BÊ TÔNG THÂN CỌC PHẢI ĐƯỢC NGÀM VÀO BẢN ĐÁY ÍT NHẤT 100 MM 9.. CỌC ĐƯỢC THI CÔNG TỪ MẶT ĐẤT 10.. PHẢI CÓ BIỆN PHÁP AN TOÀN CHO CỌC TRONG QUÁ TRÌNH VẬN CHUYỂN, NÂNG NHẤC 11.. NHÀ THẦU CUN
Trang 1BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
MẶT BẰNG BỐ TRÍ CỌC PILE LAYOUT PLAN
TỶ LỆ / SCALE: 1/100
A
B
C
D
1
31300
5000 5000
300
2
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2 M2
M2
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1 M1 M1 M1 M1
1000
THÉP ĐÁY BỂ
Ø12a150
4
4Ø16
THÉP TẤM DÀY 3MM
1
Ø8a150
2
Ø12a150 3
350
-2.30
CAST-IN PLACE CONCRETE
STEEL PLATE 3MM THICK REBAR OF BOTTOM SLAB
MẶT CẮT 1-1 SECTION 1-1
TỶ LỆ / SCALE: 1/25
Ø12a150 3
Ø12a150
4
1000
350
MÓNG M1 FOUNDATION M1
TỶ LỆ / SCALE: 1/25
BÊ TÔNG LÓT LEAN CONCRETE
BÊ TÔNG ĐỔ TẠI CHỔ
2000
THÉP ĐÁY BỂ
Ø12a150
4
4Ø16
THÉP TẤM DÀY 3MM
1
Ø8a150 2
Ø12a150 3
350
-2.30
CAST-IN PLACE CONCRETE
STEEL PLATE 3MM THICK REBAR OF BOTTOM SLAB
MẶT CẮT 2-2 SECTION 2-2
TỶ LỆ / SCALE: 1/25
Ø12a150
4
2000
350
MÓNG M2 FOUNDATION M2
TỶ LỆ / SCALE: 1/25
BÊ TÔNG LÓT LEAN CONCRETE
BÊ TÔNG ĐỔ TẠI CHỔ
4Ø16 1
Ø8a150 2
-1
1
-2
2
Ø12a150 3
Ø12a150
4
2000
350
MÓNG M3 FOUNDATION M3
TỶ LỆ / SCALE: 1/25
-3
3
2000
THÉP ĐÁY BỂ
Ø12a150
4
4Ø16
THÉP TẤM DÀY 3MM
1
Ø8a150 2
Ø12a150 3
350
-2.30
CAST-IN PLACE CONCRETE
STEEL PLATE 3MM THICK REBAR OF BOTTOM SLAB
MẶT CẮT 3-3 SECTION 3-3
TỶ LỆ / SCALE: 1/25
BÊ TÔNG LÓT LEAN CONCRETE
BÊ TÔNG ĐỔ TẠI CHỔ
4Ø16 1
Ø8a150 2
THUYẾT MINH CỌC BTCT :
1 CỌC BÊ TÔNG LY TÂM ỨNG LỰC TRƯỚC THƯỜNG (PC) ĐƯỢC SẢN XUẤT
THEO TIÊU CHUẨN TCVN 7888:2014 - "CỌC BÊ TÔNG LY TÂM ỨNG LỰC TRƯỚC"
2 SỬ DỤNG CỌC CẤP TẢI A, ĐƯỜNG KÍNH NGOÀI CỌC D=350MM, CHIỀU DÀY THÀNH CỌC t=60MM
MÁC BÊ TÔNG M600
3 MÔMEN UỐN NỨT CỌC 34.3KN.M, SỨC KHÁNG NÉN DỌC TRỤC TỐI ĐA 1814KN
4 THÉP DƯ ỨNG LỰC: Rb = 14500 KG/CM²
5 THÉP ĐAI: Rb = 3800 KG/M²
6 CHIỀU DÀI CỌC L=27.1M
7 KHẢ NĂNG CHỊU LỰC DỌC TRỤC THEO VẬT LIỆU P = 1814 kN
8 BÊ TÔNG THÂN CỌC PHẢI ĐƯỢC NGÀM VÀO BẢN ĐÁY ÍT NHẤT 100 MM
9 CỌC ĐƯỢC THI CÔNG TỪ MẶT ĐẤT
10 PHẢI CÓ BIỆN PHÁP AN TOÀN CHO CỌC TRONG QUÁ TRÌNH VẬN CHUYỂN, NÂNG NHẤC
11 KHẢ NĂNG CHỊU TẢI DÀI HẠN CỦA MỔI CỌC P = 750 KN
12 NHÀ THẦU CUNG CẤP CỌC PHẢI TRÌNH CHI TIẾT CỌC VÀ NEO CỌC TRƯỚC KHI THI CÔNG
13 CỌC ĐƯỢC THỬ TẢI THEO TIÊU CHUẨN TCVN 9393:2012: "CỌC - PHƯƠNG PHÁP THỬ NGHIỆM HIỆN TRƯỜNG BẰNG TẢI TRỌNG TĨNH ÉP DỌC TRỤC" TẢI TRỌNG NÉN TĨNH LỚN NHẤT PMAX = 2.0 P
14 THI CÔNG CỌC PHẢI TUÂN THEO TIÊU CHUẨN TCVN 9394:2012 " ĐÓNG VÀ ÉP CỌC - TIÊU CHUẨN THI CÔNG VÀ NGHIỆM THU ".
+ LỰC ÉP NHỎ NHẤT PMIN = 1.5 P
+ LỰC ÉP LỚN NHẤT PMAX = 2.0 P
15 CỌC THỬ TẢI TĨNH TẠI 1 TIM CỌC
GENERAL NOTES FOR RC PILE :
1 PRETENSIONED SPUN CONCRETE COMMON PILES (PC) WERE PRODUCED BY STANDARD 7888: 2008
-"PRETENSIONED SPUN CONCRETE PILES"
2 USED PILE CLASS OF LOADING A, OUTSIDE DIAMETER D=350MM, WALL THICKNESS t=60MM
3 CRACKING MOMENT 34.3KN.M, MAX VERTICAL LOADING 1814KN
4 PC BAR: Rb =14500 KG/ CM²
5 SPIRAL: Rb = 3800 KG/M²
6 LENGTH OF PILE L=27.1M
7 ULTIMATE LOAD CAPACITY: P =1814 kN
8 CONCRETE PILES MUST BE RESTRAINED ON TO THE BOTTOM AT LEAST 100MM
9 PILE IS CONSTRUCTED FROM NATUAL GROUND
10 LIFT PILE WITH A SAFETY METHOD
11 ALLOWABLE BEARING CAPACITY OF EACH PILE P = 750 KN
12 CONTRACTOR MUST PROVIDE DETAILS PILES AND CONNECTIONS PRIOR TO
13 PILE WERE LOAD TEST AT THE SITE BY STANDAR TCVN 9393:2012:" PILES - STANDARDTEST METHOD IN SITE FOR PILES UNDER AXIAL COMPRESSIVE LOAD" MAXIMUM STATIC LOAD Pmax = 2.0 P
14 PILE CONSTRUCTION MUST COMPLY WITH STANDARD TCVN 9394:2012 " PILE DRIVING AND STATIC JACKING WORKS - CONSTRUCTION, CHECK AND ACCEPTANCE "
M1
M1 M1 M1
M1
M1
M1
M1
M1
M1 M1
31900
MẶT BẰNG BỐ TRÍ MÓNG CỌC PILE FOUNDATION LAYOUT PLAN
1000
350
MẶT CẮT 1A-1A SECTION 1A-1A
TỶ LỆ / SCALE: 1/25
Ø12a150 3
Ø12a150
4
1000
350
MÓNG M3 FOUNDATION M3
TỶ LỆ / SCALE: 1/25
-1A
1A
ĐÀ KIỀNG +0.00
Ø12a150
4
4Ø16
THÉP TẤM DÀY 3MM
1
Ø8a150
2
Ø12a150 3
CAST-IN PLACE CONCRETE
STEEL PLATE 3MM THICK
BÊ TÔNG LÓT LEAN CONCRETE
BÊ TÔNG ĐỔ TẠI CHỔ
Ø12a150
5
SỐ LƯỢNG/ QUANTITY: 98CK
SỐ LƯỢNG/ QUANTITY: 6CK
SỐ LƯỢNG/ QUANTITY: 15CK
SỐ LƯỢNG/ QUANTITY: 20CK
CỌC THỬ TĨNH PILE STATIC LOAD TESTED
N6
N1 N2 N3 N4 N5
Ø12a150
3
2000
300 400
690 20690
expansion joint
2/使用A级载重桩柱 ;桩柱外直径 D= 350MM;桩柱长度t=60mm;混凝土级M=600
3/桩柱裂扭矩力34.3KN.M ;值压抗力最大 1814KN ;
4/预应力钢筋 Rb= 14500KG/CM2 ;
5/钢箍 Rb= 3800KG/M2 ;
6/桩柱长度 L= 27.1M;
7/桩柱材料值向受力能力 P= 1814kN;
8/桩身混凝土要屈曲进底板最小100mm ;
9/桩柱施工从地面 ;
桩柱布置平面
比例:1/100
1A-1A剖面
比例:1/25 数量:98 比例:1/25
比例:1/25
比例:1/25
比例:1/25 比例:1/25
1-1剖面
数量:6
M3基础
3mm厚钢板
混凝土现场灌浆
混凝土垫层
3mm厚钢板
混凝土现场灌浆
3mm厚钢板 混凝土现场灌浆
数量:15
数量:20
3mm厚钢板 混凝土现场灌浆
M1基础
M2基础
2-2剖面
混凝土垫层
池底钢筋 地梁
混凝土垫层
混凝土垫层
池底钢筋
池底钢筋
Trang 2BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
A B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
A
B
C
D
1
2300
31300
3 2
Ø14a200 3
Ø14a200
3 Ø14a200
Ø14a200
Ø14a200 6
Ø14a200 8
Ø14a200 8
MẶT BẰNG CỐT THÉP BẢN ĐÁY - LỚP TRÊN REINFORCED OF BOTTOM SLAB - UPPER LAYER
TỶ LỆ / SCALE: 1/100
Ø16a200 1
Ø14a200 9
Ø14a200 9
2000
-1
1
Ø16a200 1
Ø14a200
300 400
31300
1
7000
300 400
3
Ø16a200 2
MẶT CẮT 1-1 SECTION 1-1
TỶ LỆ / SCALE: 1/50
2
2
1050
2000
THÉP ĐÁY BỂ
THÉP NẮP BỂ
8Ø18 1
Ø6a200
2
CỐT THÉP CỘT C1 REINFORCEMENT OF COLUMN C1
TỶ LỆ / SCALE: 1/25
+3.50
-2.30
-3
3
8Ø18 1
Ø6a200
2
400
MẶT CẮT 3-3 SECTION 3-3
TỶ LỆ / SCALE: 1/50
CỐT THÉP BẢN ĐÁY LỚP TRÊN, CỘT C1 REINFORCED OF BOTTOM SLAB, COLUMN
Ø14a200 3
Ø14a200
Ø14a200
Ø14a200
7
Ø14a200
SỐ LƯỢNG/ QUANTITY: 30CK
Ø14a100 2
-2.30
CHI TIẾT RỐN THU ĐIỂN HÌNH PUMP PITCH OF TANK
TỶ LỆ / SCALE: 1/25
400 1
expansion joint
-2.30
690 300
(XEM BV THUYẾT MINH CHUNG)
690 2000
300
池底板钢筋平面-上层
3-3剖面
1-1剖面
比例:1/25
比例:1/25
比例:1/25 数量:30
C1柱钢筋
池底钢筋 池顶钢筋
Trang 3BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
A
B
C
D
1
30900 31300
300
3
MẶT BẰNG CỐT THÉP BẢN ĐÁY - LỚP TRÊN REINFORCED OF BOTTOM SLAB - UPPER LAYER
TỶ LỆ / SCALE: 1/100
Ø16a200 1
2 Ø16a200
100 300
31200
A
Ø14a200
Ø14a200 3
Ø10a1000X1000
* Ø14a200
6 -2.30
-1
1
2
2
100 300 400
930 400
B
Ø14a200 6 Ø16a200
00
2000 1085
2000
Ø14a200 6
Ø16a200 00
Ø14a200 6
MẶT CẮT 2-2 SECTION 2-2
TỶ LỆ / SCALE: 1/50
Ø14a200 9
Ø16a200 2
Ø14a200 9
400
Ø14a200 3
CỐT THÉP BẢN ĐÁY LỚP DƯỚI REINFORCED OF BOTTOM SLAB
1050
2000
THÉP ĐÁY BỂ
THÉP NẮP BỂ
8Ø16 1
Ø6a200
2
CỐT THÉP CỘT C2 REINFORCEMENT OF COLUMN C2
TỶ LỆ / SCALE: 1/25
+3.50
-2.30
-3
3
8Ø16 1
Ø6a200
2
400
MẶT CẮT 3-3 SECTION 3-3
TỶ LỆ / SCALE: 1/50
Ø14a200
SỐ LƯỢNG/ QUANTITY: 5CK expansion joint
池底板钢筋平面-上层
比例:1/100
比例:1/50
3-3剖面
比例:1/50
池底钢筋 池顶钢筋
比例:1/25 数量:5
C2柱钢筋
2-2剖面
Trang 4BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
A B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
A
B
C
D
1
31300
3
MẶT BẰNG CỐT THÉP BẢN NẮP - LỚP TRÊN REINFORCED OF COVER SLAB - UPPER LAYER
TỶ LỆ / SCALE: 1/100
3
3
Ø14a100 1
3130 200
+3.50
3130
*
Ø14a100
3115x4 =12460
Ø14a200
1
3
Ø14a100
6
Ø14a200
8
MẶT CẮT 3-3 SECTION 3-3
TỶ LỆ / SCALE: 1/25
Ø12a150 10
5 Ø12a150
D
200
+3.50
4300
Ø12a150
Ø12a200 gc
10
12
Ø12a150 9
Ø12a200 11
200 3700
200 200 200
200
DS1 DS1
30900
3450 3850
3450 3850
9 Ø12a150
Ø8a800x800
A
B
C D
1
31300
3
MẶT BẰNG CỐT THÉP BẢN NẮP - LỚP DƯỚI REINFORCED OF COVER SLAB - LOWER LAYER
TỶ LỆ / SCALE: 1/100
3
3
Ø14a200 3
7 Ø12a200
DS1
DS1A
DS1A
DS1
C1
C1 C1
C1
C1
C1 C1
C1 C1
C1 C1
C1
C1
C1 C1
C1
C1
C1 C1
C1
C1
C1 C1
C1
DS4
C2 C2
2 2
DS1
SÀN DÀY 150
Ø12a200
Ø12a200 12
DS1
DS1A
DS1A
DS1
C1
C1 C1
C1
C1
C1 C1
C1 C1
C1 C1
C1
C1
C1 C1
C1
C1
C1 C1
C1
C1
C1 C1
C1
DS4
C2 C2
DS1
MẶT BẰNG CỐT THÉP BẢN NẮP REINFORCED OF COVER SLAB
6 Ø14a100
expansion joint
Ø14a100 13
2x2Ø14a200 14
Ø14a100 13
2x2Ø14a200 14
expansion joint
SÀN DÀY 200
700
ROOF SLAB SÀN MÁI
1 Ø8a150
MẶT CẮT 6 - 6
Ø6a200 2 300
800 700
Ø6a200
CỐT THÉP NẮP THĂM N1
300 400
300
+3.50
板厚150
板厚200
板厚200
池顶板钢筋平面-上层
比例:1/100
池顶板钢筋平面-下层
比例:1/100
比例:1/25
6-6剖面 N1检查孔盖板钢筋
屋面
3-3剖面
Trang 5CỐT THÉP VÁCH TRỤC 1 - LỚP TRONG REINFORCED OF WALL AXIS 1 - INNER LAYER
TỶ LỆ / SCALE: 1/100
100 300
300 190 30900
-2.30
+3.50
Ø14a200
1
Ø14a200
3
Ø14a200
1
1
Ø14a200 6
BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
Ø14a200 7
CỐT THÉP VÁCH TRỤC 1 - LỚP NGOÀI REINFORCED OF WALL AXIS 1 - OUTTER LAYER
TỶ LỆ / SCALE: 1/100
100 300
300 100 -2.30
+3.50
Ø14a200 2
1
1
100 300
300 100 31900
-2.30
+3.50
26600
Ø14a200 1
Ø14a200 3
Ø14a200
CỐT THÉP VÁCH TRỤC B,C REINFORCED OF WALL AXIS B,C
TỶ LỆ / SCALE: 1/100
2 LỚP GIỐNG NHAU / 2 LAYER ARE THE SAME
3
3
1
Ø14a200
3
Ø8a800x800
*
PHÍA TRỤC 2
MẶT CẮT 1-1
+3.50
-2.30
Ø14a200 gc
300
gc1
250
MẶT CẮT 2-2
2 Ø14a200
4 Ø14a200
B,C
MẶT CẮT 3-3
Ø14a200 3
Ø8a800x800
* +3.50
-2.30
Ø14a200 gc
300
gc1
250
2 Ø14a200
4 Ø14a200
Ø14a200 gc
250
CỐT THÉP VÁCH TRỤC 1,3,B,C REINFORCED OF WALL AXIS 1,3,B,C
Ø14a200 4
CỐT THÉP VÁCH TRỤC 3 - LỚP TRONG REINFORCED OF WALL AXIS 3 - INNER LAYER
TỶ LỆ / SCALE: 1/100
100 300
300 100 -2.30
+3.50
Ø14a200
1
Ø14a200
3
Ø14a200
2
2
Ø14a200
CỐT THÉP VÁCH TRỤC 3 - LỚP NGOÀI REINFORCED OF WALL AXIS 3 - OUTTER LAYER
TỶ LỆ / SCALE: 1/100
100 300
300 100 -2.30
+3.50
Ø14a200 2
2
2
Ø14a200
3
Ø8a800x800
* +3.50
-2.30
Ø14a200 gc
300
gc1
250
2 Ø14a200
4 Ø14a200
30900
30900
30900
Ø14a150 bs1
Ø14a150 bs2
EXPANSION JOINT (XEM BV THUYẾT MINH CHUNG)
Ø14a150 bs1
Ø14a150 bs2
EXPANSION JOINT (XEM BV THUYẾT MINH CHUNG) Ø14a200
1
Ø14a200 1
比例:1/100 比例:1/100
1轴线柱钢筋-内层
1轴线柱钢筋-外层
比例:1/100
B,C轴线柱钢筋
2层一样
Trang 6BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
A B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
690 300
300 100 31900
-2.30
+3.50
3500 3500
3500
Ø14a200 1
Ø14a200 3
Ø14a200
CỐT THÉP VÁCH TRỤC A - LỚP TRONG REINFORCED OF WALL AXIS A - INNER LAYER
TỶ LỆ / SCALE: 1/100
4
4
300
300 100 31900
3500 3500
3500
Ø14a200
CỐT THÉP VÁCH TRỤC A - LỚP NGOÀI REINFORCED OF WALL AXIS A - OUTTER
TỶ LỆ / SCALE: 1/100
4
4
MẶT CẮT 4-4
Ø14a200 3
Ø14a200 1
+3.50
-2.30
Ø14a200 gc
300
gc1
250
2 Ø14a200
4 Ø14a200
CỐT THÉP VÁCH TRỤC A,D REINFORCED OF WALL AXIS A,D
Ø14a200 4
100 300
300 100 31900
-2.30
+3.50
3500 3500
3500
Ø14a200
1
Ø14a200
3
Ø14a200
CỐT THÉP VÁCH TRỤC D - LỚP TRONG REINFORCED OF WALL AXIS D - INNER LAYER
TỶ LỆ / SCALE: 1/100
5
5
300
300 100 31900
-2.30
+3.50
3500 3500
3500
Ø14a200 1
Ø14a200 2
CỐT THÉP VÁCH TRỤC D - LỚP NGOÀI REINFORCED OF WALL AXIS D - OUTTER
TỶ LỆ / SCALE: 1/100
5
5
Ø14a200 4
MẶT CẮT 5-5
Ø14a200
3
Ø14a200
1
+3.50
-2.30
Ø14a200 gc
300
gc1
250
2 Ø14a200
4 Ø14a200
Ø14a150
bs1
Ø14a150
bs2
-2.30
+3.50
Ø14a150 bs1
Ø14a150 bs2
EXPANSION JOINT
(XEM BV THUYẾT MINH CHUNG)
EXPANSION JOINT (XEM BV THUYẾT MINH CHUNG)
CHI TIẾT GIA CƯỜNG VÁCH ĐIỂN HÌNH DETAIL OF TYPICAL REINFORCED AT WALL
TỶ LỆ / SCALE: 1/25
Ø12a200
300
Ø12a200 x
THÉP VÁCH REBAR OF SLAB
x
400
300
Ø12a200 x
THÉP VÁCH REBAR OF SLAB
比例:1/100
比例:1/25
典型加强柱细节
比例:1/100
比例:1/100 比例:1/100
Trang 7BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
800 Ø8a150 400
+3.50
Ø8a200
400
B
5
5
6
6
400 3150
3100 X 4 = 12400 3150
1 4Ø16
400
800 Ø8a150
800 Ø8a150
1100 Ø8a200
800 Ø8a150
800 Ø8a150
1150 Ø8a200
800 Ø8a150 400
DẦM DS2 BEAM DS2
TỶ LỆ / SCALE: 1/50
16900
A
4 2Ø16
5
5
5
5
6
6
6
6
5
5
800 Ø8a150 400
+3.50
Ø8a200
400
3
1
1
2
2
400 3700
4 x 3500 4400
400
800 Ø8a150
800 Ø8a150
1500 Ø8a200
800 Ø8a150
1100 Ø8a150
1800 Ø8a200
1100 Ø8a150 400
DẦM DS1 BEAM DS1
TỶ LỆ / SCALE: 1/50
22100
2
4 2Ø16
1
1
1
1
2
2
2
2
1
1
200
800 Ø8a150 400
+3.50
Ø8a200
400
3
1
1
2
2
400 3700
4 x 3500 4400
1 4Ø16
800 Ø8a150
800 Ø8a150
1500 Ø8a200
800 Ø8a150
1100 Ø8a150
1800 Ø8a200
1100 Ø8a150 400
DẦM DS1A BEAM DS1A
TỶ LỆ / SCALE: 1/50
22100
2
4 2Ø16
1
1
2
2
2
2
1
1
1
1
4500 400
1
1100 Ø8a150
1900 Ø8a200
1100 Ø8a150
1100 Ø8a150
1900 Ø8a200
1100 Ø8a150
400 400
4500 200
9200
3
3
3
3
3
3
4
4
4
4
800 Ø8a150 400
+3.50
Ø8a200
400
B
6
6
3150
3100 X 4 = 12400 3150
1 4Ø16
400
800 Ø8a150
800 Ø8a150
1100 Ø8a200
800 Ø8a150
800 Ø8a150
1150 Ø8a200
800 Ø8a150 400
DẦM DS2A BEAM DS2A
TỶ LỆ / SCALE: 1/50
16900
A
7 2Ø16
5
5
5
5
6
6
6
6
5
5
200
1000 Ø8a150
1450 Ø8a200
600 2200
800 800
2250 800
800 2250
800
B
15 2Ø16
16 2Ø16
17 2Ø16
20 1Ø16 19
1Ø16 18
1Ø16
400
1000 Ø8a150
1000 Ø8a150
1450 Ø8a200
1000 Ø8a150
1000 Ø8a150
1400 Ø8a200
1000 Ø8a150
400
7700
D
200
C
4000
8
8
7
7
7
7
7
7
8
8
7 7
Ø8a150 3
400
1 4Ø16
2Ø16
*
400
1 4Ø16
MẶT CẮT 1-1 SECTION 1-1
TỶ LỆ / SCALE: 1/25
MẶT CẮT 2-2 SECTION 2-2
TỶ LỆ / SCALE: 1/25
400
+3.50
3
15
15
16
16
400 7000
7000 7900
1750 Ø8a150
3100 Ø8a200
1750 Ø8a150
2000 Ø8a150
3500 Ø8a200
2000 Ø8a150 400
22100
2
3 2Ø16
15
15
16
16
16
16
15
15
15
15
9000 400
1
1700
2250 Ø8a150
4100 Ø8a200
2250 Ø8a150 400
200
9200
8
15
15
16
16
1500
200
1750 Ø8a150
3100 Ø8a200
1750 Ø8a150
11 2Ø16
+3.50
12 2Ø16
7 2Ø16
Ø8a150 13
250
11 2Ø16 2Ø16
*
250
11 2Ø16
MẶT CẮT 3-3
SECTION 3-3
TỶ LỆ / SCALE: 1/25
MẶT CẮT 4-4
SECTION 4-4
TỶ LỆ / SCALE: 1/25
Ø8a150 3
400
1 4Ø16
2Ø16
*
400
1 4Ø16
MẶT CẮT 5-5
SECTION 5-5
TỶ LỆ / SCALE: 1/25
MẶT CẮT 6-6
SECTION 6-6
TỶ LỆ / SCALE: 1/25
12
Ø8a150 13
250
11
*
12
250
11
*
MẶT CẮT 7-7
SECTION 7-7
TỶ LỆ / SCALE: 1/25
MẶT CẮT 8-8
SECTION 8-8
TỶ LỆ / SCALE: 1/25
5
5
uPVC Ø90
800 Ø8a150 400
+3.50
Ø8a200
400
B
10
10
3150
3100 X 4 = 12400 3150
1 2Ø16
400
800 Ø8a150
800 Ø8a150
1100 Ø8a200
800 Ø8a150
800 Ø8a150
1150 Ø8a200
800 Ø8a150 400
DẦM DS3 BEAM DS3
TỶ LỆ / SCALE: 1/50
16900
A
7 2Ø16
9
9
9
9
10
10
10
10
9
9
200
400
600 2200
800 1400
4900 1400
B
14 1Ø16 13
2Ø16
400
1800 Ø8a150
3700 Ø8a200
1800 Ø8a150
1000 Ø8a150
1400 Ø8a200
1000 Ø8a150
400
7700
D
200
C
4000
12
12
11
11
11
11
13
13
14
14
13
13
9
9
uPVC Ø90
+3.50
uPVC Ø90
MẶT CẮT 9-9
SECTION 9-9
TỶ LỆ / SCALE: 1/25
MẶT CẮT 10-10
SECTION 10-10
TỶ LỆ / SCALE: 1/25
MẶT CẮT 11-11
SECTION 11-11
TỶ LỆ / SCALE: 1/25
MẶT CẮT 12-12
SECTION 12-12
TỶ LỆ / SCALE: 1/25
Ø8a150 3
250
1 2Ø16 2Ø16
*
250
1 2Ø16
Ø8a150 3
250
1 2Ø16 2Ø16
*
250
1 2Ø16
11
10
Ø8a150 13
250
1
9
10
250
1
14
MẶT CẮT 13-13
SECTION 13-13
TỶ LỆ / SCALE: 1/25
MẶT CẮT 14-14
SECTION 14-14
TỶ LỆ / SCALE: 1/25
2Ø16
2Ø16 2Ø16
2Ø16
2Ø16
1Ø16
2Ø16
2Ø16 1Ø16
2Ø16
2Ø16
1Ø16
Ø8a150 3
300
1 4Ø16
2Ø16
*
300
1 4Ø16
MẶT CẮT 15-15
SECTION 15-15
TỶ LỆ / SCALE: 1/25
MẶT CẮT 16-16
SECTION 16-16
TỶ LỆ / SCALE: 1/25
15
15
CỐT THÉP DẦM DS1,1A,2,2A,3,4 REINFORCED OF BEAM DS1,1A,2,2A,3,4
SỐ LƯỢNG/ QUANTITY: 3CK
SỐ LƯỢNG/ QUANTITY: 2CK
SỐ LƯỢNG/ QUANTITY: 3CK
SỐ LƯỢNG/ QUANTITY: 3CK
SỐ LƯỢNG/ QUANTITY: 1CK
比例:1/50
DS1A梁
DS2A梁
DS3梁
比例:1/50 数量:3
比例:1/50
比例:1/50
比例:1/50
数量:3
数量:2
数量:3
数量:1
比例:1/25
1-1剖面
比例:1/25 比例:1/25
2-2剖面
比例:1/25
比例:1/25 比例:1/25
比例:1/25 比例:1/25
比例:1/25 比例:1/25
16-16剖面 15-15剖面
14-14剖面 13-13剖面
比例:1/25 比例:1/25
比例:1/25 比例:1/25
8-8剖面 7-7剖面
4-4剖面 3-3剖面
Trang 85000
M3-C3
M3-C3
M3-C3
M3-C3
M3-C3
M3-C3
BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
A B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
DK2 DK2
250
+0.20
250
ĐÀ KIỀNG DK1
GROUND BEAM DK1
TỶ LỆ / SCALE: 1/25 21500
4 2Ø14
4500 250
N1
800
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150 250
2Ø14 10
4
4
MẶT BẰNG CĐ:+0.20 PLAN VIEW LEVEL:+0.20
TỶ LỆ / SCALE: 1/100
250
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150
1000 Ø6a150
1975 Ø6a200
1000 Ø6a150
1000 Ø6a150
1850 Ø6a200
1000 Ø6a150
1000 Ø6a150
1925 Ø6a200
1000 Ø6a150
2700
Ø6a150 3
250
1 2Ø16 2Ø14
*
250
1 2Ø16
MẶT CẮT 4-4
SECTION 4-4
TỶ LỆ / SCALE: 1/25
MẶT CẮT 5-5
SECTION 5-5
TỶ LỆ / SCALE: 1/25
Ø6a150 5
250
1 3Ø16 2Ø16
*
250
1 3Ø16
5000
C3
C3
C3
MẶT BẰNG CĐ:+3.50, +2.80 PLAN VIEW LEVEL:+3.50, +2.80
TỶ LỆ / SCALE: 1/100
C4
C3
C3
C4 C4 C4 C4
+4.00
200 120
50
200 100 50
4 BU LÔNG NEO D16; L=500
-250x250x5 -90x90x5
I 200X100X5.5X8
I 200X100X5.5X8
XÀ GỒ C125X50X15X2.5
MÁI TÔN 0,45mm
TOLE 0,45mm
240
1000
1000
1000
1000
1000
MẶT CẮT A-A SECTION A-A
TỶ LỆ / SCALE: 1/25
5000
MẶT BẰNG MÁI
PLAN VIEW OF ROOF
TỶ LỆ / SCALE: 1/100
-250x250x5
1
REFER DETAIL XEM CHI TIẾT
CHI TIẾT
TỶ LỆ / SCALE: 1/10
DETAIL
1
I 200X100X5.5X8
I 200X100X5.5X8
4 BU LÔNG NEO D16; L=500
DẦM DM DẦM DM DẦM DM DẦM DM
DẦM DM
DẦM DM
PURLIN C125X50X15X2.5
XÀ GỒ C125X50X15X2.5 PURLIN C125X50X15X2.5
200 300
MÁI TÔN 0,45mm
TOLE 0,45mm
+0.20 200
200
3 2Ø16
100
400
1200 Ø6a150
2400 Ø6a200
1200 Ø6a150
3200
4900
6
6
6
6
7
7
4
4
4
4
4
4
4
4
4
4
5
5
5
5
5
5
5
5
5 5
MẶT CẮT 6-6
SECTION 6-6
TỶ LỆ / SCALE: 1/25
MẶT CẮT 7-7
SECTION 7-7
TỶ LỆ / SCALE: 1/25
ĐÀ KIỀNG DK2 GROUND BEAM DK2
200
LỚP GROUTING DÀY 50 MM LAYER GROUTING 50 THICK
CỐT THÉP ĐÀ KIỀNG DK1,2, MÓNG M3 REINFORCED OF BEAM DK1,2, FOUNDATIONM3
DẦM DM BEAM DM
TỶ LỆ / SCALE: 1/25
C4
3 Ø12a200
4 Ø12a200
DK2
DK2
MẶT CẮT 8-8 SECTION 8-8
TỶ LỆ / SCALE: 1/25 2100
MẶT CẮT 9-9 SECTION 9-9
TỶ LỆ / SCALE: 1/25
5000
400
3
400
4
THÉP TẤM DÀY 0.1MM BẮN VÍT STEEL PLATE 0.1MM SCREW
BẮN VÍT SCREW 250
STEEL GUTTER 0.1mm THICK MÁNG XỐI TÔN DÀY 0.1MM
STEEL PLATE 450x40x5 THÉP TẤM 450x40x5
Ø110 PVC DOWNSPOUT AT AXIS N1~N6 ỐNG THOÁT NƯỚC MƯA PVC Ø110 TẠI TRỤC N1~N6
800
800 Ø6a150
250
250
4500 250
N1
800
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150 250
2Ø14 6
4
4
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150
2700
4500
4
4
4
4
5
5
5
5
+0.20
ĐÀ KIỀNG DK3
GROUND BEAM DK3
TỶ LỆ / SCALE: 1/25
2Ø16 2 1000
MƯƠNG 200X300
DRAIN 200X300
HỐ BƠM 1000X1000X450
PUMPIT 1000X1000x450
CỘT C3, C4, LANH TÔ XEM BV STR-1308 / COLUMN C3, C4, LINTEL, OVERHANG SEE STR-1308
uPVC Ø125
250
200
4500 250
N1
800
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150 250
2Ø14 6
4
4
1100 Ø6a150
1925 Ø6a200
1100 Ø6a150
2800
4500
4
4
4
4
5
5
5
5
+0.20
ĐÀ KIỀNG DK3A
GROUND BEAM DK3A
TỶ LỆ / SCALE: 1/25
2Ø16 2
3 uPVC Ø125
DK4
Ø6a200 3
250
1 2Ø14
250
1 2Ø14
TỶ LỆ / SCALE: 1/25
ĐÀ KIỀNG DK4 GROUND BEAM DK4
TỶ LỆ / SCALE: 1/25
ĐÀ KIỀNG DK5 GROUND BEAM DK5
TỶ LỆ / SCALE: 1/25
200
140 400
200
100
200
240
7 5Ø8
8 Ø10a200
50
N6
N1 N2 N3 N4 N5
N6
N1 N2 N3 N4 N5
N6
N1 N2 N3 N4 N5
250
比例:1/100
比例:1/100
比例:1/100
屋面平面
DM梁 DM梁 DM梁 DM梁 DM梁 DM梁
DM梁
比例:1/100
比例:1/25
泵井
水沟
C3,C4柱,压梁见STR-1308图纸
檩条
浪板
檩条
见细节
浪板
打螺丝 0.1mm厚天沟 钢板
在N1~N6轴线PVC排水管
50mmGROUTING层 4粒锚固螺栓
4粒锚固螺栓
DK3地梁 DK1地梁
DK3A地梁
长度L=1450 长度L=2450
比例:1/25 比例:1/25
Trang 94Ø14 Ø6
250
3
2
+2.80
CẤU KIỆN
LT1
TIẾT DIỆN-TỶ LỆ: 1/25
200
1
2
6Ø12
Ø6a200
600 200
2
1
Ø6a200
Ø8a150 SECTION-SCALE: 1/25
+2.80 OV2
CAO ĐỘ LEVEL ITEM
CÐ
LINTEL, OVERHANG LANH TÔ, Ô VĂNG
1250 Ø6a200
+3.50
+4.75
1 4Ø14
MẶT CẮT 4-4 SECTION 4-4
TỶ LỆ / SCALE: 1/25
4Ø14 Ø6
250
2
1
MẶT CẮT 5-5 SECTION 5-5
TỶ LỆ / SCALE: 1/25
VÁCH BỂ WALL OV1
ĐÀ KIỀNG
2 4Ø14
Ø6a200 3
+0.00
+4.00
1000
350
CỐT THÉP CỘT C4
REBAR OF COLUMN C4
TỶ LỆ / SCALE: 1/25
CỐT THÉP CỘT C3
REBAR OF COLUMN C3
TỶ LỆ / SCALE: 1/25
1 4Ø14
MẶT BẰNG THANG ST1
STAIR PLAN ST1
TỶ LỆ / SCALE: 1/25 6350
-A
A
6350
±0.00
+3.50
250
Ø8a200
Ø8a200 2 Ø12a120
DCT1
Ø12a120 5
Ø8a200 6 DCT1
DCT1
MẶT CẮT A-A SECTION A-A
TỶ LỆ / SCALE: 1/25
Ø12a200 1 Ø8a200
2
100
100
Ø12a200 1 Ø8a200
2
Ø12a120 3
Ø8a200 4
BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
THANG ST1 STAIR ST1
1 3Ø16
2 2Ø12 Ø6a150
A
DẦM DCT1 BEAM DCT1
TỶ LỆ / SCALE: 1/50
3
3Ø16 1
2Ø12 2
Ø6a150 3
200
MẶT CẮT 3-3 SECTION 3-3
TỶ LỆ / SCALE: 1/50
SỐ LƯỢNG/ QUANTITY: 5CK
250
3
A
A
MB MƯƠNG THU NƯỚC RỬA NGƯỢC LOẠI 1
PLAN PUMP PIT TYPE 1
TỶ LỆ / SCALE: 1/50
B
B
3400
3
+3.50
MẶT CẮT A-A SECTION A-A
TỶ LỆ / SCALE: 1/25
THÉP NẮP REBAR OF SLAB
Ø12a200
a
Ø12a150
b
Ø12a200 a
Ø12a150 b
Ø12a200 a
Ø12a200 d
+3.50
Ø12a200
c
Ø12a150
b
THÉP NẮP REBAR OF SLAB
Ø12a200 c
Ø12a150 b
150
150
MẶT CẮT B-B SECTION B-B
TỶ LỆ / SCALE: 1/25
50 100
1300
3
CỐT THÉP MƯƠNG REBAR OF DRAIN
TỶ LỆ / SCALE: 1/25
THÉP NẮP REBAR OF SLAB
Ø12a200
c
Ø12a150
b Ø12a200 c
Ø12a150 b
+3.50
C DÀI / LENGTH; L=8090MM
比例:1/50
第一种类反冲洗收水沟平面
比例:1/25
比例:1/50
比例:1/25
比例:1/25
比例:1/25
B-B剖面
A-A剖面
C3柱钢筋
C4柱钢筋
比例:1/25
比例:1/25 比例:1/25
比例:1/50 比例:1/50
数量:5
ST1楼梯平面
地梁 盖板钢筋
盖板钢筋
比例:1/25
长度L=8090mm
水沟钢筋
盖板钢筋
池壁
DCT1梁
比例:1/25 高度
构件
压梁,雨棚
Trang 101 250 1500 16 1750 4 392 686 1082.74
MÓNG M1 SL: 98
MÓNG M2 SL: 15
MÓNG M3 SL: 20
CỘT C1 SL: 30
CỘT C2 SL: 5
GC
200
200
GC1
200
200
X
200
200
GC
200
200
GC1
200
200
BAR BENDING SCHEDULE / BẢNG THỐNG KÊ CỐT THÉP
TÊN
C.KIỆN
SỐ
HIỆU
KÍNH (mm)
CHIỀU DÀI
1 THANH (mm)
SỐ LƯỢNG 1
TỔNG CHIỀU DÀI (m)
TỔNG T.LƯỢNG (Kg) (mm)
(mm)
LENGTH
OF BAR (mm)
QUANTITY 1 UNIT
TOTAL LENGTH (m)
TOTAL WEIGHT (Kg) (mm)
SUB TOTAL
BAR BENDING SCHEDULE / BẢNG THỐNG KÊ CỐT THÉP
TÊN C.KIỆN
SỐ HIỆU
KÍNH (mm)
CHIỀU DÀI
1 THANH (mm)
SỐ LƯỢNG 1
TỔNG CHIỀU DÀI (m)
TỔNG T.LƯỢNG (Kg) (mm)
(mm)
LENGTH
OF BAR (mm)
QUANTITY 1 UNIT
TOTAL LENGTH (m)
TOTAL WEIGHT (Kg) (mm)
SUB TOTAL
GC
200
200
GC1
200
200
X
200
200
GC
200
200
GC1
200
200
X
200
200
GC
200
200
GC1
200
200
X
200
200
DẦM DS1 SL: 4
DẦM DS2 SL: 3
DẦM DS3 SL: 1
DẦM DS4 SL: 1
DK1 SL: 1
DK2 SL: 4
DK3,3A SL: 2
DK5 SL: 1
DK4 SL: 1
CỘT C3 SL: 6
CỘT C4 SL: 6
LT1 SL: 1
LT2 SL: 1
OV1 SL: 1
OV2 SL: 1
RỐN THU SL: 3
KHE CO GIẢN SL: 1
MƯƠNG SL: 1
BAR BENDING SCHEDULE / BẢNG THỐNG KÊ CỐT THÉP
TÊN C.KIỆN
SỐ HIỆU
KÍNH (mm)
CHIỀU DÀI
1 THANH (mm)
SỐ LƯỢNG 1
TỔNG CHIỀU DÀI (m)
TỔNG T.LƯỢNG (Kg) (mm)
(mm)
LENGTH
OF BAR (mm)
QUANTITY 1 UNIT
TOTAL LENGTH (m)
TOTAL WEIGHT (Kg) (mm)
SUB TOTAL
BAR BENDING SCHEDULE / BẢNG THỐNG KÊ CỐT THÉP
TÊN C.KIỆN
SỐ HIỆU
KÍNH (mm)
CHIỀU DÀI
1 THANH (mm)
SỐ LƯỢNG 1
TỔNG CHIỀU DÀI (m)
TỔNG T.LƯỢNG (Kg) (mm)
(mm)
LENGTH
OF BAR (mm)
QUANTITY 1 UNIT
TOTAL LENGTH (m)
TOTAL WEIGHT (Kg) (mm)
SUB TOTAL
ĐƯỜNG KÍNH / DIAMETER Ø (MM) CHIỀU DÀI / LENGTH (M) KHỐI LƯỢNG / WEIGH(KG) TỔNG KHỐI LƯỢNG / TOTAL WEIGH (KG)
BẢNG TỔNG HỢP CỐT THÉP / BAR BENDING SUMMARY
6 2430.3 539.4
8 4783.4 1887.5
10 2126.3 1310.9
12 24256 21534.8
14 49058 59282.4
16 27220.3 42962.8
18 1608 3212.1 130729.9
BỂ WT104_2, 106_2, 107_2 TANK WT 104_2, 106_2, 107_2
NHÀ THẦU CHÍNH - MAIN CONTRACTOR
CTY TNHH KOBELCO ECO-SOLUTIONS
VIỆT NAM
ĐỊA CHỈ - ADDRESS:
Lô I-1, KCN Long Đức, Xã Long Đức, Huyện Long Thành, Đồng Nai Lot I-1, Long Duc Industrial Park, Long Duc Commune,
Long Thanh District, Dong Nai
THẦU PHỤ - SUB-CONTRACTOR:
DỰ ÁN - PROJECT
S.POWER VIET NAM (TEXTILE) LTD.
ĐỊA ĐIỂM - LOCATION:
HẠNG MỤC - ITEM:
TÊN BẢN VẼ - DRAWING NAME:
A B C D
THIẾT KẾ - DESIGNER:
CHỦ TRÌ THIẾT KẾ XD - CIVIL MANAGER:
TỔNG GIÁM ĐỐC - GENERAL DIECTOR:
GIÁM ĐỐC - DIECTOR:
WASTE WATER TREATMENT SYSTEM
MÃ DỰ ÁN - ORDER NUMBER:
BẢN VẼ THIẾT KẾ KỸ THUẬT DETAIL ENGINEERING DRAWING
CHỦ ĐẦU TƯ - INVESTOR:
S.POWER VIET NAM (TEXTILE) JOINT STOCK COMPANY
ĐỊA CHỈ - ADDRESS:
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric
CÔNG TY TNHH DỆT MAY S.POWER
VIỆT NAM
Tỉnh Tây Ninh Tay Ninh Province
CAPACITY: 5000 M3/DAY WATER TREATMENT SYSTEM CAPACITY: 6000 M3/DAY
Lô A13, Đường C1, KCN Thành Thành Công, Xã An Hòa, Huyện Trảng Bàng Lot A13, C1 Road, Thanh Thanh Cong IP, An Hoa commune, Trang Bang Distric Tỉnh Tây Ninh
Tay Ninh Province
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG THÀNH VŨ
ĐỊA CHỈ - ADDRESS:
Lầu 6, Tòa nhà Orchard Garden, 128 Đường Hồng Hà, Phường 9, Quận Phú Nhuận, Thành Phố Hồ Chí Minh
Floor 6, Orchard Garden Building, 128 Hong Ha Street, Ward 9, Phu Nhuan District, Ho Chi Minh City
NGUYỄN VĂN THANH
LÊ HUY CƯỜNG PHẠM THÀNH CHUNG
18O023
MỤC ĐÍCH PHÁT HÀNH PURPOSE ISSUED
TRÌNH DUYỆT - APPROVING THẨM KẾ - VERIFYING THI CÔNG - EXECUTING HOÀN CÔNG - AS BUILT
TỔNG GIÁM ĐỐC - GENERAL DIRECTOR:
QUẢN LÝ DỰ ÁN - PROJECT MANAGER:
KIỂM TRA - CHECK BY:
NOBUYUKI TATEKO
VŨ QUANG ĐÔNG
CAO MẠNH SINH
GIÁM ĐỐC KỸ THUẬT - TECHNCAL DIRECTOR
SHIGERU NAKAGAWA
- LEVEL +0.0 IN THE DRAWING IS THE FINISHED LEVEL OF TREATMENT SYSTEM’S PAVEMENT
- CAO ĐỘ +0.0 TRONG THIẾT KẾ LÀ CAO ĐỘ HOÀN THIỆN VĨA HÈ KHU XỬ LÝ
- ALL STRUCTURAL DRAWING SHALL BE USED IN CONJUNCTION WITH ARCHITECTUAL
- TOÀN BỘ BẢN VẼ KẾT CẤU PHẢI ĐƯỢC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, CÔNG NGHỆ, ĐIỆN PROCESS, ELECTRICAL DRAWING
THỐNG KÊ THÉP BAR BENDING SCHEDULE