The following will be discussed in this chapter: The plan-monitor-control cycle, data collection and reporting, earned value, project control, designing the control system, scope creep and change control.
Trang 1Fifth Edition
Chapter 7 Monitoring and Controlling the Project
Trang 4Control System Information Flow
Trang 9Data Analysis Examples
Trang 11particular opportunity or problem within the project itself
Trang 18Earned Value Chart
Trang 22a: Positive schedule variance, negative spending variance
Trang 23Calculations for Example
Trang 26DVD Project
Trang 35Critical Ratio Calculations
Trang 37Two Sample Control Charts