Telelogic User Group Conference - 20th November 2007 61CiGi Technology Limited Consultants for Requirements and Systems Engineering Compliance v Qualification Verification –> Compliance
Trang 1Telelogic User Group Conference - 20th November 2007 61
CiGi Technology Limited
Consultants for Requirements and Systems Engineering
Compliance v Qualification
Verification –>
Compliance
Qualification ->
Certification Evidence Chain
Trang 2Requirements are not just for Christmas
Benefits so far
Trang 3Telelogic User Group Conference - 20th November 2007 63
CiGi Technology Limited
Consultants for Requirements and Systems Engineering
Benefits so far
Reduction in documentation
Request For Test Test Report (AR) Test Index (VCRM)
Compliance Demonstration Forms
Test once - Use many times
Trust
Trang 4Requirements are not just for Christmas
The Future
Trang 5Telelogic User Group Conference - 20th November 2007 65
CiGi Technology Limited
Consultants for Requirements and Systems Engineering
The Future
Roll out for each Capability Drop
Electronic Rig Logs
Automatic Acronyms & Glossary
Automatic Validation
SEFF - 3D visualisation
Change Management
Other BU’s
Trang 6Data Model
Trang 7Telelogic User Group Conference - 20th November 2007 67
CiGi Technology Limited
Consultants for Requirements and Systems Engineering
The Future
DOORS improvements
No need for custom DXL & Triggers
Trang 8Even after years of experience …
gordon.woods@incose.org