List what needs to be achieved test objectives Detail why testing needed.] The summary of the features will be tested : General Functions:  View company documents TC: 4 man-days, Test

Trang 1

ASSIGNMENT SOFTWARE-TESTING

Test Plan

Table of content

Group members:

50600357 Tran Hoang Duy

50601095 Truong Quang Khai

50600939 Bui Phi Hung

Trang 2

SinhVienZone.Com

Trang 3

1 REFERENCES

1 Test plan template

2 www.google.com.vn

SinhVienZone.Com

Trang 4

2 INTRODUCTION

[Topics introduction]

“BUILDING ONLINE DOCUMENT MANAGEMENT SYSTEM”

Manager Vietnamese Documents

Allow user searching documents by semantic , by word key and by combination

System is based on JSP and Struts Framework 1.3.10 technology

Run on Internet Explorer or Mozilla FireFox

System must ensure search speeds less than 10 seconds

System can distribute documents access to users

[Give an overview of the plan:

The summary of the requirements

List what needs to be achieved (test objectives)

Detail why testing needed.]

The summary of the features will be tested :

General Functions:

 View company documents (TC: 4 man-days, Test: 2 man-days)

 View department documents (TC: 2 man-days, Test: 1.5 man-days)

 Grant privilege (TC: 1 man-days, Test: 0.5 man-days)

 Manager personal documents (TC: 2 man-days, Test: 1 man-days)

Common Functions:

 View individual profile (TC: 0.5 man-days, Test: 0.5 man-days)

 Change password (TC: 0.5 man-days, Test: 0.5 man-days)

 Share documents (TC: 5 man-days, Test: 3 man-days)

 Upload one or many documents (TC: 2 man-days, Test: 1 man-days)

 Search documents (TC: 2 man-days, Test: 1 man-days)

[Testing purpose]

List what needs to be achieved and details why testing needed :

Test all of auxiliary tasks

Estimate project performance

SinhVienZone.Com

Trang 5

3 TEST ITEMS

[List of Software Items to be tested, their versions and how they are handed over for testing]

A build of Project Version 1.0 Teacher send to my group Project and installations as Testing Software Assignment

SinhVienZone.Com

Trang 6

4 SOFTWARE RISK ISSUES

[List all software Risks These risks are related to the testing process, other risks will be mentioned in section 5.Features to be tested Below are some common risks:

Lack of personnel resources when testing is to begin

Lack of availability of required hardware, software, data or tools

Late delivery of the software, hardware or tools

Delays in training on the application and/or tools

Changes to the original requirements or designs

Complexities involved in testing the applications]

Lack of personnel resources:

We have 2 persons while the system has about 9 tasks must be tested

Lack of availability of required hardware, software, data or tools :

 Hardware:

We have about 2 PCs

 Software:

OS : Unix , Windows Xp , Windows 7 run in VMware workstation Web browsers: Internet Explored 6 ,7,8 and Mozilla FireFox

 Data:

OK

 Tools:

We have no some tools for doing performance test , usability test and security test

SinhVienZone.Com

Trang 7

SinhVienZone.Com

Trang 8

5 FEATURES TO BE TESTED

[List all features will be tested under this test plan

Identify risks for each feature by their likelihood and impact and then determine the extent of testing

Identify testing efforts for each type of test]

Feature No Feature Description

Technical Risk

Business Risk

Risk Priority

Extent of Testing

Estimated Testing Time (hours)

documents

documents

3 Grant privilege

documents

profile

documents

Total Estimated Testing Time SinhVienZone.Com

Trang 9

6 FEATURES NOT TO BE TESTED

[List all features will not be tested under this test plan]

Feature

No Feature Description

Technical Risk

Business Risk

Risk Priority

Extent of Testing

Estimated Testing Time (hours)

2 Usability

3 Security

SinhVienZone.Com

Trang 10

SinhVienZone.Com

Trang 11

7 TEST STRATEGIES

[The Test Strategy presents the recommended approach to the testing the target-of-test The previous section, feature to be tested, described what will be tested, this section describes how the target-of-test will

be tested

For each type of test, provide a description of the test and why it is being implemented and executed

If a type of test will not be implemented and executed, indicate in a sentence stating the test will not be implemented / executed and stating the justification, such as “This test will not be implemented / executed This test is not appropriate …”

The main considerations for the test strategy are the techniques to be used and the criterion for knowing when the testing is completed

In addition to the considerations provided for each test below, testing should only be executed using known, controlled databases, in secured environments

In addition, you need to describe:

Testing Tools/Aids

Constrains to testing

Support Required – Environment & Staffing

What metrics will be collected?

Which level is each metric to be collected at?

How is Configuration Management to be handled?

How many different configurations will be tested?

Hardware

Software

Combinations of HW, SW and other vendor packages

What levels of regression testing will be done and how much at each test level?

Will regression testing be based on severity of defects detected?

How will elements in the requirements and design that do not make sense or are untestable be processed?]

7.1 Function Testing

[Function testing of the target-of-test should focus on any requirements for test that can be traced directly to use cases (or business functions), and business rules The goals of these tests are to verify proper data acceptance, processing, and retrieval, and the appropriate implementation of the business rules This type of testing is based upon black box techniques, that is, verifying the

SinhVienZone.Com

Trang 12

Technique: Execute each use case, use case flow, or function, using valid and invalid data,

to verify the following:

The expected results occur when valid data is used

The appropriate error / warning messages are displayed when invalid data

is used

Each business rule is properly applied

Completion Criteria: All planned tests have been executed

All identified defects have been addressed

Special Considerations: [Identify / describe those items or issues (internal or external) that impact

the implementation and execution of function test]

7.2 Performance Testing

[Performance profiling is a performance test in which response times, transaction rates, and other time sensitive requirements are measured and evaluated The goal of Performance Profiling is to verify

performance requirements have been achieved Performance profiling is implemented and executed to profile and tune a target-of-test's performance behaviors as a function of conditions such as workload or hardware configurations

NOTE: Transactions below refer to “logical business transactions.” These transactions are defined as specific use cases that an actor of the system is expected to perform using the target-of-test, such as add

or modify a given contract.]

Test Objective: Ensure search speed less than 10 seconds

Technique: Use Test Procedures developed for Function Cycle Testing

Modify data files (to increase the number of transactions) or the scripts to increase the number of iterations each transaction occurs

Many users access at the same time

Completion Criteria: Single Transaction / single user: Successful completion of the test scripts

without any failures and within the expected / required time allocation (per transaction)

Multiple transactions / multiple users: Successful completion of the test scripts without any failures and within acceptable time allocation

Special Considerations: In assignment requirements hasn’t performance test

SinhVienZone.Com

Trang 13

8 ITEM PASS/FAIL CRITERIA

[This section of the test plan describes the pass/fail criteria for each of the items described in Section 3 - Test Items

Typically, pass/fail criteria are expressed in terms of test cases passed and failed; number, type, severity and location of bugs; usability, reliability, and/or stability

Examples of pass/fail criteria include:

% of test cases passed

number, severity, and distribution of defects

test case coverage

successful conclusion of user test

completion of documentation

performance criteria.]

TestCase Result

SinhVienZone.Com

Trang 14

9 ENVIRONMENTAL NEEDS

[List all testing environments needed]

System Resources

IE 7

SinhVienZone.Com

Trang 15

10 TEST DELIVERABLES

[List all documents can be delivered such as: Test Plan, Test cases, Test Reports etc]

[List all test scripts can be delivered]

1 Test Plan

Tran Hoang Duy (50600357) Nguyen Phi Hung (50600939) Nguyen Truong Minh (50601490)

2 Installation

Tran Hoang Duy (50600357) Truong Quang Khai (50601095)

3 TestCase

Design : Tran Hoang Duy (50600357) Excute : Truong Quang Khai (50601095)

SinhVienZone.Com