Typhoon Modelling Use of historical typhoon tracks 1986 to 2016 30 Years 40 Selected Typhoons to generate the storm surge and wave height near site... Typhoon Wave Modelling Simulat
Trang 1Nam O Resort Development,
Da Nang, Vietnam
Coastal Protection Study
Ander Chow
05 September 2017
Trang 2Study Site
Site
Tidal Level
MHHW +0.3m ND MLHW +0.1m ND MHLW +0.0 m ND MLLW -0.4 m ND
Wind Rose at Danang Airport
Tidal Levels at Son Tra
Trang 4Typhoon Modelling
Use of historical typhoon tracks
1986 to 2016 (30 Years)
40 Selected Typhoons to generate the storm surge and wave height near site
Trang 5Typhoon Wave Modelling
Simulation of Wave Heights and Storm Surge during passage of Typhoon XangSane 2016
Trang 6Typhoon Xangsane 2016
Typhoon Xangsane (200615)
0 1 2 3 4 5 6 7 8
Trang 7Typhoon Wave Heights at M1 and Pt 9
Year Typhoon ID Typhoon
Name
Max Hs M1 (m)
Max Hs Pt9 (m)
Max Hs Pt9 (m)
Trang 8Extreme Wave Heights near Site (Pt 9)
Return Period (Year)
Wave Height
Hs (m)
Wave Period
Trang 9US National Oceanic Atmospheric Administration
Site
Wave Rose
Trang 10Wave Climate near Site
NOAA M1
Max Hs = 5.4 m Mean Hs = 0.7 m Net wave energy direction 65°Az
Max Hs = 7.1m Mean Hs = 1.2m Net wave energy direction 67°Az
When waves approach shoreline, its direction tends to align with the
seabed bathymetry contour
Trang 1154º
118º 93º 81º 63º
Design Water Level = 2.19mND
Section Beach Slope
1 2
1 2
N
Pt 9
Net wave energy direction 55°Az
Trang 12Longshore Sediment Transport
54º
53º
Mean Hs=0.4m Max Hs=3.3m Dominate Direction=54º
Mean Hs=0.4m Max Hs=3.3m Dominate Direction=55º
Section 1: Beach slope = 0.014 D50 of sand = 0.6mm
Annual sediment transport rate:
Section 2: Beach slope = 0.025 D50 of sand = 0.6mm
Annual sediment transport rate:
Net Sediment Transport Direction Net Sediment Transport Direction
1 2
Trang 13Wave Run-up
Sea Water Level (SWL) = +2.19 mND
(100-y flood level)
Trang 14Beach Profile 1
100 year flood level
100 year flood level+SLR
Swash Zone
Mean Sea Level
Setback (50m)
+2.52mND
+2.19mND
+0.0mND Wave runup level contour
+3.0mND
Trang 15+0.0mND Wave runup level contour
+3.0mND
Trang 16Sandy Beach System
Sediment transport Direction
Trang 1717
Trang 18Undermining of a seawall built on a high energy
coastline (CCD 1997)
Trang 19Summary
Wave heights near the site can reach 4 m (at 9 m depth contour)
during typhoon events
The beach normal almost aligns with the net wave energy
direction; this implies significant cross-shore sediment transport during typhoon events; however, the long-term net longshore
sediment transport move the sands toward NW
Look at the historical satellite images, no significant beach erosion
is found The beaches at site seem to be at an equilibrium state
This equilibrium could be affected when the beach system is
Trang 20Consequence of Beach Intrusion
Trang 21Approximate Contour Line of +3.0mND
Recommendation: All structures be located at the
landside of wave run-up contour
Trang 22Possible encroachment on wave run-up zone
Trang 23Wave Run-up Level
Trang 24Offshore Breakwater
Trang 25Engineering Implications on Club-house Design
1 Discrete piled foundation for clubhouse
2 Design clubhouse slab for wave uplift pressure
3 Avoid wall structure at the edge of clubhouse that
would reflect wave and undermine beach
4 Provide offshore wave attenuation structure such as offshore breakwater/submerged reef structure
Trang 27Breakwater Dimension (for Southern Beach)
Parameters Unit Value (appro.)
Slope of armour structure (v:h) 1: 3
Parameters Unit Value (appro.)
Significant Wave Height m 4.84
Distance from shoreline m 380
*The relocation of structure may be considered when more information is available (e.g sounding survey).
Note: Design dimensions of offshore breakwater to be confirmed in detailed design
Trang 28Offshore breakwaters
Trang 29Near River Mouth
The NW corner is very dynamic, sediments are moving around
in the river mouth area; and sediments at beaches tend to move tower NW The system seems to be stable when sediment supply from Cu De River is not disturbed
However the sediment supply from Cu De River will decrease in future due to urban development The maintenance dredging
activity in the northern port development may reduce the volume
of sediments underlying in Da Nang Bay
Suggest to build a breakwater with lookout to retain/anchor the
NW corner of the site development
Trang 30Western Edge
Possible Lookout
+3m fill
Trang 31END