1. Trang chủ
  2. » Thể loại khác

Implementation of Project Report

30 3 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề Implementation of Project Report
Thể loại đề án tốt nghiệp
Năm xuất bản 2008
Thành phố Bangkok
Định dạng
Số trang 30
Dung lượng 6,71 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Part 2: Policy and Replication strategy development 1.. Sign contract with consultants for policy and replication strategy development; 3.. Research to build the rules to protect environ

Trang 1

Livestock Waste Managerment Project in East Asia

Bangkok, 17-19/6/2008

Implementation of Project Report

Trang 2

General operations

1 Steering Committee :

- Meeting each 2 years

2 PMO:

- Meeting each twice a week

- Dealing working related plans and two sites.

3 PIUs:

- Regular Exchanging;

- Implement local activities.

Trang 3

General operations

4 Other operations:

- Purchasing equipment for

stage 1 plan activity and

transfering to PIUs

- Auditing

- Regular activities

Bàn giao thiết bị cho thôn Tử Dương

Bàn giao thiết bị cho huyện Vĩnh Cửu

Trang 4

Part 1:

Technology demonstration in Hatay

1 Carry out a survey for

technical design

Trang 6

Part 1:

Technology demonstration in Hatay

3 Transfering working spaces

Trang 7

Part 1:

Technology demonstration in Hatay

4 Carrying out building:

Trang 8

Part 1:

Technology demonstration in Hatay

5 PIU’s supervision

Trang 9

Part 1:

Technology demonstration in Hatay

6 PMO’s supervision

Trang 10

Part 1:

Technology demonstration in Hatay

7 Survey to selecting new sites:

Trang 11

Part 1:

Technology demonstration in Dong Nai

1 Survey to build mini PIP

Exchange technical issue

Trang 12

Part 1:

Technology demonstration in Dong Nai

2 Develop the technical in detail, to appraise

Trang 13

Part 2:

Policy and Replication strategy development

1. Co-ordinate with MARD and MoH to make a related policy;

2. Sign contract with consultants for policy and replication

strategy development;

3. Research to build the rules to protect environment in

breading and livestock waste water standards;

4. Hold a conference to collect experts’ comments about draft

on policy and replication strategy

Trang 14

Part 2:

Policy and Replication strategy development

 Some photos of meeting for policy and replication strategy

development:

Trang 15

Part 3 Monitoring and Evaluation

1 Survey and choose

place to take samples

2 Manage to take analysis

sample

Ground water

Trang 16

Part 3 Monitoring and Evaluation

1. To analyze in the laboratory

2. Make analysis report

Take underground water sample: Drill well

Trang 17

Organize Meetings and Workshops:

1 Organize Meetings and Workshops in Ha Tay and Dong Nai, including:

- The meeting about surveing livestock products (in

Hatay 18/5/2007; in Dongnai 22/5/2007);

- The workshop about definition of setting environment protection and subtainable for livestock production (22/5/2007 in Hanoi);

- The workshops about exchanging information,

capacity building and awareness raising (30/5/2007

in Hanoi)

Trang 18

Organize Meetings, workshops from

Trang 19

Organize meetings, workshops from PHRD fund:

 International workshop on approaching to the Carbon Finance (01/22/2008)

Trang 20

Part 4: Region Supporting Operation

Participate all the operation of FAO

- Meeting in Hanoi about DST (11/16-11/17/2007)

- Meeting to making policies in Thailand (6-7/12/2007)

- The third Steering committee Meeting in Thailand – RCG 3 (12/08/2007)

- Visiting and surveying Operation in Thailand

- Policy development Workshop in Bangkok, Thailand (17-19/6/2008)

- DST mini Workshop in Hanoi (24-27/6/2008)

Trang 21

WB supervisions

 Time 1 (April 2007)

In Đồng Nai

In Hà Tây

Trang 22

WB supervisions

 Time 2 (8-12 April 2008)

Trang 23

Next steps

Trang 24

Next steps:

Component 1- in HaTay

 Finishing 3 technology demonstration in Tu Duong

hamlet

 Testing to operate and adjust

 Surveying and designing technology in detail for

new sites

 Organizing training courses to disseminate

information about treating technology that are being set up and used; capacity building and awareness raising;

Trang 25

Next steps:

Component 1: in Dong Nai

 Finishing technology designing in detail

 Finishing Tender document about Project

Construction

 Managing to execute the work

 Managing to survey, and choose some new places

 Organizing some training courses about domestic

animal’s waste treating technology

 Organizing study tours in Ha Tay and some other

regions

Trang 26

Next steps:

Component 2 :

 Continuing finishing drafts for environment

protection policy and replication strategy;

 Organizing professional meetings to set up the

drafts;

 Organizing workshops to take suggestions for

policy and replication strategy development;

 Discussing about new policies applying and testing

mechanism

Trang 27

Next steps:

Component 3:

 Reporting, analysing about water sample

indexes in Tu Duong hamlet;

 Preparing plans to take samples for the new

sites;

 Taking and analysis sample for baseline at

the 05 demonstration sites in Tan An

commune and making reports.

Trang 28

Next steps:

Component 4:

- Coordinating with FAO in general operation;

- Providing information to DST software

setting up;

- Other operations related to China and

Thailand.

Trang 29

Next steps:

About other operations

 Organizing training course to disseminate

new livestock waste treatment technology;

 Organizing study tour, field visit for farmer in

two provinces (Ha Tay and Dong Nai);

 Organizing International study tour to

survey experiences and environment

protection operations in breeding.

Trang 30

Thank you very much!

Ngày đăng: 22/02/2023, 17:26

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w