HRRER2 Method statement for Service Road

28 4 0
Tài liệu được quét OCR, nội dung có thể không chính xác

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 28
Dung lượng 1,05 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Sumitomo Mitsui Construction Co.,LTD Ha Noi City Ring Road No.3 Construction Project Method statement for Service road Package 2: Trung Hoa — Thanh Xuan section 1.. Ha Noi City Ring Road

Trang 3

HANOI CITY RING ROAD NO.3 CONSTRUCTION PROJECT PACKAGE 2: TRUNG HOA — THANH XUAN SECTION (KM23+195 — KM 5+265)

107 Nguy Nhu Kon Tum — Nhan Chinh Ward — Thanh Xuan District — Hanoi

đa SUMITOMO MITSUI CONSTRUCTION CO., LTD

Oriental Consultants Co.,Ltd (OC) and Katahira & Engineers

in association with TEDI, APECO, ITST and VECC

Cc: Mr Vu Xuan Hoa — General Director

Mr Pham Thanh Binh, Deputy General Director

ME QSET

AI Method statement for Service Road Cc

Note:

- Refer to Technical Specification $1.14

The Engineer’s Representative

OC, KEI; TEDI, APECO,

ITST, VECC

Trang 4

The Engineer's Representative Authorized Representative

Al Approval

Trang 5

Site Organization Chart

Equipment and machine

7.1 Working flow chart

7.2 Detail method statement

7.2.1, Preparation work 7.2.2 Unsuitable excavation 7.2.3, Embankment with borrow material, 50cm;

9.4 Emergency Call out Procedure HRR- PACKAGE 2

9.4.1 Initiation 13 -07- 201

9.4.2 Second Stage

9.4.3 Third Stage | RE EKEAG =

Emergency response chart

Appendix—1 Hazard analysis

Appendix—4 Plan view & Typical of cross section 12

Trang 6

Sumitomo Mitsui Construction Co.,LTD

Ha Noi City Ring Road No.3 Construction Project

Method statement for Service road Package 2: Trung Hoa — Thanh Xuan section

1 General

This method statement describes the work procedure for construction of Service road along the construction site of Ha Noi city Ring Road No.3 - Package 2 This work shail

be carried out in accordance with Technical Specification, Clause $1.14

This construction method will clarify and ascertain of above work

2 Quantity

Estimated quantity is only for reference as following The final quantity will be calculated at site

by daily contemporary record

3 Construction schedule (Please refer to appendix — 2)

4 Site Organization Chart

Senior Project Manager

——————————

Tran Van Huyen

Trang 7

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

1 Dump truck ~ | Nos | Requirement | Transporting material

6 Description of material (Black sand & Base)

- Black sand material will be transported to the site during the time of excavation work

- Base material will be transported, stored at site and sprayed water to get good moisture

content before construction ,

7, Construction Procedure

7.1 Working flow chart

Preparation work - Confirmation of plan view & typical cross section

- Establish stake at site

- Mobilization of Equipment & manpower

¥

Excavation work - Checking of working area by tape & visual

- Disposal unsuitable soil

Trang 8

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2:.Trung Hoa — Thanh Xuan section Method statement for Service road

7.2, Detail method statement

7.2.1 Preparation work

Clear up area for excavation and remove excess or any materials placed temporarily in

the working area

Manpower, materials and equipments should be mobilized as following the schedule

Proper lighting (during time of working at night shift) and safety facilities should be

furnished in the working area

Survey line marking and layout for construction road shall be established

This work shall be constructed from 2 lines: Line 1: Le Van Luong — Nguyen Trai

Line 2: Le Van Luong — Big C (Please refer to Appendix 4: Plan view & Typical Cross section)

Proceeding the survey and setting out for the construction limit

Grass and unsuitable material will be cleared by using excavators and bulldozers, and

removed material will be disposed from out of construction area by using the Dump

trucks with cover

7.2.3 Embankment work (Black sand, 50cm)

This work shall be carried out the same time of Excavation work

Before construction, the mark sticks shall be staked for control the leveling elevation

The material will be delivered by dump trucks and checked by visual during

construction

After that, the material shall be leveled by using the bulldozers and workers

The compaction work will be done by using the vibration roller and watering (if

necessary) to get the good moisture content

Thickness of embankment is 50 cm as layer

7.2.4, Base course, 30cm

Before construction, the mark sticks shall be staked for control the leveling elevation

The material will be delivered -by dump trucks and checked by visual during

construction And the material shail be stored at site, sprayed water to get good

moisture content

After that, the material shall be leveled by using the bulldozers and workers

The compaction work will be done by using the vibration roller and watering (if

Trang 9

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa.— Thanh Xuan section Method statement for Service road

Close to the manhole of crossing pipe, manhole of earth ditches will be made to collect

the water from the earth ditches Therefore, those collected water pumped to the

crossing pipe’s manhole for permanent sewerage

7.2.6 Cleaning work

Arrangement sign man, safety cone at location of entrance for control public traffic

Dispose ail the debris and other materials

Cleaning the site after finishing work, specially cleaning the entrance

8 Environmental control!

The SMCC should have responsibility for surrounding environment during the

construction time with complying the Condition of Contract and Vietnam’s National Law

on Protection of Environment and other relevant legislation such as: Government

Decree No.175/CP, Government Decree on providing Guidance for the Implementation

of the Law on Environmental Protection, 1994

9 Safety control

Safety Control Plan shall be refferred to SMCC Safety method statement and shail be

part of this method statement (submitted particular)

Prior to starting of construction of Service road, the following paticular matters are to

be through to all members working in the construction site in order to complete the

work efficiently without any accident or casualty

9.1 Joint meeting

Prior to starting of construction of Service road, a joint meeting with relevant staffs has

to be held for the purpose of general explanation on whole contents of works as well as

mutual implementation of efficient work

9.2 Instruction

For new coming staffs during the work, the same instruction is to be made as it has

been explained and discussed in the above joint meeting

9.3 Prevention of accidents

To prevent injury for third party:

The safety board and safety cone will be installed the entrance of the working area and

signal man arrange during transportation of equipment and material to the site

To prevented accident during working time

Check worker's PPE before start work

Check license of operator and equipment

Install safety facilities at working area

9.4, Emergency Call out Procedure

9.4.1 Initiation

Site with staff working on night works, shall initiate the Emergency Call out Procedure

(As refer to in the Emergency response chart)

Trang 10

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa ~ Thanh Xuan section Method statement for Service road

The Site Engineer and Safety Officer (2nd Stage) will be called, and if they cannot be

contacted, their level will be skipped and the 3rd Stage will be alerted In addition, the

initiator will take prompt action to mitigate the situation When he is released he will

report on:

The situation in general in compliance with the trigger definition

The number of people killed / injured / involved

Action taken by responsible site supervisory personnel

Other vital information in brief

The Site Engineer will also report the matter to the Site Manager/Construction

Manager and contact the duty telephone on the situation

9.4.2 Second Stage

Safety Officer, upon receiving information will check the completeness and assess the

situation If necessary, he will travel to the Site to check himself Upon verification of

all information involved, he will initiate the Third Stage (3rd Stage) with given

telephone number(s)

9.4.3 Third Stage

The persons at the 3rd Stage (Project PQEHS Manager) shall assess the situation i.e

severity of accident/incident and decide whether they will proceed with Emergency Call

Out or not If the situation required, he will call

Trang 11

Ha Noi City Ring Road No.3 Construction Project

Package 2: Trung Hoa —- Thanh Xuan section

EMERGENCY RESPONSE CHART

Add: 9 Tran Binh St, Cau

Giay District, Hanoi

Tell: (043) 768.3113

Viet Duc Hospital:

Add: 40Trang Thi St, Hoan

Kiem District, Hanoi

Trang 12

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

APPENDIX

Trang 13

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

Appendix 1:

Hazard Analysis

Trang 15

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

Trang 16

work (arrange safety foiites, ) excavation

wth black sand, 50cm course, 20cm Finishing work, remove safety facies and clean the site {inctuding 01 turing areal

1 work (arrange safety facies )

3 excavation

3 ‘with black sand, 80em

4) [Base course, 30em

3) work, remove safety faclities and clean the site (ncluding 04 turing area)

1) work (amrange safety facies )

2 ‘excavation 3Ị with black sand, 20cm

4} [Bane course, 30em

51 ‘work, remove salety faglfies and clean the si IP101-Pˆ2051ineruding 0% turảng area}

H work (arrange safety facies.) 2) excavation

3) ‘with black sand, Sem 4} [Base course, 30cm

9 ‘work, remove salaty faciities and elean tha sits P108-PtUs (including 01 turing area)

9 Wark (arrange safety faites.)

3 wih black sand, Soom

@) [Base course, Soom

3 ‘work, remove salety facing and clean te sta 116-422 (including 01 turing area)

1 work (arrange safety fuclties,.)

No Name Unit Quantity Description Remark

3 Bulldozer Nos 2 Levelling material H R R ~ P A Cc K A G E 2

= > -07- 2011

5 Water truck Nos 4 Watering

7 | Survey equipment Set 1 Survey work

//2011/8:38 PK

Trang 17

KS

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

Trang 18

BAN QUAN LY DU AN THANG LONG - PROJECT MANAGEMENT UNIT THANG LONG

Project (tên dy an’ Hanoi 3rd Ring road construction Project (DA Package (tên gói thầu): Package 2 ~ Trung Hoa - Thanh Xuan

XD đường vành đai 3 Hà Nội) section (Gói thầu 2 ~ Đoạn Trung Hoa -

Thanh Xuan)

CONTEMPORARY RECORDS

(Biên bản ghi chép hiện trường)

Date (d/n/y - ngày, tháng năm):

Work Item (Hang muc):

Name of the Part (Tên bệ phận):

Base on (căn cứ vào):

WarR H96 (Công việc được thực hiện)

1.No Deseription Quantity Demension/Speccification Time (Thời gian)

Trang 19

BẠN QUẦN LÝ DU AN THANG LONG - PROJECT MANAGEMENT UNIT THANG LONG

Project (tên dự án) Hanoi 3rd Ring road Package (tên gói thầu): Package 2 — Trung Hoa -

construction Project Thanh Xuan section (Gói thầu (ĐA XD đường vành 2¬ Đoạn Trung Hoa - Thanh

Consultants (TV): OC, TEDI, APECO, RITST Contractor (NT): SMCC

Actual working time

Trang 20

BAN QUAN LY DU AN THANG LONG - PROJECT MANAGEMENT UNIT THANG LONG

Project (tén dy an’Hanoi 3rd Ring road construction Project (DA Package (tên gói thầu):

XD đường vành đai 3 Hà Nội) Package 2 ~ Trung Hoa - Thanh Xuan

section (Gói thầu 2 - Đoạn Trung Hoa - Thanh Xuan))

(Biên bản ghi chép hiện trường)

Date (d/n⁄+y - ngày tháng năm):

Work Item (Hang muc):

Name of the Part (Tén bé phan):

Base on (cần cứ vào):

Equipment (Thiét bị)

TT (Loại thiết bị) (Thiết bị đikèm) — CAPAG (Shin (Hời Used (C.suét) liu) Htvh = gian) (chạy) (chờ) Idle

Material (Vật liệu) Quantity Unit Description Source Remark

(Khối lượng) (đơn vị) (Mô tả) (nguồn) (ghỉ chú)

Site Manager Site engineer Site manager Site Engineer

Trang 21

Ha Noi City Ring Road No.3 Construction Project Sumitomo Mitsui Construction Co.,LTD

Package 2: Trung Hoa — Thanh Xuan section Method statement for Service road

Trang 22

BIG ¢ SUPER MARKET (SIEU THIBIGC)

National conference center

“Trung tâm hội nghị quốc gia

Trang 24

CROSSING PILE NO.4

‘The culture center of Thanh Xuan District

‘Trung tm van ho& quan Thanh Xuan

H=1.73M (EXGAVATI Œ ION) department

Ban cdyếu chính phô

Licogi No.13 Công ty cơ khí và sấy lấp

EXISTING MANHOLE H=1.82M (EXCAVATION) ww?

Trang 25

CONSTRUCTION VAN LUONG - BIG! LINE 2

CROSSING PILE No.G

CENTER LINE OF RAILWAY

Trang 26

AFC

tR- PACKAGE 2

mr

Trang 27

STAZ5+062.10 2.34M (EXCAVATION)

EXISTING MANHOLE H=4.71M (EXCAVATION)

Trang 28

: ¬ ưv.ư®ờớẻớ asm | aos | oma am TYPICAL CROSS SECTION (TYPE 3)

= {including 01 turing area) " BARS