
completion of final design
• the difficulty of obtaining competition between suppliers and
• the complexity of evaluating their
proposal
2.3 Construction using a
design/build (turnkey) contract
Trang 28©2013 của Đỗ Thị Xuân Lan , GVC Ths.
2.4 Construction utilizing a construction management contract
• A professional
construction manager
(CM) acts as the
owner's agent to direct
both the design and
construction of a facility
• Three separate
contracts are awarded
by the owner for design,
Construction manager
Trang 30©2013 của Đỗ Thị Xuân Lan , GVC Ths. 30
Trang 32©2013 của Đỗ Thị Xuân Lan , GVC Ths.
1.
a Chủ đầu tư (EVN, CTTP)
Owner Electricity of Vietnam, Can Tho
O Mon Thermal Power Plant Project
Dự án Nhà máy Nhiệt Điện Ô Môn 1
Trang 34©2013 của Đỗ Thị Xuân Lan , GVC Ths.
3 CODES AND REGULATIONS
• Projects constructed must comply with a number of governmental regulations
– These include building codes, zoning regulations, environmental
regulations, safety regulations and contractor licensing laws, among others.
TCVN 4447-2012 Earthworks – Codes for Construction, Check and Acceptance
ASTM D 698 Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effect
BS 6031 Code of Practice for Earthworks
AS 1379-2007 Specification and supply of concrete
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-05) AND COMMENTARY (ACI 318R-05)
TCVN 4453-1995 Concrete works – Codes for Construction, Check and Acceptance
Trang 354 Reducing Construction cost
• Some of the best opportunities for construction cost savings
occur in the design process even before construction begins
Some design factors for reducing costs include the use of
modular dimensions, grouping plumbing and other equipment
to minimize piping and conduit runs, incorporating
prefabricated components and assemblies, utilizing economical materials, and employing new technology
• Injecting constructability considerations into the design process
Trang 36©2013 của Đỗ Thị Xuân Lan , GVC Ths.
Reducing Construction Costs
Some ways in which productivity can be
increased and costs minimized during
construction:
– Good work planning
– Carefully selecting and training workers and managers.– Efficiently scheduling labor, materials, and equipment.– Properly organizing work
– Using laborsaving techniques, such as prefabrication and preassembly
– Minimizing rework through timely quality control
– Preventing accidents through good safety procedures
Trang 375 CONSTRUCTION
MANAGEMENT
• Elements of Construction Management
• Quality Management
• Safety and Health
• Organization for Construction
• Reasons for Construction Company Failure
Trang 38©2013 của Đỗ Thị Xuân Lan , GVC Ths.
CONSTRUCTION MANAGEMENT
• Elements of Construction Management
– Construction management: the act of managing the
construction process
– The construction manager: manages the basic resources
of construction (include workers, subcontractors,
equipment, material, money and time)
– The resource include workers and subcontractors,
equipment and construction plant, material, money
(income, expenditure, and cash flow) and time
Trang 39CONSTRUCTION
MANAGEMENT
• Elements of Construction
Management
- Skillful construction management
results in project completion on time and within budget
- Scope of construction management: construction contracts, construction
methods and materials, production
and cost estimating, progress and cost control, quality control and safety
Trang 40©2013 của Đỗ Thị Xuân Lan , GVC Ths.
CONSTRUCTION
MANAGEMENT
• Elements of Construction Management
– Poor construction management:
• Project delays increase labor/equipment cost, cost of borrowed funds
• High material costs
• Increased subcontractor cost and poor relations
• High insurance cost
• Low profit or a loss on construction volume
Trang 41Elements of Construction
Management
• Skillful construction management results
in project completion on time and within
budget
• Scope of construction management:
construction contracts, construction
methods and materials, production and
cost estimating, progress and cost control, quality control and safety
Trang 42©2013 của Đỗ Thị Xuân Lan , GVC Ths.
CONSTRUCTION MANAGEMENT
• Quality Management
– All construction project steps must be taken to ensure thatthe constructed project meets the requirement established
by the designer in the project drawings and specifications
– More recently, the term quality management (QM) andQuality Assurance (QA) have been adopted to include allaspects of producing and accepting a construction projectwhich meets all required quality standards
– Quality management includes such activities as specificationdevelopment, process control, product acceptance,laboratory and technician certification, training andcommunication
Trang 43• Quality control (QC) which is a part of the quality management process, is
primarily concerned with the process control function
quality control so that quality control is most effective.
Trang 44©2013 của Đỗ Thị Xuân Lan , GVC Ths.
• In recent years, there has been increasing use of statistics-based methods for quality assurance when the results of all
construction process are products which vary over some
Trang 45CONSTRUCTION MANAGEMENT
• Safety and Health
- Construction is inherently a dangerous process
- The following construction operations have been found to
account for the majority of serious construction injuries:
• Concrete construction, especially construction of formwork,
placing concrete into formwork, and failure of formwork during
construction.
• The erection of prefabricated trusses, precast concrete
elements, and structural steel.
• The construction and operation of temporary facilities including scaffolding, construction plants, lifts and storage facilities.
Trang 46©2013 của Đỗ Thị Xuân Lan , GVC Ths.
CONSTRUCTION MANAGEMENT
FIGURE 1-10 Representative construction company organization chart.
• Organization for Construction
(There are probably as many different forms)
Trang 47– Poor cost estimating
– Inadequate cost accounting
– Lack of general management
Trang 48©2013 của Đỗ Thị Xuân Lan , GVC Ths. 48
The tower crane collapsed at the office
building construction site 72-74 NTMK
St on 27 Dec 2007, 3
Trang 49Source: OSHA
Trang 50©2013 của Đỗ Thị Xuân Lan , GVC Ths. 50
Trang 52©2013 của Đỗ Thị Xuân Lan , GVC Ths. 52