ons R20m5.00Tons Crawler crane50Tons Jetty 2a Crawler crane50Tons wharf 2aSuper structure line Drilling System Barge 1000tons Bentonite System Barge 600tons Drilling SystemBarge 1000ton
Trang 1Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
wharf 1
R20m5
ons
R20m5.00Tons
Crawler crane50Tons
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
Drilling System Barge 1000tons Bentonite System
Barge 600tons
Drilling SystemBarge 1000tons
Bentonite SystemBarge 600tons
Rebar workBarge
PLAN OF WHARF AND JETTY IN BORED PILE STAGE - OPTION3
ATTACHMENT NO.1
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
PLAN OF WHARF AND JETTY BORED PILE STAGE-OPTION3
Trang 2Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
wharf 1
R20m5.00Tons
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
ons
R20m19.5 T
ons
R20m19.5 Tons
Crane 80T
Crane 120T
R20m5
ons
Crawler crane50Tons
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
OPTION 3
Trang 3Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
R40m4.2 Tons
R40m4.2 Tons
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE - OPTION 3
ATTACHMENT NO.1
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
STAGE - OPTION 3
Trang 4THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 40 - OPTION 3
ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
AT PIER 40 STAGE - OPTION 3
Trang 5wharf 2aSuper structure line
38
Stationary Pump
Concrete truck
R20m5.0TonsR40m
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
AT PIER 41 STAGE - OPTION 3
Trang 6Hmin = -1.28
Htb = +1.16 Hmax = +1.68
96102920
500035000
-2.00-2.00
-3.00-3.00
-4.00-4.00
-5.00-5.00
-6.00-6.00
PLAN OF TEMPORARY SLOPE AT PIER 40
R25
1mx1mx2m
Gabion1mx1mx2m
Black sand K95Geotextile fabric
SECTION B - B
11
7000
11
60cm Stone 4x6cmGeotextile fabricBlack sand K95Geotextile fabric
CHECKED BY
APPROVED BY
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
RAMP WAY AT PIER 40 - OPTION 3
RAMP WAY AT PIER 40
NOTES:
All dimensions are m, levels are m Dimensions in typical section are mmm
Trang 7[200x76
Concrete C20 t=350mm
t=20mm
2 [200x76400
H800x300x14x26L=25.4m
Deck plate3000x1000x200
H350x350x12x19, L=12m
2[-200x75x5.2x9, L=10m
D32@0.8m, L=11.74m
2[-200x75x5.2x9L=24.2m
B
A
BA
Steel pile, L=48mH400x400Steel sheet pile, Larsen IV, L=20m
H350x350x12x19, L=12m
+2.20+2.20
H800x300x14x26L=25.4m
L=11.54m2[-200x75x5.2x9, L=9.0m
Detail ''C''
Detail ''G''C
C
-5.04-1.630
D32, L=10.5m
1000
Existing groundDetail ''D''
3540013000
structures of temporary JETTY 1A - option 3
- The material may be changed depend on actual condition
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Trang 8Steel sheet pile, Larsen IV, L=20m
PC bar D32
C-C section
+2.20
Sub-base t=200mm10800
[-300x90x9x13
[-200x76x5.2x9
D25 rebarL100x100x10@2mL50x50
[-200x76x5.2x9
300
H400x400x13x21H400x400x13x21
L100x100x10Bracing350
DETAIL ''E''
Deck plate3000x1000x20
Stiffener t=14mmSường tăng cườngH800x300x14x26Bolt M22
[-300x90x9x13
Plate 500x500x20
L100x100x10H400x400x13x21Stiffener plate, t=20mm
DETAIL ''D''
2[-200x76x5.2x9
PC bar D32@2mLarsen IV
Crossbeam, L=9.4m2[-300x90x9x13
H800x300x14x26, L=23.2m
[-300x90x9x13
L=2.9m
Deck plate3000x1000x200[-200x75x5.2x9
-1.23
ATTACHMENT NO.3
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GểI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
TYPICAL SECTION of temporary JETTY 1A - OPTION 3
TYPICAL SECTION OF TEMPORARY JETTY 1A - OPTION 3
Trang 9PC bar D32
a-a section
L100x100x10, L=3.8m
2[-200x75x5.2x9L=11.54m
H400x400L=9.5m
H800x300x14x26L=23.2m
Deck plate3000x1000x200
D32, L=10.5m[-200x75x5.2x9
H350x350x12x19
L=12m15600
D32@3m, L=1.57m
Detail ''A''Hmax = +1.68
3000x1000x20
[200x76
Concrete C20 t=350mm
20
PC bar D32 L=1.57mPlate 200x200
t=20mm
2 [200x76400
- All the dimension are mm, levels are m
NOTEs:
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
structures of temporary JETTY 2A -OPTION 3
STRUCTURE OF TEMPORARY JETTY 2A - OPTION 3
Trang 10Crossbeam, L=9.4m2[-300x90x9x13
H800x300x14x26, L=23.2m
[-300x90x9x13L=2.9m
Deck plate3000x1000x200[-200x75x5.2x9
-1.23
DETAIL ''D''
2[-200x76x5.2x9
PC bar D32@2mLarsen IV
DETAIL ''E''
Deck plate3000x1000x20
Stiffener t=14mmSường tăng cườngH800x300x14x26Bolt M22
[-300x90x9x13
Plate 500x500x20
L100x100x10H400x400x13x21Stiffener plate, t=20mm
DETAIL ''F''
Deck plate3000x1000x20
[-300x90x9x13
[-200x76x5.2x9
D25 rebarL100x100x10@2mL50x50
[-200x76x5.2x9
300
H400x400x13x21H400x400x13x21
L100x100x10Bracing350
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GểI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
TYPICAL SECTION of temporary JETTY 2A - OPTION 3
TYPICAL SECTION OF TEMPORARY JETTY 2A - OPTION 3
Trang 11Foundation of tower crane 4mx4mx1.5m
Super Structure line
Pier 40
Tower crane 168Tons.m
A A
Bring frame
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
GENERAL PLAN OF TOWER CRANE AT PIER 40 - OPTION3
GENERAL PLAN OF TOWER CRANE AT PIER 40 - OPTION 3
NOTE :
- Dimensions are mm, Levels are m
Trang 12C 100x50x5.9x8 L=2.660m
H 200x200x8x12 L=16.64m
H 200x200x8x12 L=1.6m
Hmax=+1.68
A-A SECTION (1:75)
H 200x200x8x12 L=30m
C 200x75x8.2x11.5 L=1.5m
H 200x200x8x12 L=1.6m
Detail "A"
Hmax=+1.68
V 100x100x10 L=1.2m
C 150x75x10x6.5 L=0.3m
H 200x200x8x12 L=1.6m
H 200x200x8x12 L=30m
C 150x75x10x6.5 L=1.29m
Expanded metalXG21, t=5mm
H 200x200x8x12 L=16.64m
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
Trang 13Pier 40
A-A SECTION (1:250)
Bring frame
Htb=+1.16Htb=+1.16
Tower crane 168Tons.m
Max moving Load 6Tons
SPSP CofferdamD=0.7m , L=35m
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
GENERAL VIEW OF TOWER CRANE AT PIER 40 - OPTION 3
GENERAL VIEW OF TOWER CRANE AT PIER 40 - OPTION3
NOTE :
- Dimensions are mm, Levels are m
Trang 14Super Structures Line
Tower crane 168Tons.m
D
67508250
Riverside
750 1500 7503000
CHECKED BY
APPROVED BY
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
NOTE :
- Dimensions are mm, Levels are m
GENERAL PLAN OF TOWER CRANE AT PIER 41 - OPTION 3
GENERAL PLAN OF TOWER CRANE AT PIER 41 - OPTION 3
Trang 15SPSP D=0.7m L=35m
+2.20
Tower crane 168Tons.m
Max moving Load 6Tons
H300x300
CHECKED BY
APPROVED BY
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
GENERAL VIEW OF TOWER CRANE AT PIER 41 - OPTION 3
NOTE :
- Dimensions are mm, Levels are m
GENERAL VIEW OF TOWER CRANE AT PIER 41 - OPTION 3
Trang 16+2.20400
4000
3646700
54
Column of tower crane
Cofferdam system at P41
Jetty 2c, B=1.5m4800
B
B
Foundation 4mx4mx1.5m
SPSP D=0.7m L=35mHmin=-1.28
C 150x75x6.5x10 L=1.292mCofferdam system at P41
PLAN OF JETTY 2c
Foundation 4mx4mx1.5m
B-B SECTION (1:25)
V 100x100x10 L=1.2m
C 150x75x10x6.5 L=0.3m Rebar D19
H 200x200x8x12 L=4.8m
V 70x70x6
Detail "B"
Expanded metal XG21 ,t=5mm
V 100x100x10 L=1.2m
C 150x75x10x6.5 L=0.3m
C 150x75x10x6.5 L=1.29m
Grille XG21 t=5mm
H 200x200x8x12 L=4.8m
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
STRUCTURE OF JETTY 2c
NOTE :
- Dimensions are mm, Levels are m
STRUCTURE OF JETTY 2c
Trang 17SPSP D=0.7m l=35m
Foundation of tower crane 4mx4mx1.5m
Jetty 2b L=12mColumn of tower
+2.20
PLAN OF JETTY 2b (1:150)
Foundation
4mx4mx1.5m
A
AHmin=-2.72
9000
27000
1000Gabions 1mx1mx2m
H200x200x8x12 L=30m
H200x200x8x12 L=1.6m
H200x200x8x12 L=27m
C 150x75x6.5x10 L=1.292m
Black sand K95
+0.92
Riverside
A-A SECTION (1:75)
H 200x200x8x12 L=30m
C 200x75x8.2x11.5 L=1.5m
H 200x200x8x12 L=1.6m
Expanded metal XG21 ,t=5mm
V 100x100x10 L=1.2m
C 150x75x10x6.5 L=0.3m Rebar D19
H 200x200x8x12 L=27m
V 70x70x6
150
H 200x200x8x12 L=1.6m
1300
V 100x100x10 L=2.3m
H 200x200x8x12 L=30m
CHECKED BY
APPROVED BY
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
Trang 18Barge 500 tons
Barge 500 tons
Stone truck
Stone 4cmx6cm
Barge 500 tons Moving Direction
- Excavator Soil by crawler Excavator in barge 500tons
- Moving barge to dig inner
- To dig soil foundation of gabion to designing level
- Transpost gabions by other 500tons barge
- Use crawler excavator to installing gabions
- Transpost stone 4x6cm in truck by other 500tons barge
- Use crawler excavator to spread in gabions scope
- Moving crawler excavation to gabions scope
- Soil Excavator inner scope
- Moving stone truck to next scope
- Use crawler excavator to spread stone next scope
- Spread geotextile fabric
- Transport black sand by truck in 500tons barge
- Use pump to pump black sand designing scope
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
CHECKED BY
APPROVED BY
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
CONSTRUCTION METHOD OF TEMPORARY RAMP WAY
CONSTRUCTION OF METHOD TEMPORARY RAMP WAY
NOTE:
- All dimension are mm , Levels are m
Trang 19Steel sheet pileLarsen IV, L=20m
Crawler crane
55 tons
STEEP 1: CONSTRUCTION OF WHARF
- Locating the center of wharf
- Driving steel sheet pile Larsen IV
- Filling and compaction black sand
- Filling sub base to disigning level
- Completing of wharf
STEEP 2: DRIVING STEEL PILE H400x400
- To moving of crane
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
STEEP 3: INSTALLING MAIN BEAM AND COVER PLATE
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing guided bar
- Installing corver plate 3000x1000x200
- To moving guided bar
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing corver plate 3000x1000x200
Steel pile
H 400x400
Cover plate 3000x1000x200
Cover plate 3000x1000x200
Steel sheet pile
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
CONSTRUCTION METHOD OF JETTY OF WHARF
CONSTRUCTION METHOD OF JETTY AND WHARF
Trang 20A A
-4.59Htb=+1.16 Hmax=+1.68
s =15.8m
PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 1
(1 : 300)
A - A SECTION (1 : 300)
Rate load =6.54 tons
STAGE1: SETTING BODY OF TOWER CRANE
- Setting a base support
- Setting first segment have length 7.5m
- Setting second segment have length 3m
engt
=40mWorking radius = 15.8m
m=3.55 tons
CHECKED BY APPROVED BY
THE ENGINEER THE CONTRACTOR
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1 Approved 1
Checked 1
SETTING TOWER CRANE AT PIER P40 - STAGE 1
SETTING TOWER CRANE AT PIER P40 - STAGE 1
NOTE :
- Dimensions are mm or m, Levels are m