Trang 1Yarn Dyeing Machines
PICTURE BASED PRESENTATION
Trang 2Prepared By : Mazadul Hasan sheshir ID: 2010000400008
13th Batch (Session : 2009 - 2013) Department : Wet Processing Technology Email: mazadulhasan@yahoo.com ( Facebook/Email) Blog : www.textilelab.blogspot.com
Southeast University
Department Of Textile Engineering
I/A 251,252 Tejgaon Dhaka Bangladesh Prepared By :
Trang 3Grey Store
Trang 4Soft Winding Section
Trang 5Soft Winding Section
Trang 6Soft Winding Section
Trang 7Different Types Of Package
Trang 8Yarn Batch section
Soft Winded yarn are Prepare For dye in Batch Section
Trang 9Dyed Package
Un Dyed Package
Trang 10Yarn dyeing Plant
Trang 11Empty Case Case loaded with Package
Trang 13Density of the yarn package
Trang 15Main Pump Of yarn Dyeing Machine
Trang 16Dosing tank
Trang 19Parts name
Trang 21Dosing TankHigh Pressure Lid
Main PumpDrain line
Steam valveFlow Reverse
Dye Bath
Trang 22Main pump
Dye Bath
Heat Exchanger
Input Out
Trang 23Bottom Portion of a Yearn dyeing Machine
Trang 24Spindle Dyed package in Spindle
Trang 25Spindle
Trang 26Two types of liquor Flowing mechanism
Trang 27Height of the liquor during dyeing
Trang 28Types of loading
Trang 29Labe Dyeing Machine
Trang 31Sample dyeing machine
Trang 33VERTICAL DYEING SYSTEM
Trang 34Yarn dyeing Plant
Trang 35Bulk yarn Dyeing Machine
Trang 37Set up Of a dyeing Machine
Trang 40Horizontal dyeing machine
Trang 53Auto Dosing System
Trang 54Dose Dos Dose Chem
Silo Dos
Trang 56Hydro extractor
Trang 60Hydro extractor
Trang 62Loading Unloading Area
Trang 65RF Dryer
Trang 66Unloading
Trang 67Hard Winding Section
Trang 68Hank Dyeing Machine
Trang 69Automatic Yarn dyeing Plant
Trang 70• Fabric dyeing machine
• Check the main pump oil level
• Check all bearings, seals, and gaskets
• Check all mechanical seal flush pipes.
• Discharge the water from air filter
• Check all m/c flang & platform bolts
• Grease RCR rotary joints every 2 weekly
• Clean & check the control panel
• Check the adjustment of catch basket mechanism and plaiter system.
Dyeing machine maintenance
Trang 71Blower in operation
Heating and cooling batteries inactive
Trang 72Blower heating and cooling batteries
in operation
Trang 741 Yarn Manufacturing Technology