University of California, Hastings College of the LawUC Hastings Scholarship Repository Long Range Campus Planning Archive Hastings Archives and History 6-13-2016 Notice of Availability
Trang 1University of California, Hastings College of the Law
UC Hastings Scholarship Repository
Long Range Campus Planning Archive Hastings Archives and History
6-13-2016
Notice of Availability - Final Environmental Impact Report
UC Hastings College of the Law
Follow this and additional works at: https://repository.uchastings.edu/lrcp
This Article is brought to you for free and open access by the Hastings Archives and History at UC Hastings Scholarship Repository It has been
accepted for inclusion in Long Range Campus Planning Archive by an authorized administrator of UC Hastings Scholarship Repository.
Recommended Citation
UC Hastings College of the Law, Notice of Availability - Final Environmental Impact Report (2016).
Available at: https://repository.uchastings.edu/lrcp/39
Trang 21
University of California Hastings College of the Law
Notice of Availability of a Final Environmental Impact Report
To: Public Agencies and Interested Parties
From: University of California Hastings College of the Law
200 McAllister Street San Francisco, California 94102
Project Title: University of California Hastings College of the Law Long Range Campus Plan
Under the requirements of the California Environmental Quality Act (CEQA) and its Guidelines, and the University of California Hastings College of the Law (UC Hastings) CEQA Guidelines, a Final
Environmental Impact Report (Final EIR) has been prepared by UC Hastings in connection with the proposed Long Range Campus Plan (LRCP) UC Hastings is the Lead Agency for environmental
review and has evaluated the potentially significant environmental effects of the proposed LRCP The Final EIR found that, to the extent nighttime construction were necessary, certain nighttime
construction noise effects would be reduced but not avoided with implementation of mitigation
measures Therefore, construction noise would be a significant unavoidable environmental impact The LRCP Draft EIR was published and made available for a 45-day public review period beginning
on March 25, 2016, through May 9, 2016 During this time, UC Hastings received written comments
on the Draft EIR A public hearing was also held on May 3, 2016 to receive oral comments on the
Draft EIR Written and oral comments on the Draft EIR were documented and addressed through
written responses, as well as taken into consideration for revisions to the Draft EIR Those comments and responses, as well as revisions to the Draft EIR, have been compiled in the Environmental Impact Report Response to Comments document That document, together with the revised Draft EIR,
constitute the Final EIR The UC Hastings Board of Directors will consider certification of the Final EIR at 900 A.M., July 14, 2016, at 200 McAllister Street, 2nd Floor, in the Alumni Reception Center
Final EIR is available for review online at:
http://www.uchastings.edu/about/leadership/strategic-plan/lrcp/eir/index.php
The Final EIR is also available for review at the Circulation Desk in the UC Hastings Law Library, UC Hastings College of the Law, 200 McAllister Street, San Francisco, CA 94102