Title Subject Co SUNNY Kumkang Kind Kumkang Kind Bldg.. The moment of setting Kumkang Climbing system, Customer to provide safe means of access to all platforms Only workers detailed ins
Trang 1Title
Subject
Co
SUNNY
Kumkang Kind Kumkang Kind Bldg 1445-2,
Fax : 02-565-4466 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-3415-4000
Customer to be responsible for correct cast in anchor position (refer Anchoring plan drawing) Only provided anchors to be used as per design
Always screw the stop-anchor all the way into the universal climbing cone, until it is fully engaged (check against depth-mark)
, cho t
All measrements in mm
T Without exception, Main profile need to be safely guided in min 2 shoes
The moment of setting Kumkang Climbing system, Customer to provide safe means
of access to all platforms
Only workers detailed instructed by Kumkang supervisor are allowed to operate the climbing system
Ch leo
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages
This drawing must not be communicated neither to third parties not to competitor companies Subject to technical alterations
Constructors have to examine special stiffeners of additional steel bars and floor posts according to reaction values submitted
Trang 2Customer to be responsible for correct cast in anchor position (refer Anchoring plan drawing) Only provided anchors to be used as per design
Always screw the stop-anchor all the way into the universal climbing cone, until it is fully engaged (check against depth-mark)
, cho t
All measrements in mm
T Without exception, Main profile need to be safely guided in min 2 shoes
The moment of setting Kumkang Climbing system, Customer to provide safe means
of access to all platforms
Only workers detailed instructed by Kumkang supervisor are allowed to operate the climbing system
Ch leo
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages
This drawing must not be communicated neither to third parties not to competitor companies Subject to technical alterations
Constructors have to examine special stiffeners of additional steel bars and floor posts according to reaction values submitted
Project
Title
Subject
Co
SUNNY
Kumkang Kind Kumkang Kind Bldg 1445-2,
Fax : 02-565-4466 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-3415-4000
Trang 3Customer to be responsible for correct cast in anchor position (refer Anchoring plan drawing) Only provided anchors to be used as per design
Always screw the stop-anchor all the way into the universal climbing cone, until it is fully engaged (check against depth-mark)
, cho t
All measrements in mm
T Without exception, Main profile need to be safely guided in min 2 shoes
The moment of setting Kumkang Climbing system, Customer to provide safe means
of access to all platforms
Only workers detailed instructed by Kumkang supervisor are allowed to operate the climbing system
Ch leo
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages
This drawing must not be communicated neither to third parties not to competitor companies Subject to technical alterations
Constructors have to examine special stiffeners of additional steel bars and floor posts according to reaction values submitted
Project
Title
Subject
Co
SUNNY
Kumkang Kind Kumkang Kind Bldg 1445-2,
Fax : 02-565-4466 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-3415-4000
Trang 4Customer to be responsible for correct cast in anchor position (refer Anchoring plan drawing) Only provided anchors to be used as per design
Always screw the stop-anchor all the way into the universal climbing cone, until it is fully engaged (check against depth-mark)
, cho t
All measrements in mm
T Without exception, Main profile need to be safely guided in min 2 shoes
The moment of setting Kumkang Climbing system, Customer to provide safe means
of access to all platforms
Only workers detailed instructed by Kumkang supervisor are allowed to operate the climbing system
Ch leo
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages
This drawing must not be communicated neither to third parties not to competitor companies Subject to technical alterations
Constructors have to examine special stiffeners of additional steel bars and floor posts according to reaction values submitted
Project
Title
Subject
Co
SUNNY
Kumkang Kind Kumkang Kind Bldg 1445-2,
Fax : 02-565-4466 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-3415-4000
Trang 5Customer to be responsible for correct cast in anchor position (refer Anchoring plan drawing) Only provided anchors to be used as per design
Always screw the stop-anchor all the way into the universal climbing cone, until it is fully engaged (check against depth-mark)
, cho t
All measrements in mm
T Without exception, Main profile need to be safely guided in min 2 shoes
The moment of setting Kumkang Climbing system, Customer to provide safe means
of access to all platforms
Only workers detailed instructed by Kumkang supervisor are allowed to operate the climbing system
Ch leo
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages
This drawing must not be communicated neither to third parties not to competitor companies Subject to technical alterations
Constructors have to examine special stiffeners of additional steel bars and floor posts according to reaction values submitted
Project
Title
Subject
Co
SUNNY
Kumkang Kind Kumkang Kind Bldg 1445-2,
Fax : 02-565-4466 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-3415-4000