The Project The project involves end to end control systems integration for over 300 water & waste water treatment plants of one of the large utilities company in England.. The statistic

Trang 1

CASE STUDY

The Achievement

Over 200 person years of effort in less than 3 years emphasizing extremely high resource ramp-up capability at onsite and offshore

The Project

The project involves end to end control systems integration for over 300 water & waste water treatment plants of one of the large utilities company

in England It covers design, development and implementation of control systems to cater to the redefi ned process requirements as mandated by the regulatory authorities

Project Genesis

The Asset Management Programs, having an execution period of 5 years, are one of the most complex programs in terms its scale of operation in Water Industry The statistics for this project are:

● Work involves a large number of water treatment works, wastewater treatment works and UIDs

● Plants spread across large geographical area England

● Multiple Kit Framework suppliers responsible for supply of various components of the systems

● Client working along with Engineering Service Providers, Design & Build Contractors to manage and deliver the whole capital expenditure program

Project Technologies

TCS has used following tools and technologies for this project

● PLC platforms: Siemens S5 and S7, Rockwell PLC 5, Siemens TI, ABB Sattcons, Alstom PLCs, Texas PLCs, etc

● Human Machine Interfaces based on Siemens and Rockwell interfaces

● SCADA: WinCC, RsView, AFE SCADA, Intellution, etc

Project Implementation Methodology

TCS has used onsite-offshore delivery methodology based on Global Engineering principles for carrying out this project achieving huge cost benefi ts for the client

Offshore activities:

● Design

● Logic development

● Graphics development

● As built documentation Onsite activities

● Optioneering and Site requirements analysis

● Factory Acceptance Test assistance

● Site Acceptance Test assistance

● Commissioning assistance

● Training

ENGINEERING AND INDUSTRIAL SERVICES

Control System Integration for Water

Treatment Plants for a Utilities Major

About Plant Automation

Services Practice

TCS provides vendor neutral services which

leverage domain, technology and software

expertise in the areas of Manufacturing

Execution Systems, Control Systems

Integration and Process Optimization,

enabling clients to reduce the global system

deployment time, integrate business and

plant systems in real time, and achieve

higher levels of process effi ciencies

About EIS Business Unit

Engineering and Industrial Services (EIS)

is one of TCS’s strategic businesses that

provides single window solutions globally

to help clients realize effi ciencies in

innovation, operations and capital and

asset management strategies, using

best-in-class technologies, processes and

competencies

Trang 2

Scope of work

For each of the over 300 projects, TCS is carrying out the following activities:

1 Reviewing the design statement prepared by the consultant/ contractor

2 Plant visit to gather site conditions and information about legacy system

3 Design the new control architecture and prepare a Bill of Materials (BOM) on the basis of which the automation hardware will be purchased

4 Understanding the design statement and preparing a detailed Functional design Specifi cation (FDS) for the PLC software being written

5 PLC logic and graphics development and test procedures documentation

6 Pre-FAT in India, using PLC Simulators

7 Site activities at UK like FAT, SAT and commissioning, training

Staffi ng

● A fi xed size onsite ‘Core’ team stationed in the UK for the entire duration of the project

● A fi xed size offshore ‘Core’ team based in TCS, India, for carrying out Project Management activities

● A variable size onsite ‘Implementation’ team that would be ramped up and down as the number of projects (plants taken

up for upgradation) vary

● A variable size offshore ‘Implementation’ team that would be ramped up and down as the number of projects (plants taken up for upgradation) varies

Challenges

● The job required highly competent people at various levels ranging from Program Managers and Engineering Managers through Team Leads, PLC Programmers, and Technical Assistants

● Since the volume of work would be fl uctuating over the period of execution, it was required to have a team that can be ramped up and down based on demand

● Cost and time were major constraints, and had to be done to top quality standards Any compromise on quality had severe legal implications due to our client being part of the regulated industry

● Presence of large variety of legacy systems

● Interface with a large team of organizations related to Engineering design, civil and M&E contracts and host of other product and service providers

Benefi ts

● Standardization leading to higher Re-use

● Highly structured Documentation

● Knowledge base (IP) for future

● Information infrastructure for an integrated enterprise

CASE STUDY

About TCS

Tata Consultancy Services (TCS) is among

the leading global information technology

consulting, services, business process

outsourcing and engineering services

organizations Pioneer of the fl exible

global delivery model, TCS focuses on

delivering cutting edge technology led

business solutions to customers across

varied industries

For More Details, Contact:

Engineering and Industrial Services

Business Unit

Tata Consultancy Services Limited

11th Floor, Air India Building

Nariman Point

Mumbai 400021

Phone: +91-22-5550 9999

Fax: +91-22-5550 9455

www.eis.tcs.com

corporate.engineering@tcs.com

ENGINEERING AND INDUSTRIAL SERVICES

Control System Integration for Water

Treatment Plants for a Utilities Major

Ngày đăng: 17/09/2020, 16:19

TỪ KHÓA LIÊN QUAN