What is Masdar City?A Sustainable City providing the highest quality of life with the lowest environmental footprint.. 100% Renewable Energy Zero Waste Net Zero Carbon Fossil Fuel Free
Trang 1September 10
Building the World’s Most Sustainable City
Trang 2What is Masdar City?
A Sustainable City providing the highest quality
of life with the lowest environmental footprint.
100% Renewable Energy Zero Waste
Net Zero Carbon Fossil Fuel Free Zone
Trang 3What is Masdar City?
Initiative of the Leadership of the Emirate
Trang 4Abu Dhabi Airport
Yas Island (Formula 1)
Saadiyat Island (Louve)
(Guggenheim)
Khalifa City
Abu Dhabi
Trang 5Agenda
Trang 6Traditional Arabic City Design
Trang 7People and Community
High Density /
Low Impact
Public Squares Mixed Use Development
Trang 8Sense of Place Research and Learning Architecture Quality of Place
Trang 10Life in Masdar City – Masdar HQ Exterior
p10
Trang 11Life in Masdar City – Masdar HQ Interior
p11
Trang 12Life in Masdar City – Civic Square
p12
Trang 13Life in Masdar City – Streetscapes
p13
Trang 14Life in Masdar City – Terrace
p14
Trang 15What makes Masdar City Unique?
A graduate-level, research-driven institution in partnership with MIT
Trang 16Building Design Generation Energy Waste Transportation
Design of a conventional city
Trang 17Design of Masdar City
Waste to Energy
Electric / Solar
Carbon offsetting / Carbon Sequestration -1%
Trang 18100% Powered by Renewable Energy
170MW from Photovoltaic
<30 KWh per capita per day
energy usage (9x LESS than USA)
Trang 19100% Renewable Energy Solutions
Concentrated Solar Power (26%)
Photo Voltaic (53%)
Evacuated Thermal Tube Collector (14%)
Waste to Energy (7%)
Trang 20MASDAR Water Strategy
Reduce water leakage to 3%
Trang 21Bundled projects scenarios – Onsite vs Regional
On-Site Scenario:
Study for On-Site Groundwater use
Seawater or Off-Site GW supply w/
on-site desalination
Brine Treatment and Reuse
Local Waste for 3 MW WtE
Regional Scenario : ADDC Water Supply Regional Waste for 10 MW WtE CSP from Small Square
Game Changing Issues:
Green Buildings Hydro Study re GW Volume WtE Demand Geothermal Resource On-site Desalination Greywater Recycling PRT vs Metro Small Square Timing
Misses Meets
Trang 22CH2M HILL Proprietary - Reuse Prohibited
On-Site scenario description
September 10 p22
Base Projects & Primary Projects
– Dry MRF + In-Vessel Composting
– Biomass burner – construction wood waste
– Waste minimization and AWCS
– Alternative water options-Dew/Fog collector
– Reduce undercroft lighting and ventilation
– Reduce non-resident building electrical load
– Geothermal energy + pumping to demand
– Reduce street lighting load
– Add 1 MW PV ground mount to 10 MW farm
– Eliminate blackwater treatment electrical load
– use biogas from anaerobic digestion
– Reduce water distribution energy load
– Water supply from seawater or groundwater
– RO desalination plant on-site
– Flora/Fauna/Wildlife/People optimization
Secondary Projects
– Install 3 MW WtE for non-recyclables
– Increase rooftop PV generation + cleaning
– develop recycle market
– Study on-site hyper-saline ground water
– Brine treatment and reuse of products
– Increase CSP electrical/thermal cooling ratio
– Increase electrical distribution efficiency
– Reduce ICT and PRT demand
Use Seawater or Off-Site Ground Water for potable water w/Green Power
at intake or well location
On-site Desalination, Brine Management & Reuse
All Energy Projects in top 31 ranked Roadmaps
11% Energy gap compare to 31% gap for demand < 40% AD reference w/Roadmaps
28% Energy gap compare to 44% gap for 10% better than AD reference results
0 500 1000 1500 2000 2500 3000
Ma y-0 8
Nov-08 Ma y-0 9
Nov-09 Ma y-1 0
Nov-10 Ma y-1 1
Nov-11 Ma y-1 2
Nov-12 Ma y-1 3
Nov-13 Ma y-1 4
Nov-14 Ma y-1 5
Nov-15 Ma y-1 6
Nov-16 Ma y-1 7
Nov-17
Trang 23CH2M HILL Proprietary - Reuse Prohibited
Onsite cost-benefits: demand comparisons
Develop & Strategy Investment = $46 million
Spending in 2009 = $14 million Spending in 2010 = $25 million Spending in 2011+ = $ 7 million
Energy
Water
Waste Biodiversity
Energy
Water
Waste Biodiversity
Goal Scenario 1
11% E Gap
0% W Gap 30% B Gap
28% E Gap
0% W Gap 30% B Gap
Trang 24CH2M HILL Proprietary - Reuse Prohibited
Regional scenario description
September 10 p24
Base Projects & Primary Projects
– Biomass burner – construction wood waste
– Alternative water options-Dew/Fog collector
– Reduce undercroft lighting and ventilation
– Reduce non-resident building electrical load
– Reduce street lighting load
– Eliminate black water treatment electrical load –
use biogas from anaerobic digestion
– Flora/Fauna/Wildlife/People optimization
Secondary Projects
– Install 10 MW WtE for non-recyclables + additional
imported waste
– Increase rooftop PV generation + cleaning
– CSP production on small square
– Increase CSP Electrical/Thermal cooling ratio
– Increase Electrical Distribution efficiency
Use ADDC for majority of potable water supply Import waste for WtE Generation
Determine ROI for Small Square CSP
3% Energy gap compare to 31% gap for demand < 40% AD reference
21% Energy gap compare to 44% gap for 10% better than AD results
0 500 1000 1500 2000 2500
Ma y-08
Nov-08 Ma y-09
Nov-09 Ma y-10
Nov-10 Ma y-11
Nov-11 Ma y-12
Nov-12 Ma y-13
Nov-13 Ma y-14
Nov-14 Ma y-15
Nov-15 Ma y-16
Nov-16 Ma y-17
Nov-17
Trang 25Concept Design in
9 months
Trang 26CH2M HILL Programme Management
Responsibilities include:
Design Health, Safety &
Environment Sustainability Project Delivery Program and Document
Controls
Procurement Performance Indicators Technology
City Governance
Trang 27PM Objectives on Masdar City
The Masdar City Vision is incorporated in the delivery of the overall programme.
The delivery of Masdar City to established budgets and
Trang 28Masdar City – Under Construction
Masdar Institute - Phase 1a
45,000 sq.m
August 2009
Trang 29Masdar City Layering
Trang 30Integrated Transport
Masdar City will be the first
land-based city to operate
without fossil fueled vehicles
Walking, electric vehicles,
cycling, PRT and LRT are
the modes of transportation
within Masdar City.
With 40,000 commuters per
day, Masdar City will have
strategically placed parking
areas for fossil-fueled
PRT Trips per day: 135,000
Max Walking Distance to PRT Station:
150m
LRT Trips per hour: 5,000 people
Personal Rapid Transit (PRT)
Trang 31LRT Station
PRT Station
Public Green Space
Public Park
Neighbourhood Centre
Place of Worship
Trang 32Supply Chain Sustainability
Definition
“Supply Chain Sustainability (SCS) is the
collaborative effort of multiple stakeholders to design, build, and operate a seamless, value- added supply chain to meet MASDAR’s goals and objectives”
Trang 34SMS - A Tool to Deliver the Masdar Vision
Trang 35Masdar City
Governance Department
What it is! What it is not!
Trang 37Sustainability includes the City Governance Department
The City Governance Department has worked to incorporate and integrate sustainability, expressed as the One Planet
Living Principles, into:
– Governance
– Management and Operations planning
Trang 38Supply chain mapping of
materials and products
Trang 39Next steps
Infrastructure associated
development
Phase 1 podium construction
Architectural competitions for iconic buildings
Optimising real estate mix