3/ Che c k the batte ry bank voltage . If all the Power switch of battery is on, and ACEVN shut down, and battery bank voltage lower than 43V, the APM30 is working normal.. A: When ACE

Trang 1

字标标色 : 反白

字标 : 标黑标

08/02/14

-For Vietnam HT Project

Po wer Training &

Tro uble Sho oting

Trang 2

Q: Whe n will happe n “Batte ry c irc le c irc uit bro ke n alarm”?

A: 1/ Powe r s witc h of the batte ry

on EPS 90 rack is off

2/ Powe r s witc h o f the batte ry

in battery c abine t is off

3/ Co ntac to r o f BLVD ins ide the EPS 90 rac k is open

The “battery circle circuit broken alarm” will happen, if one of the up

presupposition exist.

Po we r s witc h o f the batte ry

Trang 3

3/ Che c k the batte ry bank voltage

 If all the Power switch of battery is on, and AC(EVN) shut down, and battery bank voltage lower than 43V, the APM30 is working normal The generator should be start to supply power (read next page)

Trang 4

A: When AC(EVN) shut down, the battery discharge to supply the load.

 When battery voltage lower than 44V, APM30 will open LLVD contactor, disconnect the load of LOAD1.

 When battery voltage lower then 43V, APM30 will open BLVD contactor, disconnect the load of LOAD2

Note: LLVD: Load Low Voltage Disconnect

Trang 5

Step1: Install PMU and PSU, Connect AC input, disconnect battery, Disconnect

Load1 and Load2, Put off Power switch of the battery;

Measure the Voltage between BAT.(+) and BAT.(-), voltage between RTN(+) and Load1(-), Voltage between RTN(+) and Load2(-) All of the voltage should

be about 53.5V.

Step2: Uninstall (take off, hot plug ) PMU;

Measure the Voltage between BAT.(+) and BAT.(-), it should be 0V;

Trang 6

Step3: Install PMU, Put on Power switch of the battery;

Use one cable to short circuit BAT.(-) and LOAD2(-), the voice of contactor be put on should be heard.

Step4: Remove the short circuit cable;

Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.

Step5: Uninstall (take off, hot plug ) PMU;

Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.

If all results as same as the up-step, the EPS90 sub-rack is working normally.

Trang 8

The pro ble m de s c riptio n:

1/ There is no output in Load1;

2/ If the AC shut down the battery can’t supply the load, both load1 and load2

The problem happen on 144077/144076 sites.

Trang 11

Ac c o rding o ur inquiry, the s e pro ble m s ite s be lo ng to o ne

s ubc o ntrac to r, this s ubc o ntrac to r c o nne c t this wro ng c able didn’t ac c o rding o ur re quire me nt and guide

Trang 12

The function of the temp sensor:

1/ Use for temperature compensation The float charge voltage is 53.5V at 25 , ℃

if temperature over 25 , APM30 will reduce float charge voltage, ℃ 80mV/bank/ The function will protect battery against expand ℃ 2/ For high temperature alarm If the temperature of battery cabinet over

50 , PMU will send high temperature alarm and then cut off the battery ℃

Trang 13

Wrong Ins tallatio n:

The battery temp sensor extend by ground cable

The battery temp sensor cable bend too much

Co rre c t Ins tallation:

Trang 14

Ca se 7: The proce ss for da ma ge d ba tte ry

Q: What is the pro c e s s fo r damage d batte ry?

A: Fill the <Battery Problem Feedback template> as following

If the battery in warranty, and the problem belong to quality and technical issue, submit to Auxiliary product service department by GCRMS.

If the problem belong to Solution, submit to Auxiliary product R&D department

by GCRMS

Battery Problem Feedback template

Trang 15

Ca se 8: Fa ctors a ffe ct the ba tte ry se rvice life

The following factors will affect the battery service life.

water loss to shorten the battery life According to Arrhenius equation, the temperature rises 10 degrees, the battery life will cut down a half

irreversible sulfates will be formed on the negative plates to reduce the battery capacity.

acid concentrate, grid corrosion exacerbation.

Trang 16

High charge voltage/

Long time overcharge

Sulphatio

n

Grid Corrosio n

Oxidation

Large size crystal

of lead sulfate Long time undercharge /

Frequent over discharge

Trang 17

Active materials fall off

A period time

Frequent overcharge Long time undercharge

High temperature or Without control of charge voltage

Trang 23

product0407.ppt 》

Trang 24

Q: S pare part kits o f PRS B48180/1800/V1(no te : Elte k po we r s ys te m)

1. ite m 02236366: Spare parts kit,PRS B48180/1800/V1 po we r s ys te m,Inc luding 10*re c tifie rs ,2*co ntro lle rs ,3*S PD,Fo r o ve r 100 s e ts po we r s ys te m ).

2313428 M500F,PS 48600-3/2900-X5 Po we r Sys te m Co ntro l Unit

2130623 PS48600-3/2900-X5-R48-2900 po we r s ys te m AC/DC Co nve rte 5de g C,45de g C,85V,290V,53.5V/50A

r,-Reference Document:

《 DKBA 1672-2008[1].11 Configuration Guide for Power Sys tems , Batteries , UPSs , Inverters and PDFs in Dro p Shipme nt Do c 》

Trang 25

Q: S pare part fo r AMP30 (no te : o utdo o r po we r unit)

Trang 26

19020118 SPD,100KA,2000V,AC200~240V,Kevin,Wall Mounte d Box

52270012 Environme ntal Conditioning Equipme nt,Environme nt Status Monitor And Po we r Controller,EPAC-Ag

Trang 28

→Power System/Battery/UPS/Distribution Cabinet

Ca se 12: The route to downloa d the spe cifica tion of powe r e quipme nt

Trang 29