THE SOCIALIST REPUBLIC OF VIETNAM - CỘNG HOÀ XÃ HỘI CHỦ NGHĨA VIỆT NAM
MINISTRY OF TRANSPORT - BỘ GIAO THÔNG VẬN TẢI
PROJECT MANAGEMENT UNIT THANG LONG - BAN QUẢN LÝ DỰ ÁN THĂNG LONG
HANOI CITY RING ROAD NO.3 CONSTRUCTION PROJECT
DỰ ÁN XÂY DỰNG DUONG VANH DAI 3
Under JBIC Loan Agreement No VN VII-4
PACKAGE 1; MAI DICH — TRUNG HOA LAKE SECTION GÓI THẦU 1: ĐOẠN TUYẾN MAI DỊCH — TRUNG HOA
SHOP DRAWING BAN VE THI CONG
DRILLING BORED PILE OF PIER THAP1
COC KHOAN NHOI TRU THAP1
Rev ñ1 - Trình lẩn1 -
.11-2011
TƯ Theo Hiép Dinh Vay Von JBIC Sd VN VIk4 eae
Trang 2
TTTTT TT NORTH SOUTH 8 ale ŒOo L;¡ La ca | TT “~ CAOĐÔDAY8Ệ 21%
ve: [ivf ttt | LEVEL OF PILE CAP 1 WW als
were BEMONG/PLECAP| | 43,699 4 3 alÐ
£ NORTH _ @T _ ag SOUTH
— ; ; —
Na es
Le Gey = Bà
A ⁄2 ta
he FT
«10,64 Lo
td
⁄ |-+—L_- PIER NO | STATION COORDINATE (COORDINATE (BORED PILE)
Lp TEN TRU| LY TRINH | TOA DO (TIM BE TRU) TÊN CỌC TOA ĐỘ (TIM CỌC)
ssa |-4~E- 1 504075.667 | 324112.129
jo LL THAPI KM0+223.9 504075.381| 324110.027 2 504073279 | 324110.313
L_ + aL CỌC KHOAN NHỐI DỊ.0M, L=39M
mm CLP PILE D1.0M, L=39M
II + Lol
BRD
1D _ FILLING SOIL, CONCRETE, BRICK CID DAT DAP, BETONG, GACH DA
CLAY, GREYISH BROWN, YELLOWISH GREY, REDISH BROWN, STIFF SẼT GÂY, NÂU XÂM, XÂM VÀNG, NÂU ĐỎ, TRẠNG THÁI DẺO CỨNG
aialz= ! FINE SAND, YELLOWISH GREY, MEDIUM DENSE CẮT BỤI, XÂM VÀNG, CHAT VUA
: Oo 3 ol + aa t — r a CAO MŨICỌC CLAY, BLACKISH GREY, MEDIUM STIFF sét GAY XAM DEN , DEO MEM
6 ° 5 IR 7 “a 1 — L TT LEVEL OF PILE TIP CLAY, BROWNISH GREY, VERY STIFF sét GAY, XAM NAU, TRANG THÁI NỬA CỨNG
lo 5 olL + _ L + _ L pa | l| ¡525 Zia —_MEIOUM SAND, SC MEWHERE WITH FINE SAND, WHITEWISH GREY MEDIUM DENSE CED CAT BYILAN SAN, MAU XAM TRANG, KET CAU CHAT VUA
- ˆ ki na 5 ° 3 - Ì + t = rot ¬ BaD GRAVEL SAND, SOMEWHERE WITH FINE SAND REENSH GREY WHITESH GREY, DENSE GRD CẮT CẤP PHỐI TỐT LẦN BỤI, SÔI SẠN, MÂU XÂM XANH, XẮM TRANG, KET CAU CHAT VUA
eral O65 L T _T T — - Lê GRAVEL, MULTICOLORED, VERY DENSE ‘ 7" BES” cui 861 CAP PHOI XAU, BA SAC MAU, KET CAU RAT CHAT
GHI CHÚ :
4 KÍCH THƯỚC TRONG BẢN VẼ LÀ MM, CAO ĐỘ LÀ M
NOTES:
1 DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METTER
MINISTRY OF TRANSPORT HANOI GITY RING ROAD NO.3 CONSTRUCTION PROJECT free the ovens opesusy Tâm vor | “tow
PROJECT MANAGEMENT UNIT THANG LONG PACKAGE 1: MAI DICH - TRUNG HOA LAKE SECTION (KM 19+620-KM23+195) BẰNG TOA ĐỘ - TRỤ THAP1 PREPARED BY ÌNGUYENDANGHOANG SAMWHAN - CIENCO4 JOINT OPERATION
BOQ GIAO THONG VAN TAI DỰ ÁN XÂY DỰNG VÀNH ĐẠI 3 THÀNH PHO HA NOI OINATE TABLE - AS SHOW | SW-CEWD-CLP-001-2011 J" checkeD BY ucuYeN TRUNG THANH 97] LIEN DANH SAMWHAN - CIENCO4
BAN QUAN LY DU AN THANG LONG GÓI THẦU 1: ĐOẠN MAI DICH - TRUNG HÒA (KM 19+620-KM23+195) COORDINATE TABLE - PIER THAPI XEM HINH VE [APPROVED cua BY | ” HoạNG HỤU SON
Trang 3
MẶT CHÍNH
KHUNG A - FRAME A
KHUNG B - FRAME B KHUNG C - FRAME C
KHUNG D - FRAME D
(1:60) (KHONG THE HIEN COT BAN (KHÔNG THỂ HIEN COT DAN (KHONG THE HIEN COT BAD
(KHONG THE HIEN COT BAN
(NOT SHOW STIRRUPS)
(1:60)
8 PTA-4-D22 6 Ẽ = E -
in sĩ Sẽ g_ EXISTING GRQUND
i lị és Ms CAO ĐỘ TỰ NHIÊN
8| 2 EN Sziag
- a 4z|a9 ros gs 7 BY
a,
“|
8 = TOP OF STEEL a s e §
| 8 +4.849 CAGE LEVEL 8 Ñ § = ( S
& pAyse 8| PS'-D13 | } + + rae 5 — ale tl
HR
g PILE CAP 4+3,849 2/5 9/8 SIs
3,689 Mo _CUT OFF LEVEL ‘2 \ OG =|
an - = + Elöð——H]—-j — —— I
§ Z|
„| Ÿ
al 8
=| 8 9
=
<
8
P1A-5-D25
E : = a dH)
3 ) \ Š | š a) =
-_8 8 P2-4-D29 8 =
8| 3/5 h § 5
bộ) ) GHI TIẾT "A*
S
(
Z I SONIC TEST WY \ ( ) ( ) ở
ỏ Xà \CHLTIET "8" ®
DETAIL "B*
g tt
+
|W
°
wo
8
Fla
š ch: \ 2s s sO
s = Ñ 735.151 °
PILE TIP
MINISTRY OF TRANSPORT HANOI CITY RING ROAD NO.3 CONSTRUCTION PROJECT reewe ee DRAWING No: cathe ee cae sane
PROJECT MANAGEMENT UNIT THANG LONG PACKAGE 1: MAI DICH - TRUNG HOA LAKE SECTION {KM 19+620-KM23+495) 86 TRI COT THÉP CỌC KHOAN NHỔI - TRỤ THAP1(1/3) PREPARED BY_ NGUYEN DANG HOANG Zaf | SANWHAN- CIENCO4 JOINT OPERATION
BO GIAO THONG VAN TAI DỰ ÁN XÂY DỰNG VÀNH ĐẠI 3 THÀNH PHỐ HÀ NỘI : AS SHOW - | 6M-2I-ND-GLP-0022011 [ốiEG⁄E3 my” lụawenTaUNe AM 7 LIÊN DANH SAMWHAN - CIENCO4 BẠN QUẦN LÝ DỰ ÁN THĂNG LONG GÓI THẦU 1: ĐOẠN MAI DỊCH - TRUNG HÒA (KM 19+820-KM23+195) RENFORCEMENT DETAIL OF BORED PIER THAPI(H3) xs HINH VE APPROVED ours Teun EY | ogni nas son
Trang 4
Chàm CHI TIẾT NỐI THÉP CHỦ - DETAIL JOINT REBAR
300 3ø XU =| 7 7 | Te11700 MỐI NỔI / JOIN - J
» WUT SNK OK TT ¬ ee —=———~_——_ 3) ja 3)
300 Le t2 po 11798 —Z“— [=SnoC) MỐI NỔI / JOIN J
CHI TIET NOI ONG SONIC - DETAIL JOINT STEEL SONIC TUBE
.ỐNG.SONIC.M1.- STEEL SONIC TUBE.M1
(1:35)
41761
6000 6000 6000 6000 6000 6000 5761
BO TRI ONG SONIC Ry it nh Lt th Lt nh tl nh CC th tt tS CC
ARRANGEMENT Steel SONIC TUBE \ ĐẦU ỐNG SONIC Mi/ TOP OF STEEL SONIC TURE M1 ONG SONIC M1 - STEEL SONIC TUBE Mi À MỐI NỔI ỐNG M1/JOIN M1 TUBE
ỐNG SONIC M2 - STEEL SONIC TUBE M2
9 1990 5 6000 6000 6000 e000 6000 6000 4961
Su ốno váng op {( ot {Lt rh (t mh (tl rh iL rh {( = ye
| 46.76 eae Án eLevaTiON t L) SS rh SS Hi > i ~ SS ih SS th S)— + i) +
H.IT | CAO ĐỘ MẶT ĐẤT HIỆN TẠI Â pẦu ONG SONIC M2/ TOP OF STEEL SONIC TUBE M2 ỐNG SONIC M2 - STEEL SONIC TUBE M2 \ MỐI NỐI ỐNG M2/ JOïN M2 TUBE
DETAIL OF CONNECTOR TYPE Mt DETAIL OF CONNECTOR TYPE M2
= ỐNG VÁCH CHI TIET NỘI ƠNG SONIC M1 GHI TIẾT NĨI ƠNG SONIC M2
400
REIFORGEMENT D25 100 SEALED AROUND BY WELDING 50, s0 | SEALED AROUND BY WELDING SBT THEP cH poe tI SEALED AROUND BY WELDING BIT XUNG QUANH BẰNG MỖI HÀNÀ- 1 QUANH BẰNG MỐIHÀN
s|š
ale aS STEEL SONIC TUBE P STEEL SONIC TUBE fennel bngennnnnnnenen ¬
a ễ Ala OUTSIDE 059.9, T=4 SUTSIDE D055 1 Trey BE OUTSIDE D=59.9, T=4 STEEL SONIC TUBE STEEL CONNECTER TUBE STEEL SONIC TUBE
t o MS ONG SONIC BANG THEP ONG THEP NOI ONG SONIC BẰNG THÉP OUTSIDE D=113.5, T=5 OUTSIDE D=117.5, T=2 OUTSIDE D=113.5, T=5
ae ae ĐƯỜNG KỈNH NGỒI D=89.9, T=4 ĐƯỜNG KỈNH NGỒI D=63.9, T=2 ĐƯỜNG KÍNH NGỒI D=89.9, T=4 'ỐNG SONIC BẰNG THÉP ỐNG THÉP NỐI 'ỐNG SONIC BẰNG THÉP
ele AS ĐƯỜNG KÍNH NGỒI Ð=113.6,Tz5 ĐƯỜNG KÍNH NGỒI D=117.8,Tz2 ĐƯỜNG KÍNH NGỒI D=113.8,T=§
BS STEEL SON Tung CHI TIET DAU ONG SONIC M1
3 5 OUTSIDE D=113.5, T=5 DETAIL COVER OF STEEL SONIC TUBE M1 CHÍ TIẾT "A" - DETAIL "A"
iLL |-—-7-~"_ SG SONIC BANG THEP (1:10) (10)
+] ĐƯỜNG KỈNH NGỒI D=113.5, T=5 6-6 ĐƯỜNG HÀN - WELD
OUTSIDE 059.9, T=4 2 PHI GHI TIẾT "B" - DETAIL "B
1 ĐƯỜNG KỈNH NGỒI D=59.9, T=4 d 599 (5 Onc SIÊU ÂM
a - 2 - CHI TIẾT ĐẦU ỐNG SONIC M2 1213 „®
| DETAIL COVER OF STEEL SONIC TUBE M2 b ‘ °
\ \ CAP OF SONIC vols
oD D 1 KÍCH THƯỚC TRONG BAN VELA MM, CAO BO LAM
1285 1235 P1-D29 ————
1 DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METTER
MINISTRY OF TRANSPORT HANOI CITY RING ROAD NO.3 CONSTRUCTION PROJECT Pịoh tu we BH Ng số, lu ae oom ae ° ON
PROJECT MANAGEMENT UNIT THANG LONG PACKAGE 1: MAI DICH- TRUNG HOA LAKE SECTION (KM 19#620-KM23+195) BỐ TRÍ CỐT THÉP CỌC KHOAN NHỔI - TRỤ THAP1(2/3) SB-C4-NO.C12006/2011 | E2 20nne_NGƯIENOAISHOSNG SAMWHAN - CIENCO4 JOINT OPERAT,
BỘ GIAO THƠNG VẬN TẢI _ DỰ ÁN XÂY DỰNG VÀNH ĐAI 3 THÀNH PHỐ HÀ NỘI REINFORCEMENT DETAIL OF BORED PIER THAPIONS AS SHOW — nH CHECKED BY ]\ouycN TRỤNG THANH 1, LIEN DANH SAMWHAN - CIENCO4 BAN QUAN LY DU AN THANG LONG GĨI THẦU 1: DOAN MAI DICH - TRUNG HOA (KM 19#620-KM23+195} (28) XEMHÌNH VẼ APPROVED BY | HOANG HN SON [7
Trang 5
1000 1000 1000 1000 1000
150 _, 700 150 150, 700 ¡_ 150 150 _, 700 180 450, 700 150 150) 700 1150
PS-D13-2500 PS-D13-2500 5-13-2500
Y
P1-9-028 LA
P1:9-029 (t-ep2s)
° MỖI NÓI - SPLICE 5l Nố CHÍ TIẾT "
L tịpa9 (148) / ĐETAIL 'D* [C1029 BỘ TRÍ ÔNG THỨ SIÊU ÂM CHI TIET "F" - DETAIL "F"
STEEL SONIC TEST PIPES _ 9
(4:25) SÔNG 1E FIPE T2013 HÀN
150 | — 359 il 360 | 150 Bi1380035
1000
x SONIC TEST PIPE
CHI TIET “E" - DETAIL "E" SONIC TEST PIPE ONG StEU AM @
(1:20) COT CH @ ONG SIÊU ÂM D113.5/103.5
ds À ANANBR ¿ D89.9/51.9
oe er Et
| 4200 | 1200 ị 180 I 450 if 450 450 CHỊ TIẾT "F"
CHỈ TIẾT "E* 1200 DETAIL "E"
P1-D25 sẽ a
a “ ˆ
aa CHI TIET COC NGI BULONG - BOLT
a ee aa DETAIL OF JOIN D16,L=237
\ ik fi fi i h fi ñ hñ ñ h ñ | (1:10) 8-8 (tt)
2 † + † t t † t t Ủ ĩ ĩ 7 an
| [11t \ v1 (I1! ! 0} BAN THEP-STEEL PLATE ¿80 _„ 44
1 i + : + + t 7 j 7 7 8 80X104X14 30,30) T MATERIAL QUANTITY TABLE FOR C.LP PILE D=1.0M
y Vy yf 1 u Vy ị Y | cee = $ Bị BẰNG KHÔI LƯỢNG VẬT LIỆU CỌC KHOAN NHỐI D= 10M
g & ? 3 al S| | Hangmuc | Kýhiệu | Đơnvi Số thanh Chiểu dài Tổng chiều dài | KLđơnvi KƯi cọc KLH trụ
| 4000 | 400 | 1000 | & aI | y tem Sign Diameter No of bar Length Total of Length Unit Weight Weight/1 pile | Weight/1 pier
, r ' BU LONG - BOLT CỐT CHỦ 69 mm m kgim kg kg
Di6,L=237 MAIN BAR KHOETLO O18 P1 D2 49 11700 573.30 3873 2277.72 9110.88
CHI TIET BAU COC e pate, PaADIS a.n22-2081 8022.2851 P1B D25 4 9602 3841 3.973 152,59 610.36
DETAIL OF PILE HEAD ÿ P5-D13 THÉP LÒ XO T = P2 D25 9 10500 94,50 3.973 375.45 1501.80
SS J =e SEIRALETEEL ° P3 D16 1 482893 482.89 4.552 749,45 2997.80
- , oY peeps J se " oe 880 880 23 P3A D16 1 30277 30.28 1.552 46.99 187.96
° 724 8 $ Qa Gey sẽ P4 D22 16 2931 46.90 3.042 142.88 570.72
TỊ 8 Y es P§ D13 42 624 26.21 0.995 26.08 104.32
én
4 | | 28 PS" D13 6 724 4.34 0.995 432 17.28
P3A.Di6 | to | 430 | 150 | | 189 | 130 | 150 | 180 | 72 | 150 | P6 Dié 1 211 221 1,552 3.43 13.72
aN CA 2 Pein Tz D13 16 500 8.00 0.995 7.96 31.84
SUỐT CHIEU DAI 72013-2500
DAY BE WELD FULL LENGTH P7A-4-D22 L=500 ^ P8-D16:2211, PB*-D16-3882 Total 3969.40 15877.60
BOTTOM OF BOTH SIDES, 3408 660 — Reinffor |_P7A D22 3408 13.63 3.042 41.47 165.88
8 PILE CAP tự Or 840 construction P8 D22 2931 5.86 3,042- 17.84 71.36
ớz 2 ¬ 300 = cà txe | sa | +aa- cà ca nn (ES _| Thép thi eéng | Fetal : 5931 | 237.24
P3-D16 CS C®) Mi D89.9/61.0 3 41761 1253 m 501.13
+ M2 | D1148/1035 1 40961 410 m 163.84
ONG VACHS GHI CHỦ : CHỦ : NOTES: Sonic test pipe Cap of sonic M1/ Nap éng sonic M1 each 4 16.00
4- CHIEU DAI LONG THEP THI CONG CO THỂ THAY ĐỔI THEO ĐIỂU KIỆN 4- LENGTH OF REINFORCING CAGE FOR CONSTRUCTION CAN Ong siéu am Cap of sonic M2/ Nap éng sonic M2 each 2 8.00
THUC TE CUA CONG TRUONG CHANGED IN DEPENDING ON REAL CONDITIONS OF CONSTRUCTION Connector sanle M1, L=0.1nv Boan néi éng sonic Mi, L=0.im each 12 48.00
Lj “| 2- ONG SIEU AM BAT SAN PHẢI CÔ CƯỜNG BỘ CHỊU ÁP LỰC NGOÀI NHỎ NHẤT LÀ 8KG/CMZ _ 2- SONIC TEST PIPES HAVE MINIMUM EXTERNAL PRESSURE 8KG/CM2 AND WATER SEAL _Connector sonic M2, L=0.tm/ Doan ndi Sng sonic M2, each § 24.00
CÁC ỐNG PHẢI ĐƯỢC HÀN KỈN KHÍT, KHÔNG THẤM NƯỚC AND FULL OF WATER DURING GONSTRUCTION OF PILE Sonic test pipe infil motar Vita EA lòng ống thử siêu âm m3 0,52 2.08
200 700 200 | TRUOC KHIDG BE TONG CAN Bd BAY NUGC VÀO CÁC ỐNG SIÊU ÂM 3- DURING CONCRETING BORED PILES, REINFORCEMENT CAGE OF PILES el Setibs Bt 324,00
3-LONG COT THEP PHAI UGC TREO TRONG SUGT QUA TRINH THI CONG MUST BE HANG AND TIP OF REINFORCEMENT CAGE SHALL NOT CONTACT WITH Concrete C30 Form bottom of pile cap to pile tip Tir mit coc dén day be m 30.51 122.04
4100 MOI CUA LỒNG THÉP KHÔNG ĐƯỢC TIẾP XÚC VỚI ĐẤT Ở VỊ TRÍ ĐẦY LỖ KHOAN SOIL OF BOTTOM OF BORE HOLE Bề tông C30 150mm in pfe cap Phần 150mm ngập trong bệ m3 0.12 0.48
4- THANH P3A ĐƯỢC THỊ CÔNG SAU KHI ĐẬP BÊ TÔNG ĐẦU CỌC 4- BẠR P3A SET AFTER BREAK CONCRETE TOP PiLE Break 1000mm concrate/ 1000mm bê tông được đập bỏ m3 0,79 3.16
MINISTRY OF TRANSPORT HANOI CITY RING ROAD NO.3 CONSTRUCTION PROJECT ae CC te obvess Sen we pata oe SAMWHAN - CIENCOS JOINT OPERATION PROJECT MANAGEMENT UNIT THANG LONG PACKAGE 1: MAI DICH - TRUNG HOA LAKE SECTION (KM 19620-KM23+195) BO TRI COT THEP COC KHOAN NHQI- TRU THAP (3/3) wv | Swecewo-cxLp.co4-zor1 | sasmmenen _|NSUYENDANG HOANG VZ An
BỘ GIAO THÔNG VẬN TẢI DỰ ÁN XÂY DỰNG VÀNH ĐẠI 3 THÀNH PHỐ HÀ NỘI REINFORCEMENT DE ° AS SHO h CHECKED BY_ Ì'gUyeNTRỤNG THANH 1 A LIÊN DANH SAMWHAN - CIENGO4
BẠN QUẦN LÝ DỰ ÁN THĂNG LONG GO! THAU 1: DOAN MAI DICH - TRUNG HOA (KM 19+620-KM23+195) ENT DETAIL OF BORED -PIER THAPI(33]_XEM HINH VE APPROVED BY | HgaNGHUUSON papain