0 2022 04 25 V K Hoan T D Thinh T N Khoa Rev Date Prepared Checked Approved Rev Page No 0 18 Pages Document No VA2 OM ITP ME ES 01 Project VUNG ANG II THERMAL POWER PLANT PROJECT Title INSPECTION AND TEST PLAN FOR ELECTRICAL SYSTEM PACIFIC CORPORATION JSC Subcontractor HOP LUC CONSTRUCTION JOINT STOCK COMPANY Details of Revision Owner VUNG ANG II THERMAL POWER LLC Owner’s Engineer TOKYO ELECTRIC POWER SERVICES CO , LTD EPC Contractor For issue FOR APPROVAL TITLE Sub Contractor HCA Contractor Own.

Trang 1

0 2022.04.25 V.K.Hoan T.D.Thinh T.N.Khoa

Document No

VA2-OM-ITP-ME-ES-01

Project

VUNG ANG II THERMAL POWER PLANT PROJECT Title

INSPECTION AND TEST PLAN FOR ELECTRICAL SYSTEM

PACIFIC CORPORATION JSC

Subcontractor

HOP LUC CONSTRUCTION JOINT STOCK COMPANY

Details of Revision Owner

VUNG ANG II THERMAL POWER LLC

Owner’s Engineer

TOKYO ELECTRIC POWER SERVICES CO., LTD

EPC Contractor

For issue FOR APPROVAL

Trang 2

TITLE:

Sub-Contractor

HCA Contractor

Owner/

Owner's Engineer

1

2

3

4

5

6

7

8

Remark ITEM NO Description of Inspection/Test Reference

(Code/Spec/Pro) ACCEPTANCE CRITERIA

Equipment/ Materrial Inspection

Filled-out the Check List

Electrical underground conduit installation

RECORD FORM ELECTRICAL SYSTEM

Basic inspection

INSPECTION AND TEST PLAN FOR ELECTRICAL SYSTEM

Filled-out the Check List

Filled-out the Check List

Cable ladder and tray installation

Electrical conduit installation

Inspection & Test Activities

Power cable installation

Filled-out the Check List

Electrical equipment installation

Filled-out the Check List

Electrical panel installation

Filled-out the Check List

Transformer installation

Trang 3

Sub-Contractor

HCA Contractor

Owner/

Owner's Engineer

Remark ITEM NO Description of Inspection/Test Reference

(Code/Spec/Pro) ACCEPTANCE CRITERIA

RECORD FORM

Inspection & Test Activities

9

10

11

12

13

14

15

Abbreviation P: Performance R: Report Review W: Witness Inspection S: Surveillance

Generator installation

Filled-out the Check List

Medium voltage concrete poles installation

Filled-out the Check List

Earthing system installation

Filled-out the Check List

Lightning protection system installation

Filled-out the Check List

Medium voltage equipment installation

Filled-out the Check List

Medium voltage cable installation

Filled-out the Check List

Filled-out the Check List

H: Hold Inspection

Testing and Commissioning medium voltage system

and transformer station

Trang 4

C/O C/Q

Sub-Contractor

Position

Signature

Conclusion:

Owner/ Owner's Engineer HCA Contractor

ELECTRICAL SYSTEM Finish Time:

REMARK DESCRIPTION

Start Time:

ACC/REJ Quantity

Form No : QC - ES - 01

Code: VA2-OM-ES-IR-01-xxxx

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

ITEM TITLE

Packing number

Certification

No MATERIAL

Date:

Comments, if any:

Trang 5

Yes No

1

2

3

4

5

6

7

8

9

10

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

VUNG ANG II THERMAL POWER PLANT

PROJECT

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

WORK TITLE

ITEM TITLE

Comments, if any:

Conclusion:

Position

Signature

Full Name

ELECTRICAL SYSTEM

Date:

Acceptance

AREA / LOCATION:

REF SPEC./DWG NO.:

ELECTRICAL CONDUIT INSTALLATION TEST RECORD

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

Finish Time:

Form No : QC - ES - 02 Code: VA2-OM-ES-IR-02-xxxx

Start Time:

ITEMS

Check material before installation

In accordance to the material catalogue approved

Make / Check of materials

Check position junction box to approved drawing

Connection/Joint

Other Spec if any

Installation

Physical check for damages

Check conduit internally if clean and free from dust and foreign object

In accordance to the approved drawing

Check conduit dimension approved shop drawing

Check position support accordance to approved drawing

Trang 6

Yes No

1

2

3

4

5

6

7

8

9

10

11

Signature

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Position

INSTALLATION TEST RECORD

Form No : QC - ES - 03 Code: VA2-OM-ES-IR-03-xxxx

Comments, if any:

Finish Time:

Check conduit via/sweep bend/ seal of conduit-end

Check brick and warning tape cable

Other Spec if any

Check sand embeding layer and back filling and compacting

Check Cable pit: location, dimension, cover as approved drawing, clearning

Check routine of excavation

Date:

Check basing sand layer

Installation

Check material before installation

In accordance to the material catalogue approved/

In accordance to the approved drawing

Check conduit dimension approved shop drawing

Make / Check of materials

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

AREA / LOCATION:

REF SPEC./DWG NO.:

Start Time:

Trang 7

Yes No

1

2

3

4

5

6

7

8

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

INSPECTION ITEM

TEST RECORD

Form No: QC - ES - 04 Code: VA2-OM-ES-IR-04-xxxx

VUNG ANG II THERMAL POWER PLANT

PROJECT

Check hanger & support, saddle & clip interval

Check material before installation

Date:

Start Time:

Finish Time:

AREA / LOCATION:

REF SPEC./DWG NO.:

Spacing with other equipment or services

Check grounded with grounding system

Other Spec if any

Comments, if any:

In accordance to the material catalogue approved

Make / Check of materials

Installation

In accordance to the approved drawing

Check location, level, alignment

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Remarks

Full Name

Position

Signature

Trang 8

Yes No

1

2

3

4

5

6

7

8

9

10

Code: VA2-OM-ES-IR-05-xxxx

REF SPEC./DWG NO.:

Physical check for damages

In accordance to the approved drawing

Date:

Start Time:

Finish Time:

AREA / LOCATION:

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

Form No: QC - ES - 05

Check material before installation

Sub-Contractor

Cable test record

Acceptance

Remarks

Check Cable Termination is fixed firmly and high quality

In accordance to the material catalogue approved

Make / Check of materials

Installation/Lắp đặt

Check label/ marking at each cable end/

Other Spec if any

In accordance to the approved method statement

Check cover of junction box, all connection joint, support of conduit and cable ladder,

cable tray after cable installing

Conclusion:

Owner/ Owner's Engineer HCA Contractor

Position

Testing & Commissioning

Signature

Comments, if any:

Trang 9

Yes No

1

2

3

4

5

6

7

8

9

10

11

12

13

Check hanger & support

Check label/ marking at each equipment, if any

Testing & Commissioning

Electrical equipment test record

(as Manufacturer's recommendation)

Other Spec if any

In accordance to the approved drawing

Check type and location Installing

Vertical/ horizontal in alignment

Level Inspection

Spacing with other equipment or services

Check wiring support, including conduit

TEST RECORD

Form No : QC - ES - 06 Code: VA2-OM-ES-IR-06-xxxx

VUNG ANG II THERMAL POWER PLANT

PROJECT

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

Conclusion:

Check material before installation

Physical check for damages

Date:

Start Time:

Finish Time:

Signature

In accordance to the material catalogue approved

Make / Check of materials

Installation

Comments, if any:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Position

AREA / LOCATION:

REF SPEC./DWG NO.:

Trang 10

Yes No

1

2

3

4

5

6

7

8

9

10

Form No : QC - ES - 07 Code: VA2-OM-ES-IR-07-xxxx

Check grounded with grounding system

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

INSTALLATION TEST RECORD

ELECTRICAL SYSTEM

AREA / LOCATION:

Nameplate/ symbol

Testing & Commissioning

Electrical panel test record

(as Manufacturer's recommendation)

In accordance to the approved drawing

Check location, level and vertical/ horizontal Installing

Spacing with other equipment or services

Check hanger, support, bolt&nut

Check and marking of electrical cables (in-out)

Date:

Start Time:

Finish Time:

REF SPEC./DWG NO.:

Check material before installation

In accordance to the material catalogue approved

Make / Check of materials/(No Physical damage to all the components mounted on the

switchboard)

Installation

ITEM TITLE

Comments, if any:

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Position

Signature

Trang 11

Yes No

1

2

3

4

5

6

7

8

9

10

11

Form No : QC - ES - 08

ELECTRICAL SYSTEM

Date:

Start Time:

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

AREA / LOCATION:

REF SPEC./DWG NO.:

Spacing with other equipment or services

Check nameplate/ symbol

Check grounded with grounding system

Code: VA2-OM-ES-IR-08-xxxx

VUNG ANG II THERMAL POWER PLANT

PROJECT

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

In accordance to the material catalogue approved

Make / Check of materials

Installation

ITEM TITLE

Finish Time:

Check material before installation

Technical Specification issued, approved & attached

Check location as per drawing and vertical/ horizontal in alignment

Check support, bolt&nut

Check Ventilation system for Transformer

Owner/ Owner's Engineer HCA Contractor Conclusion:

Position

Signature

Sub-Contractor

Other Spec if any

Testing & Commissioning

Transformer test record/

(as Manufacturer's recommendation and inspected by competent authority)

Comments, if any:

Trang 12

Yes No

1

2

3

4

5

6

7

8

9

10

11

12

13

Remarks

Check nameplate/ symbol

Other Spec if any

Testing & Commissioning

Transformer test record

(as Manufacturer's recommendation)

Check the exhaust pipe

Check battery installation

Installation

Check grounded with grounding system

Check the cooling and ventilation system for Generator

Spacing with other equipment or services

Acceptance

Form No : QC - ES - 09 Code: VA2-OM-ES-IR-09-xxxx

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

Check material before installation

Date:

Start Time:

Finish Time:

AREA / LOCATION:

REF SPEC./DWG NO.:

Conclusion:

Check location as per drawing and vertical/ horizontal in alignment

Check support, bolt&nut

Position

Signature

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

In accordance to the material catalogue approved

Make / Check of materials

Technical Specification issued, approved & attached

Comments, if any:

Trang 13

Yes No

1

2

3

4

5

6

7

Form No : QC - ES - 10

AREA / LOCATION:

REF SPEC./DWG NO.:

Code: VA2-OM-ES-IR-10-xxxx

VUNG ANG II THERMAL POWER PLANT

PROJECT

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

Date:

Start Time:

Finish Time:

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

WORK TITLE EARTHING SYSTEM INSTALLATION TEST RECORD

Comments, if any:

Check earthing resistance

Conclusion:

Other Spec if any

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Position

Signature

Full Name

Check grounding test box: location installing, support, grounding cable…

Check material before installation

In accordance to the material catalogue approved

Make / Check of materials

Installation

Check location installation and depth of earth-bar

Check earth connection between the earth bar and the earth wiring

Trang 14

Yes No

1

2

3

4

5

6

7

8

9

10

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

AREA / LOCATION:

REF SPEC./DWG NO.:

WORK TITLE LIGHTNING PROTECTION SYSTEM INSTALLATION

TEST RECORD

Form No: QC - ES - 11

Check test box: location installing, support, grounding cable…

Comments, if any:

Code: VA2-OM-ES-IR-11-xxxx

Date:

Start Time:

Finish Time:

Check material before installation

In accordance to the material catalogue approved

Make / Check of materials

Installation

Check location installation and depth of earth-bar

Check earth connection between the earth bar and the earth wiring

Check earthing resistance

Other Spec if any

Check types, location, level and vertical installing for Lightning conductor

Check support, bolt&nut

Check Conection the cable from lightning needle to grounding test box and grounding

system

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Position

Signature

Trang 15

Yes No

1

2

3

4

5

6

7

8

9

MEDIUM VOLTAGE CONCRETE POLES INSTALLATION TEST RECORD

Form No : QC - ES - 12

AREA / LOCATION:

REF SPEC./DWG NO.:

Code: VA2-OM-ES-IR-12-xxxx

Check pole foundation installation

Check poles: location, level and vertical/ horizontal installing

Other Spec if any

Full Name

Comments, if any:

Conclusion:

Position

Signature

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Check grounded with grounding system

In accordance to the material catalogue approved

Make / Check of materials

Installation

Physical check for damages

In accordance to the approved drawing

In accordance to the approved method statement

VUNG ANG II THERMAL POWER PLANT

PROJECT

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

Check material before installation

Date:

Start Time:

Finish Time:

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

WORK TITLE

Trang 16

Yes No

1

2

3

3

4

5

6

7

8

9

10

11

HCA Contractor Sub-Contractor

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

AREA / LOCATION:

REF SPEC./DWG NO.:

ITEMS

Position

Signature

Electrical equipment test record

(as Manufacturer's recommendation)

Testing & Commissioning

Comments, if any:

Conclusion:

Owner/ Owner's Engineer

Make / Check of materials

Installation

Physical check for damages

In accordance to the approved drawing

In accordance to the approved method statement

Technical Specification issued, approved & attached

Acceptance

Remarks

TEST RECORD (Recloser, Disconect Switch, Insulator…)

Form No: QC - ES - 13 Code: VA2-OM-ES-IR-13-xxxx

Check types, location, level and vertical/ horizontal installing

Check material before installation

In accordance to the material catalogue approved

Date:

Start Time:

Check hanger & support

Check label/ marking at each equipment, if any

Other Spec if any

Check grounded with grounding system

Finish Time:

INSPECTION ITEM

Trang 17

Yes No

1

2

3

4

5

6

7

8

9

10

11

12

VUNG ANG II THERMAL POWER PLANT

PROJECT

ITP No: VA2-OM-ITP-ME-ES-01 Rev.0

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

AREA / LOCATION:

REF SPEC./DWG NO.:

RECORD

Position

Signature

Comments, if any:

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

ELECTRICAL SYSTEM

Date:

Start Time:

Finish Time:

Remarks

Check Cable Termination is fixed firmly and high quality

Check label/ marking at each cable end

Make / Check of materials

Installation

Form No : QC - ES - 14 Code: VA2-OM-ES-IR-14-xxxx

ITEM TITLE

Other Spec if any

Check material before installation

In accordance to the material catalogue approved

Testing & Commissioning

Cable test record

(as Manufacturer's recommendation and inspected by competent authority)

Check cable type, length

Check underground medium voltage cable: conduit, cable type, Electrical insullation layer,

cable head…

Physical check for damages

In accordance to the approved drawing

In accordance to the approved method statement

Check pulling cable from one pole to other

Trang 18

Yes No

1

2

3

4

5

6

ELECTRICAL SYSTEM

Date:

AREA / LOCATION:

REF SPEC./DWG NO.:

Full Name

Position

Signature

Comments, if any:

Conclusion:

Owner/ Owner's Engineer HCA Contractor Sub-Contractor

Connecting the medium voltage system and transformer station in Nation Electrical Grid

(by competent authority)

Inspection record for installing

As-built drawing

Inspection record by competent authority (EVN)

Testing & Commissioning

Testing record of required materials

Documents for Connection permission of authority

Start Time:

Finish Time:

VOLTAGE SYSTEM AND TRANSFORMER STATION

Form No : QC - ES - 15 Code: VA2-OM-ES-IR-15-xxxx

HCA Contractor: PACIFIC CORPORATION JOIN STOCK COMPANY

ITEM TITLE