1. Trang chủ
  2. » Thể loại khác

Dudley j towards safer ships cleaner seas a handbook for modern tankship operations 1994 ISBN 82 90344 06 6

550 102 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 550
Dung lượng 30,57 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

10-002 Towards safer Ship & Cleaner Seas FIGURES AND ILLUSTRATIONS Chapter 1.. Serving as an officer on a tanker 1.3.5 Officer hand-over notes - use of bound journal 43 1.4.1 Station b

Trang 1

10-002 Towards safer Ship & Cleaner Seas

FIGURES AND ILLUSTRATIONS

Chapter 1 Serving as an officer on a tanker

1.3.5 Officer hand-over notes - use of bound journal 43

1.4.1 Station bill - example of fire and abandon ship emergency plan 44

1.4.5 Verbal drills - verbal drills of possible incidents improve readiness 47

1.5.1 Crew training records - proof or training received 50

1.6.2 Officer’s deck notebook - example of clean product tanker loading plan 58

1.9.1 Management - directive style vs teamwork approach 69

1.11.3 Diet - the main food groups needed for good health 78

1.13.1Communications difficulties-ship-shore must have a common language tocommunicate 83

Chapter 2.The ballast voyage

2.1.1 Contamination of SBT Systems -types of leaks which can contaminate SBT 98

2.2.3 CBT 1.0 to 2.4: Stripping pumproom risers and deck discharge lines ashore 106

2.2.3 CBT 2.5 to 2.7: Stripping bottom line No.1 ashore 108

2.2.3 CBT 2.8 to 2.12: Stripping bottom lines No.2 ashore 110

2.2.3 CBT 2.13 to 2.16: Stripping No.3 bottom line ashore 112

2.2.3 CBT 3.1 to 3.2: Stripping the No.3 pumproom riser and deck line to the slop tank 114 2.2.3 CBT 4.1 to 5.5: Priming the No.1 cargo pump, and flushing the No.3 centre

2.2.3 CBT 6.1 to 6.5: Flushing the No.1 cargo lines from the No.4 centre tank 118

2.2.5 Oil record book entry - CBT tanker after taking on ballast 126

2.4.1 Diagram of tanker bulkhead deflections due to ballast pattern 131

2.13.3 Control of discharge of oil from cargo tank areas of oil tankers 189

2.15.1 Tank ventilation air flow by displacement diagram 194

2.15.3 Enclosed (confined), space entry safety checklist 201

Trang 2

2.18.1 Pumproom sea valve test schematic 218

Chapter 3 The loading port

Chapter 4 The loaded passage

4.2.1 Curve of crude oil cloud point as a function of pour point 353

Chapter 5 The discharge port

5.1.3 Bar-chart form of discharge plan, including COW operations 386

5.26.1 Schematic of centrifugal pump performance factors 451

5.28.7 Cross-section diagram of possible tank suction locations 471

5.31 Schematic illustrating dropping cargo lines to stripping accumulation tank 476

5.35.1 Diagram of suction bell mouth location and ROB wedge calculation 491

5.36.1 CARD cargo incident questionnaire (audit form) 486/7/8

Ngày đăng: 09/04/2019, 14:54

TỪ KHÓA LIÊN QUAN

🧩 Sản phẩm bạn có thể quan tâm