University of California, Hastings College of the LawUC Hastings Scholarship Repository Long Range Campus Planning Archive Hastings Archives and History 6-13-2016 Notice of Availability

Trang 1

University of California, Hastings College of the Law

UC Hastings Scholarship Repository

Long Range Campus Planning Archive Hastings Archives and History

6-13-2016

Notice of Availability - Final Environmental Impact Report

UC Hastings College of the Law

Follow this and additional works at: https://repository.uchastings.edu/lrcp

This Article is brought to you for free and open access by the Hastings Archives and History at UC Hastings Scholarship Repository It has been

accepted for inclusion in Long Range Campus Planning Archive by an authorized administrator of UC Hastings Scholarship Repository.

Recommended Citation

UC Hastings College of the Law, Notice of Availability - Final Environmental Impact Report (2016).

Available at: https://repository.uchastings.edu/lrcp/39

Trang 2

1

University of California Hastings College of the Law

Notice of Availability of a Final Environmental Impact Report

To: Public Agencies and Interested Parties

From: University of California Hastings College of the Law

200 McAllister Street San Francisco, California 94102

Project Title: University of California Hastings College of the Law Long Range Campus Plan

Under the requirements of the California Environmental Quality Act (CEQA) and its Guidelines, and the University of California Hastings College of the Law (UC Hastings) CEQA Guidelines, a Final

Environmental Impact Report (Final EIR) has been prepared by UC Hastings in connection with the proposed Long Range Campus Plan (LRCP) UC Hastings is the Lead Agency for environmental

review and has evaluated the potentially significant environmental effects of the proposed LRCP The Final EIR found that, to the extent nighttime construction were necessary, certain nighttime

construction noise effects would be reduced but not avoided with implementation of mitigation

measures Therefore, construction noise would be a significant unavoidable environmental impact The LRCP Draft EIR was published and made available for a 45-day public review period beginning

on March 25, 2016, through May 9, 2016 During this time, UC Hastings received written comments

on the Draft EIR A public hearing was also held on May 3, 2016 to receive oral comments on the

Draft EIR Written and oral comments on the Draft EIR were documented and addressed through

written responses, as well as taken into consideration for revisions to the Draft EIR Those comments and responses, as well as revisions to the Draft EIR, have been compiled in the Environmental Impact Report Response to Comments document That document, together with the revised Draft EIR,

constitute the Final EIR The UC Hastings Board of Directors will consider certification of the Final EIR at 900 A.M., July 14, 2016, at 200 McAllister Street, 2nd Floor, in the Alumni Reception Center

Final EIR is available for review online at:

http://www.uchastings.edu/about/leadership/strategic-plan/lrcp/eir/index.php

The Final EIR is also available for review at the Circulation Desk in the UC Hastings Law Library, UC Hastings College of the Law, 200 McAllister Street, San Francisco, CA 94102