... Trang 2Project Planning and ControlAnalysis and float calculation (see Chapter 15) is identical to the methodsemployed for arrow diagrams and, if the box is large enough, the earliest andlatest ... Column, 4 days’ and ‘Cast Beam, 2 days’and it were necessary to insert ‘Strike Formwork, 2 days’ between the two activities, the planner Trang 9FigurTrang 10Project Planning and Controlwould ... to calculate the overall projectduration, i.e 30 + 3 = 33, and the difference between the highest and the other number immediately gives the float of the other activity and all the activities 98
Ngày tải lên: 26/01/2014, 11:20
... beenproduced and marketed All these programs have the ability to analysenetworks and produce the standard output of early and late start and the threemain types of float, i.e total, free and independent ... original network H and J (shave and boilwater) are in parallel H takes four minutes and J takes two We therefore havetwo minutes float on activity J in relation to H To get the total project duration ... check-out, designing andmanufacturing new hardware and writing new software for the existingcomputer, which will be retained check-The main activities and durations (all in days) for this project are
Ngày tải lên: 26/01/2014, 11:20
Tài liệu Project Planning and Control Part 5 ppt
... loading and the quarry crushing and screening. A typical system network is shown in Figure 21.4. 167 Figure 21.2 Trades and disciplines Figure 21.3 Geographical proximity Project Planning and Control Advantages: (a) ... networks, a project manager should be able to read them as a musician reads music. He should feel the slow 173 Project Planning and Control movements and the crescendos of activities and combine ... on earliest and latest starting and finishing times and on the various types of float. As is so often the case, network analysis and computerization are regarded as being synonymous, and the drawbacks
Ngày tải lên: 26/01/2014, 11:20
Tài liệu Project Planning and Control Part 6 docx
... offendingactivities 1 and 2 and rewriting them if necessary For example, if it is foundthat activities 1 and 2 required rework to such an extent that the original workwas completely wasted (or dismantled) and ... andsupports (Figure 27.1) could be split into the activities shown in Figure 27.2and 27.3 Figure 27.1 Trang 184 Erect duct A Erect duct B He may be conservative and report 40% or optimistic and ... blocks, profiled steel roof and side cladding, and areinforced-concrete ground slab It has been assumed that as an area of site hasbeen cleared, excavation work can start, and the sequences of each
Ngày tải lên: 26/01/2014, 11:20
Tài liệu Project Planning and Control Part 7 pptx
... engineering and building nature and theother is concerned with mechanical erection –both are practical and could be applied to realsituations meth-The first example covers the planning, hour control and ... labour costs and material and plant costs on a weekly basis (Table 28.7) The last column in the table shows the totalmaterial and plant cost for every activity, because all the materials and plantfor ... of resources – men and materials and plant – each activity is representedby two lines The top line represents the labour cost in £100 units and thelower line the material and plant cost in £100
Ngày tải lên: 26/01/2014, 11:20
Tài liệu Project Planning and Control Part 8 pptx
... ontothe Windows operating environment to provide ahighly interactive, yet flexible and powerfulmanagement tool Hornet Windmill may be used in both the single-project and multi-projectenvironments, and ... or existing plant DCF of returns, NPV, Cash flow 3 Project and product life cycle 307 Figure 29.18 Trang 20Project Planning and Control4 Work and product breakdown structure Design, Prototype, ... are shown in Tables 29.6 and 29.7 and the graphs inFigures 29.4 and 29.5 for option 1 and option 2, respectively An additionaloption 2a in which the income in years 2 and 3 is reduced from £65
Ngày tải lên: 26/01/2014, 11:20
Tài liệu Hướng dẫn tùy biến Internet Explorer 9 trên Windows docx
... Trang 1Hướng dẫn tùy biến Internet Explorer 9 trên Windows Trang 2Internet Explorer đã từng là trình duyệt phổ dụng nhất trước khi Firefox và Chrome xuất ... tính năng phù hợp nhu cầu sử dụng của người dùng Hãy cùng xem một số tính năng rất hữu ích trên Explorer 9 và cách chúng có thể giúp cải thiện trải nghiệm người dùng Ghim các website xuống thanh
Ngày tải lên: 17/02/2014, 13:20
Tài liệu An Introduction to Project, Program, and Portfolio Management doc
... success. Project managers work with the project sponsors, the project team, and the other people involved in a project to define, communicate, and meet project goals. Project Constraints Every project ... develop and use tools, especially for managing important projects Project management tools and techniques assist project managers and their... understanding change, and understanding ... Explain what a project is, provide examples of projects, list various attributes of projects, and describe project constraints Describe project management and discuss key elements of the project management framework,
Ngày tải lên: 18/02/2014, 11:20
Tài liệu Negotiations in project sales and delivery process: An application of negotiation analysis pdf
... analysis and project marketing Through these two areas, this report paves the way towards our understanding of negotiation in project networks, with chains of contractors’ delivery projects and clients’ ... procurement-contained projects, constituting altogether a whole network of companies and their projects Trang 5Abstract Project sales and delivery processes entail complex negotiations between client and contractor, ... an understanding of the concept of negotiation and reviews the negotiation analysis approach Second, the project sales and delivery process and its distinctive features are reviewed and their
Ngày tải lên: 18/02/2014, 11:20
nstalling and Configuring Windows Server 2012 pot
... to Windows Server 2012? A Windows Server 2003 Standard to Windows Server 2012 Standard B Windows Server 2008 Standard to Windows Server 2012 Standard C Windows Server 2008 R2 32-bit to Windows ... interface These elements include Internet Explorer and the components that make up the Windows shell, including the desktop, Windows Explorer, and the Windows 8 desktop apps Also omitted are the ... disable the Server Graphical Shell feature in Windows Server 2012, to prevent Internet Explorer, Windows Explorer, and the desktop shell from running, and you want to remove the files that provide
Ngày tải lên: 06/03/2014, 16:20
Agile Project Management and the Real World doc
... building software by empowering and trusting people, acknowledging change as norm, and promoting constant...What‟s the same? • A project is still a project: – Vision – Life cycle – Requirements ... from Highsmith, James (2010) Agile project management: creating innovative products Envision • Initiate project • Develop project vision, objectives, and constraints • Create a core... ... Explore • Design, build, and test project • Iteration planning – Commit to user stories for iteration – Create and estimate technical tasks • Monitor progress – Daily stand-ups – Visual taskboard
Ngày tải lên: 07/03/2014, 02:20
The New Project Design and Management Workshop Training Manual pot
... analysis and selection of a cause that they can reasonably work on. • Realistic and achievable project goals. • Realistic and concrete project objectives. • Clearly defined project tasks and responsibilities ... Evaluation, based on indicators set beforehand, of each project phase and the entire project after it is finished. • Logical and effective structure of project design and management. • Qualified persons ... and focus Lunch • Project Design: Part 2— Goals and Objectives, Signs of Success, Feasibility Test • Action Plan: Identifying and Sequencing Tasks • Project Design: Part 1—Vision, Assets, and
Ngày tải lên: 07/03/2014, 02:20
RCUK Policy and Code of Conduct on the Governance of Good Research Conduct pptx
... design and frameworks, to ensure that findings are robust and defensible Researchers should also adhere to the highest level of research ethics, in line with requirements set out by national and ... professional and regulator y research guidance and research ethics frameworks issued in appropriate areas The onus should lie with the researcher to establish that s/he has always met the highest standards ... data, laborator y notebooks and other relevant materials; • stewardship responsibilities for heads of laboratories and depar tments, so that they actively promote and repor t on activities which
Ngày tải lên: 24/03/2014, 02:20
PROJECT SUMMARY and ENVIRONMENTAL ISSUES For Visy Pulp and Paper, Tumut Mill Expansion pptx
... 80t/hr Multi-fuel Power Boiler fuelled by standard fuel and non standard fuels such as urban wood residues and paper machine residues from Visy Tumut, Sydney and Melbourne Mills Emissions stack ... fibre and 20% wastepaper and install additional pulp mill capacity This would involve the installation of a new Recovery Boiler, Lime Kiln and Recausticising Plant, Evaporation Plant, and Batch ... virgin fibre and 40% wastepaper This will consist of sawmill residues, softwood pulp logs from State Forests and private plantations, and waste paper from kerbside collections from Sydney and Melbourne
Ngày tải lên: 24/03/2014, 05:20
Báo cáo khoa học nông nghiệp " Milestone 9 Project Validation and Impact Assessment Report - Part 1 " potx
... Thap and Can Tho), b) “Northern Central Provinces” comprising two provinces from Northern Central Vietnam: (Ha Tinh and Nghe An) and 2 provinces that are south of Hanoi (Hoa Binh and Ha Tay) and ... monitoring of two groups of farmers FFS group and non-FFS group in two northern provinces (Nghe An and Ha Tay) and two provinces from Mekong delta (Tien Giang and Can Tho) Continuous monitoring was ... assessment of project 037/06 VIE was developed in 2007 at the project management team (Mr Ngo Tien Dung, Mr Ho Van Chien, Mr L Q Quong and Oleg Nicetic) meeting in My Tho on 31/05/2007 and workshops
Ngày tải lên: 21/06/2014, 05:20
Milestone 4: Identification of suitable high priority project interventions and selected smallholders for training and demonstration units and estimation of potential physical and financial impacts " doc
... high priority project interventions and selected smallholders for training and demonstration units and estimation of potential physical and financial impacts 1) High priority project interventions ... slots and some have a long dung slot covered the width of the pen These openings allow cold draughts to enter the shed from outside, and this creates poor dunging patterns and reduces hygiene and ... 8• Vaccination and treatment schedules in place and NIVR E coli vaccine in use Figure 12 The NIVR E coli vaccine (Developed in CARD project 001/04VIE) currently in use in the project Two injections
Ngày tải lên: 21/06/2014, 06:20
Báo cáo hóa học: "Research Article Differentially Encoded LDPC Codes—Part II: General Case and Code Optimization" potx
... outer code of the PA code and the differential decoder match quite well, but a conventional LDPC code, regular or irregular, will either intersect with the differential decoder, causing decoder ... LDPC codes, the outer code of PA codes, differential decoder and the direct detector of Rayleigh channels Normalized Doppler rate 0.01, E b /N0 = 5.32 dB, code rate 3/4, (3, 12)-regular LDPC code, ... PA code with 2% of pilot symbols, (iii) BPSK-coded irregular LDPC code with 4% of pilot symbols, (iv) BPSK-coded regular LDPC code with 4% of pilot symbols, (v) BPSK-coded irregular LDPC code
Ngày tải lên: 21/06/2014, 22:20
Configuring, Managing and Maintaining Windows Server 2008 Servers pot
... Configuring and Troubleshooting a Windows Server® 2008 Network Infrastructure Course 6419A: Configuring, Managing and Maintaining Windows Server® 2008 Servers Course 6419A: Configuring, Managing and ... of Network Content and Resources • Module 14: Monitoring and Maintaining Windows Server 2008 Servers • Module 15: Managing Windows Server 2008 Backup and Restore... Member ... Configuring Windows Server® 2008 Active Directory® Domain Services Course 6425A: Configuring Windows Server® 2008 Active Directory® Domain Services Course 6421A: Configuring and Troubleshooting a Windows
Ngày tải lên: 29/06/2014, 00:20
Bạn có muốn tìm thêm với từ khóa: