Summary thesis Doctoral: Managing investment project on infrastructure construction in the form of Public Private Partnership in Vietnam

19 47 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 19
Dung lượng 468,94 KB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Develop scientific arguments and propose solutions to improve the management of investment projects on infrastructure construction in the form of PPP in Vietnam.

Trang 1

1. Rationale of the thesis

Currently Vietnam has more than 200 projects implemented in the form of PPP, of which the total  investment capital of the private sector is about 6.7 billion USD, of which BOT, BT and BOO models make 

up   the   majority   Areas   of   involvement   in   private   investment   include   transportation,   energy,  telecommunications,   supply   and   drainage   Most   infrastructure   construction   projects   carry   out   PPP  investments   in   Vietnam   mainly   in   the   fields   of   transport,   energy   and   some   projects   in   other   areas.  Infrastructure construction projects in PPP form are mainly implemented under BOT, BT, BTO and BOO Most   BOT,   BT,   BTO   and   BOO   projects   in   Vietnam   still   mainly   apply   the   form   of   contractor  designation in the process of selecting investors, leading to a reduction in competition and transparency in  the selection of houses. investment, potential risks, losses and waste. Meanwhile, the announcement of the  project and the list of projects has not been implemented seriously and publicly

The monitoring process in the implementation of PPP contracts is still loose, leading to the quality is  often unsecured, subsidence, degradation but not timely overcome. The process of managing investment  projects to build infrastructure in the form of PPP in Vietnam in recent years still faces many shortcomings  from the decentralization of project management, socio­economic efficiency and financial efficiency. for the  parties involved in the implementation of PPP projects, the quality of the project, the progress and time of   the project implementation, the project fund compared to the original   Therefore, the PhD.candidate has 

decided to select the thesis topic “Managing investment project on infrastructure construction in the form of   Public Private Partnership in Vietnam” is a practical meaning in terms of theory and practice.

2.Objective and mission of the thesis

2.1.Objective of the thesis 

Develop   scientific   arguments   and   propose   solutions   to   improve   the   management   of   investment  projects on infrastructure construction in the form of PPP in Vietnam

2.2. Mission of the thesis

Gathering,   systematizing   the   basic   arguments   on   management   of   infrastructure   construction  investment projects in the form of PPP; Survey, analyze and evaluate the actual management of investment  projects on infrastructure construction in the form of PPP in Vietnam; Proposing some solutions to perfect   the management of infrastructure construction investment projects in the form of PPP in Vietnam

       3. Object and scope of research  

3.1. Object of the thesis

The object of the thesis research is the theory and practice of managing infrastructure construction  investment projects in the form of PPP

3.2. Scope of the thesis

+  As  for spatial  dimension:The topic has  a  research scope  in state  agencies participating  in the 

management   of   infrastructure   construction   investment   projects   in   the   form   of   PPP   and   investor  organizations, management, implementation and transport operating infrastructure investment projects in the  form of PPP in Vietnam

+   As   for   time   dimension:  The   project   focuses   on   researching   the   status   of   management   of 

infrastructure construction investment projects in the form of PPP in Vietnam in the period from 2010 to  

2017 and proposing solutions to 2025 and orientation to 2030

+As for content: 

The thesis studies the theory of management of investment projects on infrastructure construction in  the form of PPP in Vietnam under the perspective of state management, including 04 contents: Strategy,   planning of PPP projects; Organization of PPP project management apparatus; Organizations implementing 

Trang 2

PPP projects; Check, supervise, process and adjust PPP projects. In addition, the project has also selected  and analyzed a number of specific PPP projects in a number of infrastructure areas such as: Road traffic,   thermal power and water supply

4. Achievements of the thesis

In terms of theory: The thesis will gather, systematize, supplement and develop theoretical issues 

such as concepts, content and characteristics of investment projects on infrastructure construction in the form 

of PPP. ; manage investment projects to build infrastructure in the form of PPP; evaluation criteria and  factors affecting the management of investment projects on infrastructure construction in the form of PPP

In terms of practicality: Overview of the current situation of investment projects on infrastructure 

construction in the form of PPP in Vietnam and analysis of the situation of some projects in infrastructure  sectors; analyze and evaluate the status of management of investment projects on infrastructure construction 

in the form of PPP in Vietnam; Thereby proposing recommendations and solutions to adjust and increase the  effectiveness of management of investment projects to build infrastructure in the form of PPP in Vietnam in  the coming time

Chapter 1 OVERVIEW OF RESEARCH SITUATION AND RESEARCH METHOD

1.1. Overview of research situation

1.1.1. Research situation in the country related to the topic

Domestic topics have studied and solved a number of issues related to PPP and state management  for investment projects on infrastructure construction in the form of PPP in Vietnam. These topics are  important in providing secondary data and access theory for the research of the thesis

1.1.2. The situation of foreign research related to the thesis

Overseas studies have generalized the concept, content, form and factors affecting PPP as well as  experiences of some countries on infrastructure construction investment projects in the form of PPP. This is 

an important secondary source of resources to help build a theoretical framework for managing investment  projects on infrastructure construction in the form of PPP in Vietnam, orienting the scientific approach to the  thesis and providing the thesis a lot of useful information for the implementation of research on management 

of infrastructure construction investment projects in the form of PPP such as transport, energy and water   supply projects in Vietnam under current conditions

1.1.3. Knowledge gap

The topics have not yet considered the overall management of investment projects built in the form 

of PPP of many fields of infrastructure with different characteristics, so the management of investment  projects of each type has different points. especially in the process of preparing, implementing projects and  exploiting projects

The topics have not been considered uniformly on the concept, content, evaluation criteria and  factors affecting the management of infrastructure construction investment projects in the form of PPP.  These   are   functions   that   should   be   supplemented   and   clarified   both   on   the   theoretical   basis   and   the  management of infrastructure construction investment projects in the form of PPP in Vietnam

1.2. Research Methods

1.2.1. Data collection methods

­ Methods of primary data collection: The thesis uses survey form, collects information, evaluation  opinions of related objects to assess the research areas of the thesis. In addition, the thesis also uses interview  methods, through experts

Trang 3

­ Methods of secondary data collection: The thesis gathers and collects secondary data through  books, newspapers, specialized scientific journals, relevant dissertations, published data  of  Ministry of  Planning and Investment, Ministry of Transport, Ministry of Construction, Ministry of Industry and Trade,  People's Committees of provinces and cities under central authority and enterprises participating in PPP  projects

1.2.2. Methods of general analysis

The   thesis   synthesizes   data   based   on   primary   and   secondary   data,   thereby   using   descriptive  statistics   method,   deductive   method   to   base   on   quantitative   analysis   of   data   from   which   to   capture  characteristics of management of infrastructure construction investment projects in the form of PPP of  Vietnam

1.2.3. Inheritance method

The dissertation references and uses some results that have been studied before in management of  infrastructure construction investment projects in the form of PPP to supplement the arguments and apply in  the thesis. The thesis does not use this method to copy but use those results in a scientific and rational way to  clarify the theoretical and practical basis of the thesis

Chapter 2 THEORETICAL BASIS ON THE MANAGING INVESTMENT PROJECT ON 

INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE PARTNERSHIP  2.1. Overview of investment projects on infrastructure construction in the form of public­private  partnership (PPP)

2.1.1. Investment project on infrastructure construction

2.1.1.1. Investment project on infrastructure construction

According to the Vietnam Investment Law 2014, the investment project is a collection of proposals 

to remove medium and long­term capital to conduct investment activities in specific areas, within a specified  period. An investment project to ensure feasibility must meet the following requirements: Scientific and  systematic; Legal; Unity and practicality

2.1.1.2. Concepts, characteristics and classification of construction investment projects

According to Clause 15, Article 3 of the Construction Law 2014: "Construction investment projects  are   a   collection   of   proposals   related   to   the   use   of   capital   to   conduct   construction   activities   for   new  construction and repair. repairing and renovating construction works in order to develop, maintain, improve  the quality of works or products and services within a specified period and expenses. In the preparation  phase of construction investment, the project is expressed through reports of pre­feasibility studies and  construction investment feasibility studies or economic and technical construction investment reports. build 

"

According   to   the   stages   of   construction   investment   projects   The   process   of   formation   and  implementation   of   an   investment   project   has   undergone   3   stages:   Prepare   investment,   prepare   for  implementation and implementation of the project

2.1.2. Investment projects for infrastructure construction in the form of PPP

2.1.2.1. Concept of PPP form and infrastructure construction investment project in PPP form

It is understandable that the public­private infrastructure investment project is a set of proposals for  cooperation between the public and private sectors to abandon medium and long­term capital to carry out  early activities. In specific areas, within defined time periods in which resources, risks, responsibilities and  benefits are shared between the two parties to achieve a common goal

2.1.2.2. Characteristics of infrastructure construction investment projects in the form of PPP

Applicable to long­term projects (most of which last 20­30 years), so it is most suitable for the field 

Trang 4

of   infrastructure   and   environment;   Create   more   investments   for   infrastructure   construction;   Helping  stakeholders to share, allocate and manage risks in the project implementation process better and more   effectively; Cost savings

2.1.2.3. The role of PPP investment in infrastructure development

Investment projects on infrastructure construction in the form of PPP have the following roles:  Diversifying investments in infrastructure and investment in the form of PPP will create more growth,  development and stability for businesses. of the private sector; PPP will help to distribute and manage risks  more effectively; PPP will help infrastructure construction projects save more costs

2.1.2.4. Forms of investment projects to build infrastructure in the form of PPP

There   are   7   forms   of   PPP   including:   Construction   ­   Business   ­   Transfer   (BOT)   contract;  Construction ­ Transfer ­ Business Contract (BTO); Construction ­ Transfer (BT) contract; Construction ­  Ownership ­ Business Contract (BOO); Construction Contract ­ Transfer ­ Rent Service (BTL); Construction  Contract ­ Service Lease ­ Transfer (BLT) and Business ­ Management (O&M) Contract

2.2. Managing investment projects on infrastructure construction in the form of PPP

2.2.1. Identify the concept of managing investment projects to build infrastructure in the form of PPP 2.2.1.1. Concept of management of infrastructure construction investment projects

Management   of   infrastructure   construction   investment   projects   is   the   process   from   project  formulation,   project   appraisal,   coordination  of   resources  to  build  and  operate  projects  and  inspect   and  supervise the process of formation, development and end of the project to ensure that the infrastructure   construction project is completed on time, within the approved budget, to meet the technical and quality   requirements of products and services, by methods the best conditions allow

2.2.1.2. Concept of managing infrastructure construction investment projects in the form of PPP

It can be understood that the management of infrastructure construction investment projects in the  form of PPP is the process from the formulation of strategy, planning, organizational apparatus, PPP project  formulation, PPP project appraisal, coordination of resources. to build and operate PPP projects and inspect  and supervise the process of formation and development of PPP projects to ensure benefits for investors as   well as ensure that PPP projects are completed on time and within approved budget range, meeting the  technical and quality requirements of products and services, by the best methods and conditions allowed

2.2.2. Objectives, principles, requirements and criteria for evaluating the management of investment   projects to build infrastructure in the form of PPP

2.2.2.1. The objective of managing investment projects to build infrastructure in the form of PPP

The objective of managing infrastructure construction investment projects in the form of PPP includes:  the supreme purpose that project management activities aim at, overall goals and specific objectives

2.2.2.2. Principles for management of infrastructure construction investment projects in the form of PPP

­ Project implementation management must be consistent with the type of capital used for construction  investment   and   infrastructure   construction   investment   projects   under   PPP   must   be   strictly   managed,  comprehensive, in accordance with the order to ensure the item investment targets, quality, implementation  schedule, cost savings and project impacts on landscape, environment, community safety, defense, security  and effectiveness of PPP projects

­   Managing   investment   projects   of   PPP   projects   must   ensure   clear   benefits   and   delineation   for  investors

2.2.2.3. Basic requirements for management of infrastructure construction investment projects in the form of   PPP

Trang 5

in the form of PPP; Requirements on institutional implementation of PPP; Assurance requirements for  commercial, financial and economic activities for PPP projects and requirements for consultations with  parties involved in PPP project management

2.2.3. Content of the management of infrastructure construction investment projects in the form of PPP 2.2.3.1   Develop   strategies and planning of infrastructure construction investment projects in the form of   PPP

Strategies and planning of investment projects for infrastructure construction in the form of PPP are  the process of arranging and managing the works to accomplish the objectives of the PPP project. Investment  

in infrastructure construction in the form of PPP is an important function of competent state agencies. From 

an economic perspective, it is the process of orienting the way to develop and set up short and long­term   plans to implement PPP projects

2.2.3.2. Organize the project management apparatus for infrastructure construction in the form of PPP   investment.

The organization of managing investment projects on infrastructure construction in the form of PPP  under the view of state management is the determination of the role and position of the government, thereby  assigning powers of each level and process. The level of project management depends on the amount of  capital,   the   size   of   each   project   will   be   managed   and   managed   by   which   level   Depending   on   the  characteristics of each project, countries have different hierarchies

2.2.3.3.  Managing the implementation of infrastructure construction investment projects in the form of PPP

For infrastructure construction investment projects in the form of PPP is the process of implementing  policies   to   put   policies   into   practice   The   process   of   organizing   the   implementation   of   infrastructure  investment   projects   under   PPP   includes   preparation,   implementation,   supervision   and   management   of  infrastructure construction investment projects under PPP

2.2.3.4   Check,   evaluate,   handle   violations   and   adjust   the   process   of   implementing   management   of   infrastructure construction investment projects in the form of PPP.

Checking, evaluating, handling violations and adjusting the process of managing the construction of  infrastructure projects in the form of PPP investment are the activities that the project management agency  performs to promptly detect and handle , adjusting the actual construction of infrastructure projects in the  form  of  PPP investment  which  is facing difficulties  Detailed assessment  of  infrastructure construction  projects in the form of PPP investment is usually undertaken by specialized ministries

2.2.4. Criteria of evaluation of the management of infrastructure construction investment projects in PPP   form

2.2.4.1. Criteria for validity

Effectiveness of management of investment projects for infrastructure construction in the form of PPP  investment   must   meet   specific   requirements   on   investment   capital,   number   of   PPP   projects,   situation,  implementation level and implementation time. PPP projects based on the objectives identified by the PPP  project stakeholders

2.2.4.2. Criteria for efficiency

a) Socio­economic efficiency indicators of PPP projects are shown in 3 basic indicators: Economic net  present value (ENPV ­ Economic Net Present Value); Benefit Cost Ratio (BCR) and Economic Internal Rate 

of Return (EIRR ­ Ecomomic Internal Rate of Return)

b) Financial performance criteria: Total cost throughout the project life cycle; Total revenue and other  input   parameters:   loan   interest,   loan   period;   inflation   rate;   exchange   rate;   depreciation   rate   and   other  parameters

Trang 6

The feasibility of the infrastructure construction investment project under PPP is often considered  under the legal aspects and policy support; about technology; about the market's interest

2.2.4.4. Criteria of conformity

To consider the appropriateness of PPP projects based on the following criteria: Conformity with the  planning, sector and regional development plans and local socio­economic development plans; The ability to  generate revenue to return capital to investors, prioritizing the project to generate revenue from business  activities and the relevance of the information on having investors' interest

2.2.4.5. Criteria for sustainability

Sustainability in infrastructure construction investment management in the form of PPP investment is  shown by the distribution of benefits between the parties involved in PPP projects, capacity and level of PPP  implementation. In addition, the sustainability of infrastructure construction investment projects in the form 

of PPP is based on the environmental impact targets

2.3. Factors affecting to the management of infrastructure construction projects in the form of PPP  investment

For each specific research context will significantly affect the success of each PPP project, so to assess  the factors affecting the management of infrastructure construction investment projects in the form of PPP  can be viewed consider subjective factors and objective factors

2.3.1. Subjective factors

Policies of the Government and ministries and the capacity of managers of infrastructure investment  projects according to PPP

2.3.2. Objective factors

The level of socio­economic development of the country: The change in each stage of development of  the state, leading to the development of all sectors

Qualifications and capacity of private partners when participating in public­private partnerships: are  expressed in terms of finance, technology, management capacity, 

2.4. Experience in managing infrastructure construction investment projects in PPP form of some  countries and lessons learned for Vietnam

2.4.1. Experience of Canada

The form of public­private partnerships is carried out mainly in the model of DBFMO, DBFM   in  which the most common form is DBFMO

The legal system in Canada ensures that public­private partnership projects have transparent, public  information, a healthy competitive environment for investors to implement contracts and build good projects

2.4.2. Experience of China

The financial structure of the transport infrastructure project in the form of public­private partnerships 

of China is regulated to include three sources of capital: 30% budget capital, 60% loan capital and 10%   private capital. Of the 30% of the budget, 10% comes from the central government, 20% from the local   government where the project is implemented, the loan is borrowed from the state­owned private investor

2.4.3. Experience of Malaysia

In Malaysia there are no direct laws or regulations on the form of public­private partnerships. Instead,  the Government builds a legal system to initiate an overall program of attracting private resources in the  sector. the infrastructure. As a standard framework for project contracts with the goal of re­balancing the   balance between the parties, the Project Development Exclusive Certificate to ensure the benefit of the 

Trang 7

2.4.4. Lessons learned for Vietnam

­ Completing the system of mechanisms and policies to create a legal basis for the mobilization of   private capital

­ In most countries, a specialized PPP management unit is set up to supervise the construction of  contracts and the process of organizing bidding

­ Strengthening publicity, transparency, competition in building bidding process

Chapter 3 ANALYSIS AND EVALUATION OFTHE REAL SITUATION OF THE MANAGING INVESTMENT  PROJECT ON INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE 

PARTNERSHIPIN VIETNAM 3.1. Overview of the current status of infrastructure construction investment projects in the form of  PPP in Vietnam in the period of 2011 ­ 2017

3.1.1. Overview of PPP forms in Vietnam

According to the Ministry of Planning and Investment since 1997, ministries and localities have signed and  implemented PPP contracts with a total of more than 200 projects, headed by the Ministry of Transport with 80  projects, Next is the projects on clean water, waste water treatment, thermal power, solid waste and hospital and  telecommunications projects   Of which BOT, BOO and BT models account for a major proportion

According to the Ministry of Finance, the investment demand of Vietnam in the coming time is quite large, 

in the period 2016­2020 is about 480 billion USD. In which, investment in 11 power plant projects in BOT form,  with a capacity of 13,200 MW, investment capital of about 40 billion USD; about 1,380 km of expressways with  about 11 billion USD; projects on environment, health and education about USD 29 billion; Investment sector has  been expanded and PPP model in Vietnam has become more and more diversified

3.1.2. Overview of projects prioritized investment in infrastructure construction in the form of PPP in Vietnam

Since 1997, Vietnam has had more than 200 infrastructure construction investment projects in the form of  PPP. However, according to the Ministry of Planning and Investment, there are still 69 projects that need to be  prioritized for construction and exploitation. Including 42 transportation projects, 6 water supply projects, 5  wastewater treatment projects, 3 solid waste projects and 2 hospital projects

The total required investment capital for these 69 priority projects is about VND 334 trillion, of which toll  roads and bridges account for about 74% of the total investment capital. Investment capital for the remaining  sectors such as water supply, wastewater treatment, solid waste and hospital, is worth VND 26 trillion (7.8% of  the total investment capital), and This field has only 16 projects

3.2. Current situation of managing some investment projects on infrastructure construction in PPP form in  Vietnam

3.2.1. Current situation of managing some investment projects on construction of transport infrastructure 3.2.1.1. Overview of the current situation of investment projects to build transport infrastructure projects in the   form of PPP

Among 80 projects, the Ministry of Transport implemented 71 projects with a total investment of VND  202,556 billion, of which 20 projects have been completed and put into operation with a total investment of VND  23,799 billion with total The length is 569 km, 51 projects are in the investment implementation phase with total  investment of VND 178,757 billion with a total length of about 1700 km

3.2.1.2. Current situation of the process of managing investment projects to build transport infrastructure in the   form of PPP in Vietnam

Current transport PPP projects of Vietnam follow three phases: Project preparation, investor selection and  contract signing, implementation of PPP project contract. Like the project management structure in the transport 

Trang 8

sector in general, the management of transport infrastructure projects according to PPP is divided into 2 levels at  the central and local levels

3.2.1.3. Current situation of managing some investment projects to build transport infrastructure in the form of  PPP

a) Current status of management of Phu My Bridge construction investment project

Phu My Bridge project is invested in the form of construction ­ business ­ transfer (BOT) contract between 

Ho Chi Minh City People's Committee and Phu My Bridge BOT Joint Stock Company (PMC). This is a cable­ stayed bridge across the Saigon River, 4 lanes, 2.4 km long connecting District 2 and District 7 of Ho Chi Minh  City. The project was proposed by the HCM City People's Committee in February 2002. Experiencing many  procedures and procedures such as making pre­feasibility study reports, submitting to the Government and line  ministries for consideration and selection of investors, developers and Appraising the feasibility study report, Phu 

My Bridge BOT Contract was officially signed in February 2005. According to initial estimates, Phu My Bridge  BOT Project has a total investment of VND 1,807 billion, excluding value­added tax (VAT) and interest during  construction. The investor will finance 30% of e­commerce with equity and the rest with bank loans

­ Regarding the preparation of a research report on the feasibility of the project:

+ Total investment: E­commerce of the project is 1,806.52 billion VND (including the costs paid in foreign  currency is 71277 million USD and the costs payable in the local currency is 698.17 billion VND). The cost of  major construction investment is VND 1395.15 billion, accounting for 77.2%. Compensation for site clearance is  VND 100 billion

+ Expected fee level: To payback, PMC will be charged at 10,000 VND / 4­seat car ­ 30,000 VND /  container truck in the period 2009­2011, increased to 14,000­75,000 VND in the period 2012­2016 and VND  15,000­100,000 from 2017 to 2034

+ Time for implementing BOT contract: 26 years

­ Regarding the actual cost of the Phu My Bridge BOT investment project: The total investment of the  project actually arises to VND 2,840 billion (including loan interest, which was originally entered during  construction)

­ About actual vehicle traffic: at Phu My Bridge toll booth showing that the maximum capacity of the  station is 18 lanes. The number of lanes can be operated immediately at 14 lanes. In fact, daily activities only have 

2 motor lanes and 6 lanes of cars

­ Evaluate the effectiveness of Phu My Bridge BOT project management

BOT contract for PMC has the right to collect fees for 26 years on the basis of the total revenue from fee  collection (VND 10,149 billion) just enough to return the owner's equity, repaying the principal and interest, and  offsetting the cost of operation and payment Corporate income tax, and investor profits

Table 3.4: Results of feasibility analysis and debt repayment capacity of the project

Target

Capital Structure 

(%)

Capital  expenditures (%)

IRR (%)

NPV (VND billion)

Trang 9

According to the above table, it can be seen that the Phu My Bridge BOT contract, this project has a  positive financial NPV, a financial IRR greater than the cost of capital, a debt security ratio (DSCR) of 26 years 

on average of 1.37 and no year when DSCR is less than 1

b) Status of management of investment projects on construction of high­speed motorways in Hanoi ­ Hai  Phong

The Hanoi ­ Hai Phong highway project has a total construction length of 105.8 km, with 6 lanes and a  design speed of 120 km / hour

­ Regarding preparation of feasibility study reports of the project:

+ Total investment: Approved in 2008, the total investment of the project is VND 24,566 billion and  compensation and clearance costs of VND 2,500 billion

+ Capital mobilization: 51% from Vietnam Development Bank, 5% from Vietnam Bank for Foreign Trade,  10% from Vietnam Construction and Import­Export Corporation, 10% from Saigon Investment Joint Stock  Company and from other foreign loans. Estimated vehicle traffic: design capacity of 70,000 vehicles / day and  night. Project time: 35 years

­ In terms of actual costs and revenues: In fact during the construction process, the total investment  amounted to VND 45,487 billion, an increase of about VND 21,000 billion, an increase of nearly 86% compared 

to the initial investment. With total toll revenue of the whole project reaching VND 2,091 billion, on average, the  daily turnover of this unit is about VND 5.7 billion / day

­ Regarding the actual traffic volume: in 2017, the exploitation flow reaches 25,000­30,000 turns / day and  night, only nearly 40% of the expected capacity. Meanwhile, Highway 5 is always in overload

­ Evaluate the effectiveness of high­speed project management in Hanoi ­ Hai Phong

Although investors identified nearly 29 years of new capital recovery project. However, according to  Vidifi's calculations, the IRR of the Project for 35 years ranges from 9.41% to 9.78% and the NPV value is from  VND 5,356 billion to VND 6,945 billion. depending on whether or not to consider the currency depreciation  against the foreign currency 4% during the exploitation period

c) Current situation of management of investment project for construction of high­speed motorway of Dau  Giay ­ Phan Thiet (DPEP):

This is part of the North­South Highway located in the southern region of Vietnam. In 2013, DPEP is  planned to be the first high­speed project implemented in the form of PPP in which the Ministry of Transport will  contribute a part to the construction as a public investment while investors are expected to hope to invest in  construction of the remaining sections, operation and toll collection for both sections. Dau Giay ­ Phan Thiet  project has a positive impact on the national economic development

3.2.2. Current situation of managing some investment projects of building thermoelectricity in the form of PPP 

in Vietnam

3.2.2.1. Overview of the current situation of investment projects on construction of thermal power infrastructure

Although the number of investment projects in PPP energy sector in Vietnam is not too much, the actual  size and investment amount for each project is very large. For example, the BOT project of Son My 1 Thermal  Power Plant ­ Binh Thuan (investor is IPR­GDF SUE ­ Europe, Sojit Group ­ Japan and Pacific, with a total  investment of 2.2 billion USD) . Since 2010, electricity is the only industry in the national energy system with PPP  projects. The power sector has 19 thermoelectric projects invested under PPP, all of which are implemented under  BOT form. The Ministry of Industry and Trade is the agency assigned by the Government to manage and monitor  these 19 projects. Currently, thermal power projects exploited under the BOT form are expected to have a total  capacity of about 24,000MW when put into operation

3.2.2.2. Current situation of management process of investment projects to build thermoelectricity in the form of  

Trang 10

Basically, the thermo­power project management process according to PPP is like the process of transport  infrastructure. However, for the construction of thermal power infrastructure, it is based on Article 6 of Circular  23/2015 / TT­BCT on the Regulation on order and procedures for investment in thermal power plant project in the  form of PPP contract of the Ministry of Public love

3.2.2.3. Current situation of managing some investment projects of building thermoelectricity in the form of PPP 

in Vietnam

a) For management of Phu My 2 thermal power investment project

The project includes a 715 MW combined cycle gas fired power plant, which will be built, owned and  operated on a BOT basis by an established limited liability company in Vietnam it is Mekong Energy Company  Limited (MECO). The factory will be built in the area of Phu My Power Generation Center (PMPGC) operated 

by EVN and located in Phu My Industrial Complex in Ba Ria Vung Tau near Ho Chi Minh City. The project will 

be implemented under the BOT contract for 20 years

Private   investors   include:   MECO   Company   of   EDF   International   Group   (equity   contribution   ratio:  56.25%), Japanese Sumitomo company (owned capital: 28.125%); and 15.625% of Japan's Tokyo Electric Power  Company (TEPCO)

­ Regarding power capacity: In 2010, the total capacity is about 17,000 MW. Regarding the expected  electricity price: In the period, the electricity price will increase from 5.1 cents/kWh to about 7 cents/kWh

­ Current situation of managing Phu My BOT construction investment project 2: The process of preparing  feasibility study report of the project, the expected IRR and NPV index is the IRR of the project is 24% and NPV 

is 667 million USD

b) Management of investment project of BOO construction of Yen The thermoelectricity

The Yen The Thermal Power Project was established to realize investment opportunities of EIC Energy &  Industrial Development Joint Stock Company and meet Vietnam's increasing electricity demand. The project  includes a coal­fired thermal power plant with a capacity of 50MW, an average annual electricity output of 292.5  million kWh. The project has a total investment of 60,991,000 USD, of which loan is 48,902,000 USD, the  average financial power price in the project life cycle is 5 cents / kWh

In view of the investor NPV (EIP) = 13,157,376 USD, IRR = 15.3%, B / C = 1.09, the payback period is 12  years. However, in the past years, the risks in current conditions such as inflation, fuel price abolishment, etc., for  the project to not suffer losses, the EIC's selling price must be 7 cents / kWh or more. Even so, the project has  contributed practically to national energy security, poverty reduction and economic development in the North East  region

3.2.3. Current situation of managing some investment projects to build water supply systems in Vietnam

3.2.3.1. Overview of the current situation of investment projects on construction of water supply systems

Ministry of Construction as a specialized management only focuses on building and issuing policies. The  equitization policy of state­owned companies has been enacted and this policy will affect a wide range of public  service providers, including water supply companies. Accordingly, state­owned companies will be converted into  limited liability companies or joint stock companies. This policy was launched in 2002 and is still being  implemented. As of December 2014, there were 23 water supply companies established, in which the provincial  People's Committee kept most of these companies' shares

3.2.3.2. Actual situation of investment project management process to build water supply system in the form of   PPP

The process of managing PPP projects for clean water systems is based on Decree 15/2015 and is similar to  the  process  for   transport   infrastructure   The   only  difference  is   that   for   clean   water,   it   is  the   Ministry   of 

Ngày đăng: 11/01/2020, 16:00

TỪ KHÓA LIÊN QUAN

🧩 Sản phẩm bạn có thể quan tâm