MTO is a complex supply chain where raw material and resource availability, assembly and production capacities and other supply chain attributes should be considered in order to promise customer orders. In such an environment, determining which orders to accept and which to reject is one of the toughest decisions. Available-to-Promise (ATP) is a business function, which has the capability to respond to customer requests by matching them with the available enterprise resources and at the same time provides acceptable scheduled ship dates.
Trang 1The Supply Chain Management Blog covers the latest in SCM
strategy, technology, and innovation.
SUPPLY CHAIN MANAGEMENT , SUPPLY CHAIN PLANNING August 29, 2018
4 Stages of Oracle Global Order Promising (GOP) in Make-to-Order Production Systems
Manmeet Walia, Principal Consultant at Trinamix
In times of growing competitiveness, the significance of operations planning has become
Guest Author
Subscribe to email updates
Oracle Supply Chain Management Blog
MENU
Trang 2very important in a wide range of industries Customers today expect quick responses to their orders They are demanding more and more customized products, which they are able
Trang 3objective to minimize costs, maximize profits and service levels Manufacturers have to think
in advance much before the arrival of actual customer orders, especially in Make-to-Order (MTO) production systems
MTO is a complex supply chain where raw material and resource availability, assembly and production capacities and other supply chain attributes should be considered in order to promise customer orders In such an environment, determining which orders to accept and which to reject is one of the toughest decisions Available-to-Promise (ATP) is a business function, which has the capability to respond to customer requests by matching them with the available enterprise resources and at the same time provides acceptable scheduled ship dates
Oracle Global Order Promising (GOP) provides an internet-based fast ATP tool that calculates accurate and reliable delivery promises This solution follow below 4 step process methodology for promising delivery dates
Stage 1: Customer Segmentation Stage 2: ATP Allocation
Stage 3: Order Promising Stage 4: Forward Scheduling
Trang 4Fig: GOP process flow for order promising in MTO environment
In Stage 1: Customer information, nature of orders (received in the past), customer type etc.
is evaluated to define customer/demand class A demand class represents a grouping of customers, such as government and commercial customers, or it may represent sales channels or regions Focus here is on the profit which each customer gives type of the customer and the degree of the ordered product complexity
Trang 5Central/Demand Management for each customer class and supply planning information from Planning Central/Supply Planning Depending on the situation, the allocation can be equal to the forecast of the customer or to a portion of supply when supply is constrained
Under Stage 3: Based on configured ATP Rules, GOP engine generates expected
scheduled delivery dates if the order is accepted and the material and resource capacity is available ATP rules define the Order Promising behavior by allowing to specify the promising mode, supplies and demands to be considered during promising, capable to promise and profitable to promise
Un-satisfied orders due to any constraints in material or resources in Stage 3 are passed through Stage 4 of Forward Scheduling which calculates about what could be possible future
dates when the product can be delivered This phase looks beyond the request date to find a future supply that can meet the shortage
One of the biggest challenge in demand fulfilment in MTO environment is to implement the supply chain model in practise and to get a good balance between solution quality and short response time Hence there is a strong need to have accurate and clean master data
available in the ERP system If business rules and framework is created which could overcome the limitations, Oracle Global Order Promising (GOP) can promise very accurate deliveries and enhance the customer service levels
The author is working with Trinamix as a Principal Consultant Trinamix, an Oracle Platinum Partner (Cloud Select NA) is the global service provider and the leading implementation specialists for Oracle Cloud Applications Trinamix has its signature PaaS based solutions on Oracle Cloud Click here to read Trinamix Success Stories.
Trang 6Recent Content
Be the first to comment
Comments ( 0 )
SUPPLY CHAIN MANAGEMENT
4 Top Sessions for High Tech
Manufacturers at Oracle
OpenWorld 2019
SUPPLY CHAIN MANAGEMENT Integrated Business Planning and Execution (IBPX): The Latest Evolution of IBP
SUPPLY CHAIN MANAGEMENT Thriving in a World of Rising Customer Expectations: Q&A with Lisa Anderson
Trang 7By Eva Chen, Digital Marketing
Manager, Discrete Industries
Oracle OpenWorld 2019 is just
around the corner From
September 16 to 19, you’ll
By Tom McDonough, Sr Director Product Management, Oracle In our hyperconnected world, disruptive forces are everywhere and accelerating: The
By Lisa Anderson, President of LMA Consulting Group According
to a recent project44 report, 94%
of business purchasers surveyed expect the
Site Map Legal Notices Terms of Use Privacy Cookie Preferences Ad Choices Oracle Content Marketing Login