PROJECTSCALE DATE : DRAWING TITLEISSUED FOR TENDER APPL CONST AS-BUILT DATE : REPRESENTATIVE OF CLIENT ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4 SOUTH LIGHT CONSTRUCTION CONSULTAN
Trang 1ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4, AN PHU WARD, DISTRICT 2
HO CHI MINH CITY, VIET NAM
Trang 2PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
S-G-DWL
DRAWING LIST
2017.04.15
Trang 3(SHOWN ON CALCULATING REPORTS
ALL DIMENSIONS ARE IN MILIMET (mm) ALL LEVELS ARE IN MET (m)2
ALL LEVELS ARE TOP OF CONCRETE LEVELS (+SL) FINISHED LEVELS (+FL)ARE SHOWN ON ARCHITECT DRAWINGS
3
THE FOLLOWING DETAILS ARE SHOWN ON ARCHITECT DRAWINGS:
- SIZES AND LOCATIONS OF ALL DOOR AND WINDOW OPENINGS
- SIZES AND LOCATIONS OF ALL INTERIOR AND EXTERIOR NON-BEARINGPARTITIONS
- SIZES AND LOCATIONS OF ALL CONCRETE CURBS, FLOOR DRAINS,SLOPES, DEPRESSED AREAS, CHANGES IN ELEVATION, CHAMFERS,GROOVES, INSERTS
- SIZES AND LOCATIONS OF ALL FLOOR AND ROOF OPENINGS
- FLOOR AND ROOF FINISHES
- LOCATIONS OF CONCRETE SURFACE FINISH TYPES, S DIRECTIONS,EDGE TOOLING, NON-SLIP PARTICLES, HARDENERS, SEALERS AND OTHERAPPLIED COATINGS
- STAIR FRAMING AND DETAILS
- DIMENSIONS WHERE SHOWN ON STRUCTURAL DRAWINGS, SHALL BEVERIFIED WITH ARCHITECTURAL DRAWINGS
- FINISH DETAILS AT SLAB EDGES AND DIMENSIONS OF ROUGHOPENINGS AND FINISHED OPENINGS
- EXTERIOR/INTERIOR WINDOW WALL AND GLAZING FRAMING, SUPPORTAND CONNECTION DETAILS
- ELEVATOR DETAILS, DIMENSIONS, CLEARANCES
- HOUSEKEEPING PAD SIZES AND LOCATION
- FIRE PROOFING REQUIREMENTS FOR STRUCTURAL STEELWORK ANDMETAL DECK
5
THE FOLLOWING DETAILS ARE SHOWN ON MEP DRAWINGS:
- PIPES/DUCTS, HOOKS, GUTTERS, OPENINGS ON WALLS/SLABS
- CONDUITS, BOXES, OUTLETS ON WALLS OR SLABS, CONCRETEINSERTS FOR ELECTRICAL, MECHANICAL, OR PLUMBING FIXTURES
- SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHORBOLTS FOR MOTOR MOUNTS PAD SIZES AND LOCATIONS SHALL BECONFIRMED DURING SHOP DRAWING PROCESS
6
STRUCTURE DRAWINGS & SPECIFICATIONS REPRESENT THE FINISHEDSTRUCTURE, BUT DO NOT INDICATE THE METHOD OF CONSTRUCTION THEAUTHOR'S SUPERVISION DOESN'T INCLUDE ABOVE WORKS
SITE WORKS MUST COMPLY WITH CURRENT CODES FOR CONSTRUCTION &
CERTIFICATION WORKS IN RESPECT WITH CURRENT DESIGN CODES(ACCEPTABLE IN VIETNAM)
TIGHTLY COOPERATION BETWEEN SECTORS (ARCHITECT, STRUCTURE, MEP ) IS REQUIRED IN CONSTRUCTING PIPES/DUCTS, SLEEVES, INSERTS TOPREVENT DRILLING + CHIPPING INTO STRUCTURE MEMBERS
- LOCATION OF MEMBERS: IN LAYOUTS
- SIZE OF MEMBERS: IN DETAILS OR SECTIONS
- REBAR PARAMETERS (DIAMETERS, NOS, SPACINGS): CONFIRMED BYTHE DESIGNERS
- SHAPES & DIMENSION OF REBARS: IN DETAILS4
CONCRETE CURING IS STRICTLY REQUIRED IN CONCRETE WORKS
6
AT JOINTS BETWEEN COLUMNS/RC-WALLS AND BEAMS/SLABS , GRADE OFCONCRETE IS THE BIGGEST GRADE OF THESE MEMBERS (AT JOINTS) INTHESE ZONES, CONCRETE WORKS & COMPACTING WORKS MUST BECAREFULLY
STARTER BARS D6@500 ARE PUT IN COLUMNS TO CONNECT TO BRICK WALLS
ANCHOR LENGTH IN COLUMNS IS >=200mm, >=600mm IN BRICK WALLS;
BENT-UP AT 2 ENDS
- 100mm WALL: 01 LEG
- 200mm WALL: 02 LEGS10
D - RULES FOR CONSTRUCTION
C - RULES FOR DRAWINGS
I - DESIGE CODES:
II - MATERIAL UNIT WEIGHT:
(SHOWN ON CALCULATING REPORTS
III - LIVE LOADS:
(SHOWN ON CALCULATING REPORTS
2 IN CASE THAT THERE ARE CONFLICTS AMONG RULES & DETAILS
IN GENERAL DRAWINGS & OTHER DETAILED DESIGN DRAWINGS,THE ORDER OF PRECEDENCE IS DETAILED DESIGN DRAWINGS:
3 BESIDE SPECIFIED RULES IN DESIGN DOCUMENTS,OTHER WORKS NEED TO CONFORM TO RELATINGCURRENT CODES/RULES
CFA PILES/DIAPRAGM WALL
CAPPING BEAMS (IF ANY)(IF ANY)
FOOTINGS / PILE CAPS
COLUMNS / WALLS(CONTACT TO SOIL/WATER)
COLUMNS / WALLS
BEAMS / SLABS(CONTACT TO SOIL/WATER)
BEAMS / SLABS
STAIR CASES / RAMPS
TANKS
OTHER MEMBERS(CONTACT TO SOIL/WATER)
OTHER MEMBERS
2 - REBAR:
DIAMETER GRADE
3 - PRESTRESSED TENDONS/CABLES: (IF ANY)
(SHOWN ON DETAILED DRAWINGS)
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
Trang 4- NOT COVERED WITH FINISH LAYERS 35 55 25
TABLE OF COVER c (mm)
c s
s >= MAX (25mm, 1.5D)
E - GENERAL DETAILS
I - COVER + REBAR SPACING:
III - ANCHOR LENGTH + LAP LENGTH:
16
61
>
e
1 AT TENSIVE ZONE:
- FOR ROD BARS (AI, CI):
- FOR DEFORMED BARS (AII, CII ):
2 AT COMPRESSIVE ZONE:
- FOR ROD BARS (AI, CI):
- FOR DEFORMED BARS (AII, CII ):
D: REBAR DIAMETER (SMALLER REBAR)
II - BENDS & HOOKS OF REBAR:
D 4D: FOR LINKS, STIRRUPS, HOOPS
6D: FOR THE OTHERS
X = Lneo1: FOR BEAMS WITH SOIL/WATER PRESSURE
X = Lneo2: FOR THE OTHERS
VI - FRAME JOINT DETAILS:
SLAB THICKNESS ADDITIONAL REBARS
D16
Hs (mm)
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
GENERAL DETAILS
S-G-02
2017.04.15
Trang 5TYPICAL DETAIL OF COLUMN
(Scale)(Member quantity)
(Scale)(Member quantity)
+Bottom level+Top level
TYPICAL DETAIL OF RC WALLS + CORES
tw: wall thickness
Lneo1: anchor length for tensive rebars
c: covers (shown on "General notes" dwgs)
OPENING DETAIL OF RC WALLS + CORES
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
X1 B1
Wo
OPENINGOPENING
Trang 6L1/6L3
at left support)
B1
(Bottom main bars)
(Top main bars)
B2~
T1
T2~
(C-Walls/Cols/Beams)(TOP LAYERS)
L2/4
(Links @100)
L B2~
B1
B1
(Bottom main bars) B2~
at right support)(Additional Bars
B1
T1
B2~
L S
(Member name)
(Scale)
(Clearance length) (Member quantity)
(Width of first support) (Width of last support)
(Add T2~ (Rebar data, length) at middle of span -) (Add B2~ (Rebar data, length) at supports -)
L/2 L/2
L=B+2HD8@50
L=B+HD10@50
HB
H
H/2B
H/2
ADDITIONAL LINKS FOR BEAM
DETAIL OF ADDITIONAL LINKS (AT INTERSECTIONS)
L1, L2, L3: spans of beam (clearance between 02 supports)
Level: top level of beamsBd: width of beamsHd: height of beams
Lneo1: anchor length for tensive rebars
D: rebar diameter (for smaller rebar)
c: covers (shown on "General notes" dwgs)
REBAR ANCHOR FOR DROP - OFF BEAMS
Note: link diameters are shown on cross section details of beams
REBAR ANCHOR FOR BENDED BEAMS
Note: link diameters are shown on cross section details of beams
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
TYPICAL DETAILS OF GROUND BEAMS
S-G-04
2017.04.15
Trang 7at left support)
T1
(Top main Bars)
(Bottom main Bars)
S
(Side bars)(C-Walls/Cols/Beams)
at middle of span)(Additional Bars
B2~
at middle of span)(Additional Bars
TYPE 3 - (CANTILEVER)
L2
L2/6L2/6
at left support)
T1
(Top main Bars)
(Bottom main Bars)
S
(Side bars)
at middle of span)(Additional Bars
Lneo1
Lneo1Lneo2
L
Lneo1
Lneo1Lneo2
TYPE 2 - (1-SPAN BEAM)
T1
B1
T2~
L S
(Level)(Level)
(Member name)
(Scale)
(Clearance length) (Member quantity)
(Width of first support) (Width of last support)
SECTION 2-2 SECTION 1-1
L1
L1
SUB BEAM
DIAGRAM + ADDITIONAL REBAR ARRANGMENT
(Add B2~ (Rebar data, length) at middle of span -) (Add T2~ (Rebar data, length) at supports -)
L/2 L/2
L=B+2HD8@50
L=B+HD10@50
HB
H
H/2B
H/2
ADDITIONAL LINKS FOR BEAM
DETAIL OF ADDITIONAL LINKS (AT INTERSECTIONS)
L/2H
2D16 (Bd<=500)4D16 (Bd>500)
2D12 (Bd<=500)4D12 (Bd>500)
L1, L2, L3: spans of beam (clearance between 02 supports)
Level: top level of beamsBd: width of beamsHd: height of beams
Lneo1: anchor length for tensive rebars
D: rebar diameter (for smaller rebar)
c: covers (shown on "General notes" dwgs)
REBAR ANCHOR FOR DROP - OFF BEAMS
Note: link diameters are shown on cross section details of beams
REBAR ANCHOR FOR BENDED BEAMS
Note: link diameters are shown on cross section details of beams
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
TYPICAL DETAILS OF CONVENTIONAL BEAMS
S-G-05
2017.04.15
Trang 8Ln/4Ln/4
1 LAYOUT OF UNIFORM ARRANGMENT:
I - LAYOUTS - SECTIONS OF TYPICAL SLABS WITH BEAMS:
(ONLY REBAR POSITION & ARRANGMENT SHOWN, OTHER DATA SHOWN ON REBAR ARRANGMENT LAYOUTS FOR EACH STORY)
Lneo1: anchor length for tensive rebars
D: rebar diameter (for smaller rebar)Lneo2: anchor length for compressive rebars
@1000x1000With c: cover
Lneo1
Lneo1Hs
HsLneo1
Lneo2
Lneo2
Lneo2
AXB-1XB-1
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
S-G-06
TYPICAL DETAILS OF CONVENTIONAL SLABS
2017.04.15
Trang 9II - LAYOUTS - SECTIONS OF TYPICAL FLAT SLABS:
(ONLY REBAR POSITION & ARRANGMENT SHOWN, OTHER DATA SHOWN ON REBAR ARRANGMENT LAYOUTS FOR EACH STORY)
TL:1/20
(Shear rebar)
DETAIL OF TYPICAL COLUMN CAPS
(SHEAR REBAR IS NOT NECESSARY IN BEAMS/COLUMNS/RC WALLS)
@1000x1000With c: cover
Lneo1
Lneo1Hs
HsLneo1
c: covers (shown on "General notes" dwgs)
Lneo1: anchor length for tensive rebars
D: rebar diameter (for smaller rebar)Lneo2: anchor length for compressive rebars
X1 ALONG X-DIRECTION:
1 LAYOUT OF UNIFORM ARRANGMENT:
2 LAYOUT OF ADDITIONAL REBARS:
XB-1
YB-1AXB-1
AYB-1
YB-1
XB-1AYB-1
AXB-1
3 SECTIONS::
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
S-G-07
TYPICAL DETAILS OF FLAT SLABS
2017.04.15
Trang 10SIKA HYDROTITE(Level)
L50x5
Lneo1
HsXb
H1D10@200
D10@200
YT1
XT1D10@200
D10@200 YB1
XB1D10@200
V1D10@200
V1D10@200
H1D10@200
XB1D10@200
DETAIL OF DRAINAGE:
100
G12D10
100x100x200SUPPORT AT CORNERS
Lneo1Lneo1
AT DIAPHRAGM WALL/BASEMENT WALL:
100x100x200SUPPORT AT CORNERS
XB1D8@200
D8@200YB1
XB1D8@200XT1 D8@200
DETAIL OF WATERPROOFING FOR CONSTRUCTION JOINT:
Bm
Lneo1Lneo1
(ACROSS BEAM)(Level)
- SUM PIT PARAMETERS:
Xb, Yb: length along each direction(shown on architect & MEP drawings)
Hs: slab thickness (at sum pit position)
Rebar info: (shown on slab rebars at drainage position) Hm: depth of drainage
- DRAINAGE PARAMETERS:
Bm: width of drainage(shown on architect & MEP drawings)
Hs: slab thickness (at drainage position)(Xb, Yb <= 1000mm) (Xb, Yb <= 1000mm)
H1D6@200
H1D6@200
V1D10@200
(Hole dia.) (Hole depth) (Type of glue) Note
SCHEDULE OF REBAR DRILLED HOLES
100
50
(t=2mm)Steel bar
DWG.No.
PROJECTSCALE
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
S-G-08
TYPICAL DETAILS OF OTHER MEMBERS (1)
2017.04.15
Trang 11LINTEL + WINDOW BOTTOM (ON ELEVATION)
Refer to lintel detail
+Top of window
DETAIL OF MEP GAINS
WIDTH OF DOOR/WINDOW PARAMETER OF LINTEL
D12
DETAIL OF ATTACHED COLUMN
L 1
D6@2004D12
200
1 L
100
D6@2002D12
(For 200mm thk wall)(For 100mm thk wall)
DETAIL OF WALL BRACING
L 1
D6@2004D12
200
1 L
100
D6@2002D12
(For 200mm thk wall)(For 100mm thk wall)
DETAIL OF WINDOW BOTTOM
L 1
D6@2004D12
200
1 L
100
D6@2002D12
(For 200mm thk wall)(For 100mm thk wall)
+Bot of window +Bot of window
WW
350350
DETAIL OF LINTEL
L 1
100
2D (For 200mm thk wall)(For 100mm thk wall)
+Top of window +Top of window
1
D6@150
L
Hlt (mm)
W (m)
<= 2.5m 200
D16 D6@150 2.5m <W<= 3.5m 200
2D16 (W<=3.0m)
D16 D6@150 3.5m <W<= 4.5m 300
D16 D6@120 4.5m <W<= 5.5m 400
D16 D8@150 5.5m <W<= 6.5m 500
Lov (m)
<= 0.5m 50
D6@300 0.5m <Lov<= 0.7m 60 D8@200
D20 D8@120 6.5m <W<= 8.0m 600
D6@300 0.7m <Lov<= 0.9m 70 D8@150
D6@300 0.9m <Lov<= 1.2m 80 D8@100
D6@300 1.2m <Lov<= 1.5m 90 D10@150
1D AT JOINT WITH BEAM/COLUMN/RC WALL
SLAB THICKNESS PARAMETER OF GAINS
D16
T1
Hg (mm)
Hs (mm)
D20 200<= Hs < 300 MIN(400,Hd) D20 D6@200 3D20@100
300<= Hs = Hs 2x3D25@100
200
T1
L B1
G-2 (200xHg)
(For 200mm thk wall)
+Top of slabWith Hd: depth of beam connected to gains
SLAB THICKNESS PARAMETER OF GAINS
D20
T1
Hg (mm)
Hs (mm)
D25 MIN(600,Hd) D16 D10@100 3D20@100
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
S-G-09
TYPICAL DETAILS OF OTHER MEMBERS (2)
2017.04.15
Trang 12DETAIL OF LIFT CASE
WITH RC WALLS
KD20
SLAB
H1D8@200
V1D10@200
D10@200
YT1
XT1D10@200
D10@200 YB1
XB1D10@200
KD10
@1000x1000
KD20
D10@200 YB1
XB1D10@200
200
T1
L B1
Hp: depth of lift pit
- LIFT PIT PARAMETERS:
X, Y: length along each direction(shown on architect & MEP drawings)
IV - OTHER DETAILS - (3):
D10@200
YT1
XT1D10@200200
X (< Y)
D10@200 YB1
XB1D10@200
200
H1D8@200
V1D10@200
K D10
@1000x1000
Hp: depth of escalator pit
- ESCALATOR PIT PARAMETERS:
X, Y: length along each direction(shown on architect & MEP drawings)
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
TYPICAL DETAILS OF OTHER MEMBERS (3)
S-G-10
2017.04.15
Trang 13Dp (mm)
420
Di (mm)
90
Tbt (mm)
STANDARD BENDING MOMENT
12
h (mm)
3
hw1 (mm) (mm) (nos)
6
L2 (mm)
1000 16
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
TAKAYUKI MATSUO
1200
+Toe of pile +Toe of bored hole
+Existing ground
DETAIL OF BORED PRECAST PILE
(TEST PILE), Q.T: 01 PILES
DETAIL OF BORED PRECAST TEST PILE (D600)
+1.77 (NATIONAL LEVEL)
2016.12.28
Trang 14800
Do (mm)
680
Dp (mm)
580
Di (mm)
110
Tbt (mm)
16
h (mm)
3
hw1 (mm)
DATE :
DRAWING TITLEISSUED FOR
TENDER APPL CONST AS-BUILT
DATE :
REPRESENTATIVE OF CLIENT
ADDRESS: 628C, HANOI HIGHWAY, RESIDENTIAL ZONE 4
SOUTH LIGHT CONSTRUCTION CONSULTANCY CORPORATION
BINH THANH , HO CHI MINH CITY , VIET NAM
ADDRESS: RM.09, FLOOR 19, VINCOM CENTER,
72 LE THANH TON ST, DIST.1, HCMC, VIETNAM
DETAIL OF BORED PRECAST PILE
(TEST PILE), Q.T: 02 PILES
+Toe of pile +Toe of bored hole
+Existing ground
+1.77 (NATIONAL LEVEL)
DETAIL OF BORED PRECAST TEST PILE (D800)
2016.12.28