Because there is closed-loop temperature control, the reliability of reworked joints or PCBAs should be better.. The disadvantages of this method are that reflowing of nearby joints on c

Trang 1

© 2001 by CRC Press LLC

6 Since there is no moving gas, there is no built up of static

7 The method allows the use of the assembly robot’s gripper and vacuum suction heads, which can

be considered a major economic savings compared to the use of nozzles, which are all equipped

with vacuums

8 Despite the requirements of spot size adjustment and lens changing, the IR method eliminates

nozzle head design and manufacturing problems which are currently concerns for hot air/gas systems

9 Because there is closed-loop temperature control, the reliability of reworked joints or PCBAs

should be better

10 Noncontact heating eliminates tool marks

The disadvantages of this method are that reflowing of nearby joints on closely packed PCBAs is possible,

and reflow may occur at higher temperatures due to the use of short-wave IR

The solder fountain and VDI–SI couple-based reflow methods have been compared The study revealed that:

1 Solder fountain-based TH component rework is more effective because solder joints using a solder

fountain are reliable joints, and removal can be performed more safely due to the elimination of

sweated joints Furthermore, exclusion of sweated joints also eliminates the need for secondary

heating, which might degrade the PCB and take extra time

2 Even though the solder fountain method requires an X-Y-Z positioning table, the requirement of

an X-Y positioning table for all SM rework leaves only the need to justify a Z positioning table

This can indeed be justified, because the VDI–SI method requires a board reorientation facility

3 The use of a solder fountain and X-Y-Z positioning table eliminates the scattering of metal parts

on the PCBAs during leg cutting (removal)

4 The simultaneous desoldering and resoldering of the joints of the defective component decreases

the rework cycle time compared with sequential removal and resoldering of each leg

5 No adhesive dispensing is necessary This also eliminates adhesive curing and dispensing facilities

6 A solder fountain is less expensive than VDI–SI tooling

If double-sided mixed technology PCBAs are reworked, the method also has some disadvantages If any

insulated wire jumper exists in the vicinity of or just below a defective TH component, it may melt and

cause shorts If any SM components, such as micro-tabs, bobbins, or micro switches, which are not

resistant or suitable for wave soldering, are located in vicinity of or just below a defective TH component,

these can be damaged during removal Therefore, these components and jumper wires would need to

be removed during the preparation of the PCBAs for rework

6.7 Determination of Other Rework Requirements

Once decisions are made on the reflow methods for TH and SM components, analysis and decision

making based on rework requirements can be carried out to specify the other rework tooling necessary

for automation, and other related problems could be solved

Rework Tools

To achieve fully automated rework, the following needs to be considered [25]

Preparation of PCBAs for Rework

The cleaning of PCBAs and removal of conformal coatings are not necessary because the cell is designed

to rework assembly defects directly after manufacture when they are not covered by dust or other

contamination and conformal coatings (PCBAs are coated after the final test of the finished goods) and

are not subject to field defects The other problem when preparing a PCBA for rework is that of removing

obstructions (i.e., heat sinks, jumper wires, threaded fasteners, other components, etc.) The first three