Nội dung

Why do concrete problems occur?... Designing Concrete Mixtures... Concrete Durability Ability of Concrete to  Ability of Concrete to Resist Weathering Action, Chemical Attack, and Abra

Trang 2

Why do concrete problems occur?

Trang 4

Discussion:

 Desired Durabilityy

 Mix Design Requirements

 Mix Design Requirements

 ACI 318-08 Updates- CH 4

Trang 5

Designing Concrete Mixtures

Trang 6

Concrete Durability

 Ability of Concrete to

 Ability of Concrete to Resist Weathering Action, Chemical Attack, and

Abrasion While Maintaining its Desired

Engineering Properties

M-21 / Plaster Creek

Trang 10

Cement Content

PCA RD129

Trang 12

Sulfate attack

Trang 13

Materials and Methods

t I hibit S lf t Att k

 Low Permeability Concrete

 Sulfate Resistant Cements

 Type II, V, MS, HS

 Surface Treatments

Trang 14

Requirement for Sulfate Exposure q q p p

318

Note- PCA Requirements include a w/cm < 0.40, and a minimum compressive strength of 35Mpa (5000psi) for Very Severe (S3) Sulfate Exposure.

Trang 15

< 0.10% at 18 months

Trang 16

Freeze Thaw Exposure Thaw Exposure

Trang 17

Resistance to Freeze

Resistance to Freeze Thaw Thaw

Criteria :

prior to first freezing (> 3.5 MPa or 500 psi)

prior to cyclic freezing &

thawing (> 28 MPa or 4000 psi) 318- min 4500 psi.

Trang 18

Strength & w/cm Requirements

Exposure Conditions- F0, F1, F2, F3

ACI 318-08

Trang 19

Limits on SCMs

ACI 318

Trang 20

Total Air Content ACI 318

ACI 318 08 08

Trang 21

Effect of Air Content

Trang 22

Air Void Spacing & Volume

L

the the cement paste from the periphery of an air void

ASTM 457 < 0.2 mm (0.008 in.)

L

surface area of a quantity of air voids

Trang 23

Effect of Spacing Factor

Trang 24

Alkali Aggregate Reaction Aggregate Reaction

Trang 25

Occurrence of ASR in the United States

Trang 26

Materials and Methods

to Inhibit ASR

to Inhibit ASR

 Pozzolans, Slag, and Blended Cement

 Low Alkali Portland Cement

 Low Alkali Portland Cement

 Limit Concrete Alkalies

 ASR Inhibiting Compounds

 ASR Inhibiting Lithium

Compounds- Aggregate Selection and gg gBeneficiation

Trang 28

Limiting the Alkali Content of Concrete

occur with most

0.2

CS

alkali content of the

concrete is less that 3.0

0 1.0 2.0 3.0 4.0 5.0 6.0

Trang 29

Corrosion

Trang 30

Carbonation

Trang 32

ACI 318

08 Chloride Limits and Design Requirements

Trang 33

Materials and Methods

Trang 34

Low Permeability Concrete Permeability Concrete

Corrosion Resistance Corrosion Resistance

Permeability-ASTM C1202

 Less than 2000 Coulombs

 Effect of test age?

Trang 35

Cracking vs Durability g g y y

Trang 37

Volume Stability

Volume

Stability Low Shrinkage Concrete

 Low Shrinkage Concrete

ASTM C157

 Less Than 400 millionths

Trang 38

Surface Blemishes vs Defects

Is it a Durability Issue??

Trang 39

Acceptance Criteria

 General Acceptance criteria-p

-Architecturally acceptable concrete Architecturally acceptable concrete surfaces should be aesthetically

surfaces should be aesthetically compatible with minimal color and texture variations and minimal surface ff defects when viewed at a distance of approximately 20 ft (6m) or more as agreed upon by architect, owner, and contractor, or as otherwise specified.

Trang 40

 Preconstruction meeting

 Prequalification of finishing crew

 Test panels, Mock ups

Trang 41

Specify Curing Regime

When not otherwise specified (ACI 301):

above 50° F and in a moist

condition for at least the first

7 days after placement.

shall be maintained above 50°

F and in a moist condition for

at least the first 3 days.

Trang 45

Be Clear on Desired Outcome

 Specify enough “hoops” to

 Specify enough “hoops” to jump through to get the performance you require forperformance you require for service conditions

Trang 46

Caution Requirements that

Bind Contractors Hands Bind Contractors Hands

 Means and Methods

 Materials Types

Trang 47

State the Obvious

 If it isn’t in the Specification, it

probably won’t happen

 Ex: Curing Regime