Trang 2Definition of Root Cause Analysis (RCA)
[— _ *~—————————————————————————————————————————————————————————
Root Cause Analysis (RCA) is a structured
process that uncovers the physical, human,
and latent causes of any undesirable
event in the workplace
Can be:
«Single or multidiscipline cases e«Small or large cases
MANAGING RISK '>' ÿ2
Trang 3
Failure Cause —
The physical or chemical
processes, design defects,
quality defects, part
misapplication, or other
processes that are the basic
reason for failure or that initiate
the physical process by which
Some other definitions
Failure Effect — The consequence(s) a failure mode has on the
operation, function, or status of an item
deterioration proceeds to failure
The circumstances during
design, manufacture, or
operation that have led to a
failure
Failure — The termination
of its ability to perform a required function
Failure Mode — The effect
by which a failure is observed on the failed item
Eo
MANAGING RISK !>`.)0/
Trang 4Root Cause (RCA)
@ Eliminates early life failures
@ Extends equipment lifetime
Q Minimizes maintenance
Slide 4 Edit in Veiw > Header and footer Edit in Vetw > Header and footer MANAGING RISK DINW
Trang 6[— _ *~———————————————————————————————————————————————I
A Root Cause Analysis will disclose:
@ Why the incident, failure or breakdown occurred
@ How future failures can be eliminated by:
changes to procedures changes to operation training of staff
design modifications verification that new or rebuilt equipment is free of defects which may shorten life
- repair and reinstallation is performed to acceptance standards
- identification of any factors adversely affecting service life and
implementation of mitigating actions
MANAGING RISK !>`.`š2
Trang 7
Production Improved availability “up-time”
and increased production
Reactive Periodic Predictive Proactive Era of
maintenance/ Maintenance maintenance
monitoring
MANAGING RISK !>`.)0/
Trang 8
Reactive maintenance
¢ Run the equipment until breakdown
¢ Overhaul and repair
¢ Extensive unplanned downtime and recurrent repair
DNV
MANAGING RISK '>' ÿ2
Trang 10DNV
MANAGING RISK !>`.`š2
Trang 11[— _ *~———————————————————————————————————————————————I
Short and long-term benefits of
Proactive Maintenance Strategies
Trang 12Experience and statistical data
MMS DATABASE
@ Information on equipment design and service conditions
@ Failure statistics 1.e MTBF
@ Description of service failures, approach and methods
for failure investigation
Trang 13[— _ *~———————————————————————————————————————————————I
Methods and analytical tools to identify the causes of failure or breakdown
@ Review background data
@ Loss Causation Model and RCA methods and working process
Detailed analyses of failed parts/components:
@ Analyse service conditions
@ Utilise experience data from data bases or other sources
@ Laboratory investigation
DNV
MANAGING RISK !>`.)0/
Trang 14The Loss Causation Model
© Det Norske Veritas
The main causes
Trang 17Investigation techniques
¢ A number of named techniques that are
commonly used within RCA:
¢ The techniques have strength and weaknesses
depending on the situation
MANAGING RISK !>`.)0/
Trang 18Methods for RCA; Content
¢ Pata Collection
— Interviews
— Paper and technical evidence
¢ Methods for RCA
— STEP
— FMEA
— FTA
MANAGING RISK !>`.)0/
Trang 19STEP 1: Register Equipment Incidents
Purpose : Register Off-spec Operation / performance, Survey & Condition Monitoring data Start: Trigged by off-spec operation/performance,
Stop: Incident logged in Maximo
Process Off-spec operation /
performance :
and Recommended Maintenance Action
MANAGING RISK
Resources
Trang 20
STEP 2: Trigger Mechanism for RCA
Start: Registered HSE issues or off-spec operation/ performance incidents
Trigger mechanism for RCA lo sec
IN Incidents above trigger level
performance: with high Z incidents with production
failures
Trios repair cost Off-spec operation vis-a-
Abnormalities ( vis (KPI) KR Recommended
RCA Case
Multiple operating
Do Preliminary r incidents per Tag no./
Cost vs Investment (Replacement) L High risk findings from
survey/CM
Surveys, Audits,
Inspection, Reviews
Plant Reliability Engineer HQ Senior Reliability Engineer MANAGING RISK
Senior Planning Engineer Reliability Engineer (Plant/HQ)
Resources
Trang 21STEP 3: Appoint the RCA Team
— Leader — appointed by the Plant manager
— Facilitator — reliability engineer
— Discipline(s) or specialists at specific plant
¢ Optional to involve:
— Disciplines from other sister plants
— HQ-Engineering support and technical staff
Trang 22STEP 4: The Root Cause Analysis
4) RCA method steps
Trang 23The main RCA report
1 Description of the Incident(s)
An incident is the event that precedes the loss or potential loss This section should include a description of what happened
Include all aspects related to the incidents, like outage time, cost of repair, people involved, tools in use, operational status, weather conditions etc
4 Lack of Control Lack of Control means insufficient oversight of the activities from design to planning and operation Control is achieved through standards and procedures for operation, maintenance and acquisition, and follow-up of these If an oil spill has occurred because of wrong installation of a sealing, the Lack of Control could be related to inadequate procedures for
MANAGING RISK
Trang 24Potential Consequence (1-5) Assets: Production Loss:
CO 2 Working Environment nt CO 11 Operation of equipment outside design
OO 6 Mobilization of equipment CJ 14 Process Control
O 8 Deterioration / Corrosion
Sub Category Sub Category:
basic Cause
(0 2 Inadequate Com petence
OO 3 Motivation
L1] 4 Physical and psychological load during work
Personal Factors(B}
Sub Category
Causes related to the work (8B)
(0 11 Design Failure (or lack of design)
OO 12 Purchasing C1 13 Maintenance C1 14 Ageing / Obsolescence
Sub Category:
Lack of Control (C):
(CO 2 inadequate system standards
OD 4 inadequate Maintenance Procedures
OO 6 inadequate Design Procedures
BASIC WAUSES CO Fiersonal Factors
Trang 25RCA reporting system
[— *~—————————————————————————————————————————————————I
RCA TEMPLATE 5 Gastent A | Substandard condition: = B_ | Personal F actors
CI Pending Defect setae Sbaication or use of the equipment for B11:Laekc£ : TITLE: Root Cause Reporting Form RCA=: = suá tose Al.2: Defect material used in tool and equipment ro s B1.2: Lack of information
Incident Date: 5 ic tr A1.3: Equipment failure during operation Bl ec B1.3: Lack of training for new employee
ngdent Uate ystem/Component/T ag AD asked ve care teves process B1.4: Lack of training related to modification/change in process
Say = conditions A2 Working A2.2: Too little space to do work B1.5: Misunderstanding environment | A 3: Fire and explosion risk in the area B2.1: Lack of basic training Loss: Description of the Incident AD 4 Bad 2 t household Inadequate 2.2: Long period between each time the lnow ledge is
l6 = B2 used required
E a3 [Extemal | 43.1: Failure causad by bad weather conditions B23: Lack of instroction/ Misting instniction
2 aoe a Point (pressure, temperature, B3.1: Lack of feedback (positive negative) for conducted work
B A4 |CSnwol [A42:1aekcfinsromentsien B3 | Motivation [B3.2:Lack of Sadback related toquality when thatis required
— a A4.3: Lack of logic in the ins tument function B3.3: Lack of follow-up during work execution
ae Ce ae A4.4: Defect controller devices B3.4: General frustration of working conditions
Group: Problem Code: ee | T1 TH HH HỖ PPERRDDADES Physical and | B4.1:Stress due to psychological pressure
Failure Class: Cause Code Change of = B4 vcho-
r x š logical load si ce 3 Risk Assessment Matix RAM = ST As eae A6.1: Change in operation conditions not verified dosing work B4.2: High physical demand
Potential Consequence (1-5) ý ” CN ATL Modification of Go
> ah: e not ver aams'
A7 TEEN t | the system (Causes related to the work
AS ay reams can hs naa B10.1:Unel snication lines
Sub-Standard Condition (A): Sub-Standard Acts (A): Ghana, —— B102: Unclear guidance for responsibility
B || G 1 DetectE quipment & Tools CO 10 Maintenance Hy aT a as B103: Unclear goals for execnted work
a O 2 Working Environment O 11 Operation of equipment outside design ——— : =o ee
= [1 3 External //eather boundaries Al0 | Maintenance 10.2: Welding and hot wodk without proper — B104: Lack of instructions, procedures, reference documentation
3 O 5 Production Profile 1 13 Violation of procedures Al0.3: Defect initiated by maintenance or inspection fwork: B105: Lak of identification /foos on possible loses damages
= bản Elis SHERCMnninim men Operation of |A11.1: Operation outside rated capacity B10.7- Unqualified personnel used for the work
- AI a a All.2: Operated outside pressure limits B10.8: Lack of overall goals for the work
œ
Sub Category Sub Category: cai : A11.3: Operation outside temperature Rrrwts B109: Lack of experience Sedback
aries
A121: Operation with defect equip B1l1.1: Missing/not complete design requi and specifi
j Wrong use of | A12.2: Equipment'tools used for a purpose not Design Pate i
Personal Fadors(B} Causes related to the work (B) 33 |xapmer [designed fr sii|SIesœ [BU 2: Taek of operations
` À12.3: Equtpment tools overioadaở during operation = B11 3: Lack of start-up procedures
Š L1 2 Inadequate Com petence L1 11 Design Failure (or lack of design) process
2 O 3 Motivation OO 12 Purchasing Violation of =e B12.1: Lack of needs analysis and specification of
3 O01 4 Physical and psychological load during work E134: Maintenance Al3 | procedure nem svsternyequipmentrequirernent
EÏ 14 Ageing / Obsolescence Al4.3: Procedures for maintenance B122: Inadequate specifi to vendor
Sub Celene: Sub Categury: Ấn 1: cs _ ation control % ane
A14 Process šicbdký quak~ ta B12) Purchaimz |B124: Inadequate storage of equipment
À14.2:-—tmtHatzd automattcally by svstem B12 Š: Inadequate transport of equipment Lack of Control (C): Ineffective! : _ J
5 OO 2 Inadequate system standards 0 5 Inadequate Operational Procedures protection : ° °
ö CO 3 Inadequate compliance with routines OO 6 Inadequate Design Procedures B13] MM Bl3.1: Lack/not sufficient
5 = - B132: haẻsquate glanninz c£rmatntenance
Trang 26
Methods for RCA
STEP; Sequential Time Event Plotting
FMEA; Failure Mode Effect Analysis
FTA; Fault Tree
¢ + common sense, engineering/operational
experlence
MANAGING RISK !>`.)0/
Trang 27STEP; Sequentially Time Event Plotting
Trang 28FMEA ; Failure Mode and Effect Analysis
[— *~——————————————————————————————————”—————————I
Component
Broken axel Fatigue None Pump Impeller Corrosion | Loss of Pressure
P /Wear Pressure Indicator
El Motor Winding None
Soft-starter Fail to Unknown None
Trang 29Fault Tree
Top
Identifies causes for an Intermediate
causes and effects
Trang 30
Which one to use?
¢ STEP:
— For complex events with many actors
— When time sequence is important
Trang 31Detailed analyzes of failed
parts/components
MANAGING RISK |>› š2
Trang 32[— _ *~———————————————————————————————————————————————I
Typical examples of systems/equipment
that can be analyzed:
@ Electrical generators @ Fire and gas-detectors
@ Heat exchangers @ Sensors and measuring devices
@ Subsea equipment @ Components of gasturbines
@ Control systems @ Cranes and lifting equipment
@ Pumps @ Well and down hole drilling
equipment
MANAGING RISK !>`.)0/
Trang 33@ Systematic removal of failure sources
@ Prevent repetitive problems
@ Minimise maintenance down-time
@ Extend equipment life
DNV
MANAGING RISK !>`.)0/
Trang 34
RCFA evaluates factors affecting
service performance such as:
@ Materials/corrosion/envIronment
@ Changes in operational conditions
@ Stresses and strains
@ Presence of defects and their origin, nature and consequences
Trang 35@ Incorrect repair introducing new defects
@ Poor quality manufacture leading to sub-
Trang 36F—”———=————————————————
Examples of problems disclosed
by the laboratory investigation
as part of the RCFA:
GEARS
e Incorrect material Vibration
Incorrect surface
¢ Incorrect design treatment
¢ Incorrect assembly ¢ Geometric imperfections
© Corrosion ¢ Incorrect operation
Fatigue or overloading
MANAGING RISK
¢ Lubricating problems
Trang 37[— _ *~———————————————————————————————————————————————I
Examples of problems disclosed
by the laboratory investigation
as part of the RCFA:
Incorrect torque or
overloading
DNV
MANAGING RISK !>`.)0/
Trang 38
Examples of problems disclosed
by the laboratory investigation
as part of the RCFA:
| BALL-/ROLLER BEARING
¢ Poor design ¢ Overload
¢ Manufacturing defects Inadequate lubrication
¢ Poor alignment and ¢ Vibration
¢ Electrical discharge © Corrosion
(arcing)
Ed
MANAGING RISK !>`.)0/
Trang 39[— _ *~———————————————————————————————————————————————I
Root Cause Failure Analysis Disclosed Failure of:
| MAIN BEARING
| ¢ Heavily worn raceway, cracking of
| casehardened surface, plastic deformation of
Trang 40¢ Four gas leaks on TLP
platform equipment in HP &
Trang 41F—”———=————————————————
Examples of problems disclosed by
the laboratory investigation as part
of the RCFA:
| DRIVE SHAFTS
¢ Incorrect material quality @ Surface defects
¢ Incorrect design @ Corrosion
¢ Poor quality manufacture @ Incorrect balance and