3.1 Gider Cycle Schedule1st day ▪ Casting concrete 2nd day ▪ Curing for concrete ▪ Removal stop end form ▪ Roughing of concrete surface 3rd day ▪ Stressing ▪ Launching of traveler ▪ Sett
Trang 1GIRDER CONSTRUCTION Chapter 3: GIRDER CONSTRUCTION
Site Condition P3 Side (Bai Chay Side)
Trang 2l = 9.0m, n=2
Shin - so φ3000
l = 10.5m, n=3 Shin - so φ3000
P1 P2
A2
435000 902500
6700
129500 86000
35000
750
750 86000 129500
GENERAL VIEW OF THE BAI CHAY BRIDGE
SPAN SIDE
PIER TABLE
PIER BASE
4039383736353433323130292827262524232221201918
23 25 27 29 31 32
CLOSURE POUR DISMANTLE OF TRAVELLER
1 3 5 7 9 10 12 14 16 18 20 22 24 26 28 30 32
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
1
ERECTION OF TRAVELLER
DISMANTLE OF TRAVELLER
SPANSIDECOLUMN TOP PIER TABLE
COLUMN TOP PIER TABLE
1 LIFT~24 LIFT
DISMANTLE OF J/F
ERECTION OF J/F TOWER
TET HOLIDAYS
2 5 7 8 10 12 15 17 19 21 23
1 2 3 5 7 9 10 12 14 16 18 20 22 24 26 27 29
31 CLOSURE POUR DISMANTLE OF TRAVELLER
ERECTION OF TRAVELLER 1
2 3 5 7 9 10 12 14 16 18 20 22
41
WALL SHIN-SO
WORKS ROAD
APR
JUNMAY
AUGSEP
NOVOCTJULMAR
DEC
FEBJAN
APR
JUNMAY
AUGSEP
NOVOCTJULMAR
DEC
WORKS ELECTRICAL ANCILLARY &
TOWER ERECTION OF J/F
DISMANTLE OF J/F
PIER TABLE
Nov.2005
◆Removal Form Traveler
◆Form Traveler Assembling
◆Cycle of Cantilever Work
Trang 3Pier Table Construction
Trang 4Form Traveler Assembling
◆Limited Area
◆Inside Tower Crane Radius
◆Limited Weight 135 ton Form Traveler
Trang 5Form Traveler Assembling
Trang 6Form Traveler Assembling
Trang 7Form Traveler Assembling Completion
Trang 8Main Girder Section
2%
8.00
2.50 40 .25
◆Steel Bracing Pipe
(interval 3.25m, Square Type thk=16mm and
Trang 9PC Bar & Strand Position
Longitudinal PC Bar Φ32 (40-30Nos/Seg) from 4Seg.30Nos
Longitudinal PC Strand 12S12.7 (Center span 18Seg 20Nos, Side span 24seg(P3),22Seg(P4) 10Nos )
Transverse PC Strand S21.8 (18-12Nos/Seg from 5Seg 12Nos)
Trang 10Detail of Steel Bracing Pipe (Square Type)
Dead Anchor
Trang 11Steel Bracing Pipes
Trang 123.1 Gider Cycle Schedule
1st day ▪ Casting concrete
2nd day ▪ Curing for concrete
▪ Removal stop end form
▪ Roughing of concrete surface
3rd day ▪ Stressing
▪ Launching of traveler
▪ Setting up form
(External and Bottom)
4th day ▪ Installation of bottom slab and web rebar
5th day ▪ Installation of bottom slab and web rebar
( Steel brace foundation part)
▪ Installation of steel pipe brace
▪ Inner form and upper slab form Setting
6th day ▪ Installation of form for upper steel brace part
▪ Installation of Form Tube
7th day ▪ Re-Bar for stay cable anchor position
▪ Installation of upper slab rebar
8th day ▪ Installation of upper slab and PC materials.
▪ Final Form and Form Tube adjustment
Trang 13Cantilever Work Concept
Trang 14C uring Tensioning Form Setting Low er Re-B ar C om pletion U pper Re-B ar Installation U pper Re-B ar Installation U pper Re-B ar Installation C oncrete
Rail B eam Launching Form Traveler Launching Low er Re-B ar Installation Inner Form Setting PC -M aterial Arrangem ent PC -Strand Installation Form Tube Adjustm ent Form Tube C onfirm ationRem oval End Form Form C leaning & Form O il Form W ork C hecking and
Repairing B racing Pipe setting Form Tube setting G rout H ose setting C leaning W ork
C onstruction Joint chipping B lock O ut form Setting
Stop End Form ReterderTransverse Tendon
tensioning inspection
PC -Strand 15.2m m M aterialinspection
PC -Strand m aterial 21.8m minspection (Rust checking)
PC C oupler connectioninspection
PC strand positioninspection Final Inspection for C astingLongitudinal PC B ar Φ32
tensioning inspection
B racing Pipe Assem blingInspection
PC -B ar m aterial inspectionbefore inserting Tapingcondition
PC -B ar setting inspection U pper Re-B ar inspection C asting InspectionLow er Re-B ar Inspection B racing Pipe setting
inspection
Form tube settinginspectionForm inspection
C om pletion inspection for
C ast Segm ent (After 100%
cable stressing)Rail B eam Relocation
checking list
Form Traveler C hecking listbefore launching Elevation of Form checking
Form Traveler Form Setting
C hecking list Re-B ar for U pper Slab
G rout hose checking andnum bering, hose bandconnection taping
Form Traveler beforecasting check list
C leaning condition check
by Torch Lights corners ofbottom form s
Transportation Jack Pum p Form Traveler checking list
for launching
Re-B ar for B ottom Slaband W eb
PC B ar Arrangem ent & PC
-B ar m arking by tape forproper coupling
Transverse StrandElevation checking.(1T22)
Pum p and concrete pipearrangem ent for M &H Tow er C rane & Truckarrangem ent
B ottom finishing 1tim e
w ooden trow el and 1tim esteel trow el
Electric cable arrangem ent
for Jack & Pum p Stressing PC B ar dia 32.
Inner Form Elevation ,
C enter line C hecking
Location and Anglechecking of B racing Pipe PC -B ar length checking
W aste concrete basketsetting up
C hecking G rout H ose byAir after concretecasting.PC -Strands shall be
m oved to check clogging
C hecking list shall beprepared
Survey M arking
C onfirm ation (C enter
,Elevation and Transverse)
Stressing PC strand 1T22 Inner form cleaning and
replacing dam aged form
Location and Angle of FormTube checking
Form traveler anchorposition check
Transverse tendonanchorage treatm ent
C uring w ater preparation(m agic w ater)
C oncrete C hipping
C ondition
Transverse G roup
C ontrolling beforelaunching for cuttingstrands
Form oil applying C oncrete B lock rem oval
from deck
W aste B asket preparation
H ook re-bar arrangem ent
Form oil for box
Re-bar m ortar painting forprevention rust
C leaning W aste C oncrete
M &H and Vinaconex
Keeping Jack & Pum pproperly, covering bysheets
B racing Pipe assem bling
C hecking and D eadAnchor Setting
Tow er crane arrangem entfor concrete block rem oval
C om pressor arrangem entfor grout hose checking
Transverse Anchor headtreatm ent.(C oncrete cap)
C uring C ontrolling on site W eather forecast checking
for concrete casting
B olt setting for elevation
m onitoring (B ench M ark)
C leaning w ork after
concrete casting
Arrangem ent for rain Roofsheet
C hecking W eb portioncom pactionPrecam ber value
confirm ation for form
setting
Lighting system forlaunching W ork becom elate)
C oncrete m aterial stockchecking
C oncrete com paction
C hecking foot of bracingpipe
H and rail m aterial
arrangem ent for Form
O pening form B lister, inner
form and bottom of B racing
pipe to check honeycom b
Vinaconex Re-B ar m aterialtransportation andarrangem ent
PC M aterial Arrangem ent
Elevation m arking for bench
m ark After Stay cabletensioning 100%) Vibrators controlling,m inim izing hitting D ucts.Repairing H oney C om b Survey arrangem ent for
after launching(B oth side)
Form Tube M aterialArrangem ent Stop End form Reterder
C oncrete can not be run
m ore than 1m basically.Survey arrangem ent for
after concrete casting
B racing Pipe C ablePrevious Segm ent C utting
C hecking G round C onditon
to confirm the accessibility
of truck m ixers
Spraying w ater forconstruction joints
C hecking W ater Tank
C apacity and volum e
Plastic sheet for shading.Avoiding sunshine forconcrete
G routing W ork C leaning Surface W ork Request for Inspection
Arrangem ent D aily Report C hecking
Lighting systemconfirm ation for finishingSeparate W ork and D aily Activity
C oncrete B lock rem oval from deck
Tensioning Record for stressing bracing pipeTensioning Record Stressing PC B ar 26 for B racing Pipe
B racing Pipe 15.2m m tensioning inspection
B racing Pipe PC -B ar Φ26 tensioning inspection
Stressing B racing Pipe(After com pletion ,im m ediately
inform to Stay C able Team Stressing PC B ar 26 for B racing Pipe
Trang 153.2 Cantilever Cycle Schedule
Date Description
Stressing
Upper Slab Bracing Pipe & Form Tube Setting
Date Description
Stressing
Upper Re-Bar Bracing Pipe & Form Tube Setting
8 6
4
Pre-Stressing
Concrete ( 90m3/block )
3 2
and Bottom Slab
Stay Cable
Form&Form Tube
Adjustment
◆Morning Time Survey
Trang 161 2
1stDay
Trang 17Casting Concrete Bottom Slab
1stDay
Trang 18Casting Concrete Upper Slab
1stDay
Trang 19Casting Concrete
1stDay
Trang 20Curing Concrete
2Days
Trang 21After Casting End Form Condition
Trang 22Checking PC Bar Condition
3Days
◆Carefully Checking
◆Accurate Record
Trang 23Transverse PC Strand Stressing
3Days
◆Don’t Stand Behind Jack
◆Listening to abnormal Sounds
◆Clear Signal, Confirmation Step by Step
◆Both side ,Elongation checking
◆Don’t hurry up
Trang 24Longitudinal PC Bar Stressing
3Days
Trang 25Bracing Pipe 12V15 Stressing
3Days
Trang 26Final Check (Before Concrete)
installed to Mainframe.
RearCarriage uplift wheels are loose.
7
FrontTruss is supported properly on Mainframe-FrontBraceBeam.
FrontTruss is able to rotate into vertical plane Keeper bolts at base plate are adjusted.
previous segment.
Work Team Leader Vinaconex
Jo Engineer Leader
Form Traveller Checking List (No.5/5)
Form Traveler Checking
1 Rail Beam Relocation
2.Form Traveler Before Launching
3.Form Traveler During Launching
4.Form Traveler Form Setting
5.Final Checking Before Concrete
Trang 27Traveler Form Down
3Days
Trang 28Inner Form Down
3Days
Trang 29Front Side Anchors Removal and Main Jack Down
3Days
Trang 30Rear Anchors Removal
3Days
Trang 31Launching Form Traveler
3Days
◆Cleaning Condition
◆Material Controlling
◆Obstruction Checking
◆Following Check List
◆Checking each other
◆Checking underneath
Trang 32Launching Completion & Form Setting
Stop End Formwork
4 Days
◆Cleaning and Form Oil
◆Material Arrangement
Trang 33Rebar in Bottom Slab
Steel Pipe Brace (Square Type)
Steel Pipe Brace (Round Type)
Trang 34Inner Form Set Form Tube Setting
Trang 35Rebar Installation in Upper Slab
Trang 36Upper Re-Bar and PC Setting
Trang 37Final Checking before Casting
Stay Cable Form Tube
Horizontal PC Strand 1S21.8 Longitudinal PC Bar Φ32
Trang 38Form Traveler Anchors Hole Position
Trang 39Site Condition P4 Side (Hon Gai Side)
GIRDER CONSTRUCTION TEAM