1. Trang chủ
  2. » Khoa Học Tự Nhiên

Practical examples of international CDM projects lessons for vietnam

25 374 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 25
Dung lượng 2,84 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

• Current Vietnam Project • Current Vietnam PDDs • Status of Vietnam CDM development • Key issues in Vietnam CDM development... Current Vietnam CDM:Rang Dong Oil Field • Project 0152 : R

Trang 1

UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the

Austrian Industry

Training Sessions on the Kyoto CDM

Practical examples of International CDM

Projects & Lessons for Vietnam

Mike Bess

Trang 2

Current Vietnam Project

Current Vietnam PDDs

Status of Vietnam CDM development

Key issues in Vietnam CDM development

Trang 3

Current Vietnam CDM:

Rang Dong Oil Field

Project 0152 : Rang Dong Oil Field

Associated Gas Recovery and Utilization Project

Rang Dong Oil Field (off SE coast Vietnam)

Vung Tau City (Raria-Vung Tau Province)

Trang 4

Current Vietnam CDM:

Rang Dong Oil Field - Location

Trang 5

Current Vietnam CDM:

Rang Dong Oil Field - Description

Associated gas from oil production

captured on oil platforms

Compressed at sea, then, piped to Vung

Tau City where processed to:

‘Dry gas’ (CH4-methane) for electricity

generation (substitutes for oil & gas)

LPG (propane & butane) for domestic cooking

use

Some dry gas for fertilizer, some condensate

for other industry

Emission reductions occur on electricity

production

Trang 6

Current Vietnam CDM:

Rang Dong Oil Field- Schematic

Trang 7

Current Vietnam CDM:

Rang Dong Oil Field- Schematic

Trang 8

Current Vietnam CDM:

Rang Dong Oil Field – CO2e Reductions

Trang 9

Current Vietnam CDM:

Rang Dong Oil Field – CO2e Reductions

• AM009 Methodology chosen: ‘Recovery and

utilization of gas from oil wells that would

otherwise be flared, V2’

• AM009 was developed specifically for the

Rang Dong Oil Field CDM Project

• Rang Dong CDM registered with CDM EB on

4 February 2006

• See UNFCCC web site: http://cdm.unfccc.int /Projects/DB/DNV-CUK1133472308.56/view.ht ml

Trang 10

Current Vietnam CDM:

Rang Dong Oil Field – CO2e Reductions

• Methodology only counts reduction in CO2

relative to avoided gas flaring – very

conservative, but easy to prove

• Does not calculate efficiency gains (emission

reductions) for natural gas for oil in

electricity generation – again, easier to make case

• Does not calculate substitution of LPG for

current LPG (imports)

Trang 11

– Project is alternative, i.e gas recovery

instead of flaring (reduction in CO2)

– Key lesson from Rang Dong PDD baseline

is:

KEEP IT AS SIMPLE AS POSSIBLE!!!

Trang 12

Current Vietnam CDM:

Rang Dong Oil Field – Assumptions

PDD makes assumptions

very clear:

Trang 13

Current Vietnam CDM:

Rang Dong Oil Field – Compare options

PDD makes assumptions

very clear:

Trang 14

Current Vietnam CDM:

Song Muc Hydropower Description

• Project is a retrofit of earlier (1980)

hydropower station that operated for very

short time

• Project aims to install new state-of-art

turbines, penstock, governors, etc.

• Will have capacity of 2MW, power generation

of 7 200 MWh pa

• Cost US$2 mi

Trang 15

Current Vietnam CDM:

Song Muc Hydropower PDD

• AMS-I.9 Small scale methodology fro

grid-connected renewable electricity

generation sought

• http://cdm.unfccc.int

/Projects/request_reg.html (registration request on UNFCCC site)

Trang 16

Current Vietnam CDM:

Tra Linh 3 Hydropower PDD - Description

• PIN & first version PDD prepared

• 3 units small hydro 2.4MW (x3 = 7.4MW)

• Qualifies as ‘small scale’ under Marrakech Accords to KP

• PDD states avoided 170 000 tCO2e on national grid for ten

years, but, needs to set out reductions during CP

• Participants are:

Trang 17

Current Vietnam CDM:

Tra Linh 3 Hydro PDD - Location

Location of the project

Quang Nam

Trang 18

Current Vietnam CDM:

Tra Linh 3 Hydro PDD – Project Boundary

Trang 19

Current Vietnam CDM:

Tra Linh 3 Hydro PDD - Design

7.2 MW Fore bay

Trang 20

Current Vietnam CDM:

Tra Linh 3 Hydro PDD - CERs

emission reductions, tCO 2 eq

July 2008 – June 2009 16,984.6 July 2009 – June 2010 16,984.6 July 2010 – June 2011 16,984.6 July 2011 – June 2012 16,984.6 July 2012 – June 2013 16,984.6 July 2013 – June 2014 16,984.6 July 2014 – June 2015 16,984.6 July 2015 – June 2016 16,984.6 July 2016 – June 2017

Trang 21

Current Vietnam CDM:

Tra Linh 3 Hydro PDD - Additionality

• Clearly sets out barriers:

– Investment – Vietnam investors can make more money in other sectors

– Policy – lack of renewable energy policy;– EVN has monopoly – so, PPA (including economic price) difficult to negotiate

– Competition for funds with state-owned companies,

Trang 22

Current Vietnam CDM:

Tra Linh 3 Hydro PDD – Case for CDM

• Increases IRR of project

• Increases access to international funding

• Reduces risks of project

• Incentivises investors to come into sector

• Results in local development

• Results in reduced GHG emissions

Trang 23

Current Vietnam CDM:

Sector/project ideas

• Pulp & paper boiler replacement

• Energy efficiency in steel

• Waste heat recovery from cement

• Improve energy efficiency at rubber plant

• Biomass waste for cogeneration (CHP)

• Fuel switch natural gas for HFO

• Landfill

• Cogen & EE in beer factory

Trang 24

Current Vietnam CDM:

Sector/project ideas

Pulp & paper boiler replacement:

Energy efficiency in steel

Waste heat recovery from cement:

AM 0024

Methodology for greenhouse gas reductions through waste heat recover

y and utilization for power generation at cement plants

ACM 0003: Emissions reduction through partial substitution of fossil

fuels with alternative fuels in cement manufacture - Version 3

Improve energy efficiency at rubber plant

Trang 25

Thank you!

Mike Bess Director, International Division Energy for Sustainable Development Ltd.

+44 1225 816 808

mike@esd.co.uk www.esd.co.uk

Ngày đăng: 22/06/2016, 23:54