high population density, dominant informal economy, unplanned development, low density of road accessible to buses, and motorcycles optimised?. How to make people use MRT given the exist
Trang 1Modern Metro Systems
for environmental friendly Megacities
Dr Hieu, NGUYEN NGOC MSc Nam, TRAN HOANG MSc Van, DAO THI BICH
Trang 4Congestion and motor-cycles
BACKGROUND
Trang 5Threats - negatives
1 Saturated traffic – prolonged peak
hour – unplanned districts
2 Car transformation age
3 Low public transport mode share
4.4% & underuse of bus capacity
4 Increasing congestion situation
Trang 6Hopes - positives
1 Building pattern in new districts
may support better use of MRT
2 Motorcycle condition will be
worsen while MRT is increasing
3 People would change their habit
together with the evolvement of
Trang 7MRT & existing development
BASIC
QUESTIONS
1 How M‘T s plays its role given the existing urban development/building pattern? (high population density, dominant informal economy, unplanned development, low density of road accessible to buses, and motorcycles optimised)?
2 How to encourage people using MRT given overwhelming use of motorcycle (benefits of low cost, high accessible to small lanes and all destination, flexible time, controlled, and easy for doing carrying goods along)?
3 How to make people use MRT given the existing walking habit (long walking distance is a barrier in hot weather)?
Trang 8MRT line 2 – accessible to station by mode
BACKGROUND
Source: MAUR - IC, 2012
Trang 9Unparalleled improvement measures – FINANCING CAPACITY
Satisfaction level comparing
to motor cycles?
LR solutions?
BASIC
QUESTIONS
Trang 10Basic concept
Land Re-adjustment:
to distribute cost and redistribute benefit after investment
Capturing values by
internalizing
investment
LR ANALYSIS
Trang 11LR ANALYSIS
Trang 12Application-redevelopment shinkansen station (1)
After
Before
Shinagawa Station opened for Shinkansen (in 2003)
Every Shinkansen stops at Shinagawa St (from 2008)
Source: Masanori Tanaka, 2014
LR ANALYSIS
Trang 13Application-redevelopment shinkansen station (2)
Source: Masanori Tanaka, 2014
LR ANALYSIS
Trang 14Proposal LR – Giap Bat station
LR ANALYSIS
Trang 15Proposal LR – Giap Bat station (2)
LR ANALYSIS
Trang 16MRT stations potential to apply value capture
Demand on
changes
High – transit needs
High public hub transformation
Needs to new development?
Allow to change FAR, incentives &
supporting regulations
Enabling regulation changes?
LR ANALYSIS
Trang 17MRT stations probability
Interchange (++)
Rail – rail Rail – buses /BRT/ monorail
Existing hub
Space specific Un-supporting MRT unused spaces Convertible/
Regulations/plan increase FAR Allow to
Allow to change incentives &
supporting regulations
LR ANALYSIS
Trang 18Population density in MRT coverage areas
Source: MAUR - IC, 2012 Source: author
LR ANALYSIS
Trang 19Population density and MRT system
LR ANALYSIS
Source: author using GSO 2009
Districts population area population density
Trang 20MRT stations
MRT in HCMC
Opera House S1 - Ben Thanh (Line 2) Depot Thanh Xuan Depot S1B - Gia Dinh Park (Line 4B) Da Phuoc Depot Ba Queo (line 6)
Ba Son S2 - Tao Dan Cong Hoa (Line 3B) S1 - Thanh Xuan S2B - Tan Son Nhat S1 - New Can Giuoc Terminal Au CoBen Thanh (Line 1) S3 - Dan Chu Tu Du S2 - Giao Khau S3B - Lang Cha Ca S2 - Da Phuoc Thong NhatPackage 2 S4 - Hoa Hung Tao Dan S3 - Nga Tu Ga 3 S3 - Phong Phu Tan PhuVan Thanh Park S5 - Le Thi Rieng Park Ho Con Rua S4 - An Loc Bridge S4 - Trinh Quang Nghi Hoa BinhTan Cang (Line 1) S6 - Pham Van Hai Hoa Lu S5 - An Nhon S5 - Vanh Dai Trong Dam senThao Dien S7 - Bay Hien (Line 2) Thi Nghe S6 - Lam Son S6 - Nguyen Van Linh Phu Lam (line 6)
An Phu S9 - Ba Queo (line 2) Hang Xanh (Line 3B) S7 - Go Vap Intersection S7 - District 8 Coach Station U-turnRach Chiec S8 - Nguyen Hong Dao Mien Dong Terminal S8 - 175 Hospital S8 - Tung Thien Vuong U-turnPhuoc Long S10 - Pham Van Bach Hiep Binh Chanh S9 - Gia Dinh Park (Line 4) S9 - University of Medicine and Phramacy 9Binh Thai S11 - Tan Binh Hiep Binh Phuoc S10 - Phu Nhuan Intersection (Line 4) S10 - 3 Thang 2
Thu Duc S12-Tan Thoi Nhat Hiep Binh S11 - Kieu Bridge S11 - Ho Chi Minh City University of Technology
High Teck Park S13-Hung Thuan Hiep Binh Phuoc Depot S12 - Le Van Tam Park S12 - Bac Hai
Suoi Tien Terminal S14-An Suong Terminal 11 S13 - Nha Van Hoa Thanh Nien S13 - Tan Binh Market
Long Binh Depot S1E - Ham Nghi S14 - Ben Thanh (Line 4) S14 - Bay Hien (Line 5)
14 S2E - Vong Cung S15 - Hoang Dieu S15 - Lang Cha Ca
S3E - Cung Thieu Nhi S16 - Ton Dan S16 - Hoang Van Thu Park
S4E - International Hospital S17 - Tan Hung S17 - Phu Nhuan Intersection (Line 5)
S5E - Binh Khanh S18 - Nguyen Thi Thap S18 - Nguyen Van Dau
S6E - Thu Thiem S19 - Nguyen Van Linh S19 - Ba Chieu Market
Tham Luong Depot S20 - Phuoc Kien S20 - Bach Dang
20 S21 - Vinh Phuoc S21 - Hang Xanh (Line 5)
S22 - Pham Huu Lau S22 - Tan Cang (Line 5)
S24 - Long KienS25 - Ba ChiemS26 - Long ThoiS27 - Rach DoiS28 - Hiep Phuoc Vocational SchoolS29 - Sport Park
S30 - International HospitalS31 - TT Hiep PhuocS32 - Cay Xanh ParkS33 - Ben Tau Hiep PhuocDepot Hiep Phuoc
Trang 21Catchment capacity – line 2 – R500 assumption
LR ANALYSIS
Trang 22MRT line 2 population within walking distance
No station ward district population density walking area population
1 S1E - Ham Nghi Nguyen Thai B District 1 26761 21007
4 S4 - Hoa Hung Ward 13 War District 10 48942 38419
5 S5 - Le Thi Rieng Park Ward 15 District 10 35789 28094
6 S6 - Pham Van Hai Ward 7 Tan Binh District 32591 25584
7 S7 - Bay Hien (Line 2) Ward 11 Tan Binh District 44250 34736
8 S8 - Nguyen Hong Dao Ward 14 Tan Binh District 33083 25970
9 S9 - Ba Queo (line 2) Tay Thanh W Tan Phu District 13421 10535
10 S10 - Pham Van Bach Tay Thanh W Tan Phu District 13421 10535
11 S11 - Tan Binh Tay Thanh W Tan Phu District 13421 10535
12 Tham Luong Depot Tan Thoi Nha District 12 11411 8958
13 S12-Tan Thoi Nhat Tan Thoi Nha District 12 11411 8958
14 S13-Hung Thuan Tan Thoi Nha District 12 11411 8958
15 S14-An Suong Terminal Ba Diem War Hoc Mon District 7044 5530
16 S2E - Vong Cung Thu Thiem W District 2 3452 2710
17 S3E - Cung Thieu Nhi Thu Thiem W District 2 3452 2710
18 S4E - International HospitalAn Loi Dong W District 2 1599 1255
19 S5E - Binh Khanh Binh Khanh W District 2 4354 3418
20 S6E - Thu Thiem An Phu Ward District 2 1750 1374
LR ANALYSIS
Trang 23Space specific Le Thi Rieng station – good layout
LR ANALYSIS
Trang 24Space specific Pham Van Hai station – bad layout
No a for uses or ta is or xe o area Not enough space for walking
No preparation for retail concentration around station
in future
LR ANALYSIS
Trang 25Improvement & accessibility – line 2 - Bay Hien
Trang 26Trial of land value capture - dilemma
LR challenges
Case 1 - Statutory price, road 10
Case 2 - Statutory price, road & alley 8
Case 3 - Market price, road 30
Case 4 - Market price, road & alley 26
Trang 27Implementation of LR – new & complicated
Support
• Land law enables
community development approach (though unclear)
• Land exchange/
consolidation tradition/experience
• Political support to have
• Inexperienced stakeholders
• Law not yet specified
• Culture of exchange unprecedented
LR ANALYSIS
Trang 28Financing development
re-Legal issues – barrier free and legal support
Commitment and bureaucracy motivation to sustain in a long process?
Trang 29Dr Hieu, NGUYEN NGOC MSc Nam, TRAN HOANG MSc Van, DAO THI BICH
SUD, VGU