Firstly, Planning Department has to base on the delivery conditions to sum up a contract signing situation table, the last year production result table, market needs table in order to bu
Trang 1Quản trị tác nghiệp trong sản xuất và kinh doanh tại công ty May 10
1 Introduce the enterprise.
The Garment 10 Joint Stock Company (GARCO 10) is a state – enterprise belong to The Vietnam National Textile Garment Group (Vinatex), specializing in producing and trading of garment GARCO 10 has been established in the war against France Since then, the company has gone over the half of the century of existing and developing At present GARCO 10 has be come one of the leading companies in the field of garment and textile in Vietnam, has been invested modern equipment, worker’s life condition has been improving gradually Annual economic growth has reached 30/%, has been coming one of a big garment and textile
production center of Vietnam
2 Business strategy
The company’s business strategy is to produce high quality commodities, bringing luxury and elegance for customers Therefore, GARCO 10’s has its own reputation on the domestic market On the other hand, in 2011 the company will invest to develop strongly in processing and exporting the products of GARCO 10 to some potential markets such as: EU, USA, and Middle East Countries
3 Preparing to build business plan.
Firstly, Planning Department has to base on the delivery conditions to sum up a contract signing situation table, the last year production result table, market needs table in order to build production plans
Trang 2Before signing contract, customers will send to the company delivery conditions, including some fundamental demands on product models, engineering draw construction of products, packing, and delivery methods
In addition, designers will show some designs, which is expected to launch out to the market in the reason
The staffs of planning department will estimate production needs to carry out building production plans, and then they will sum up all signed orders of customers,
Delivery conditions
Contract signing situation
Assigning the year plans
Monthly delivery and production plans
Monthly production plans
Monthly production progress plans
To order production
The before period production result Market
Trang 3all products that will be recommended to market, quality, styles follow monthly and delivery schedule The table of product and contract signing situation has been just summarized in a year for each kind of product
4 Establish the plan.
* Assigning 2011 processing plan.
Base on the parameters on production capacity and signed contract with customers, planning staff will implement plan in one year
Table 1: 2011 processing plan assignment model
Producti
on unit
Labour
Nor
m Unit 2011 plan
Avera
ge 1 month / year
APP USD/
Pr
Year plan level USD/1LN/
WN
Average income/ye ar
Rema rk
Co
nt Pro b Su m
SL DTG C
100 0c US D
1860 1.488.0 00
155
(Source: Planning Department) Cont: Contracted
APP: Average processing price
Pr: Product
LN: Labor number
WN: Workday number
Prob: Probation
Method of calculating the Norms:
- Production unit, labor data have been taken from Organization Department and been calculated labor changing in the year If labor changed it will be filled into
Trang 4remark section in order to recalculate production capacity for later plans
- Determining Average processing price (APP): Base on applied average price and estimated market changing as well as customer opinions, each production unit and production type will apply different kind of price For example: in the 9th column, Number One Enterprise has determined processing price 0.08USD/product
- Norms: Including total output and processing turnover for each enterprise Total output is calculated base on productivity of each enterprise in a year The data will be supplied by enterprises, base on that, planning employees will split production output in the year of the company to in line with productivity of each enterprise For Garment 1 Enterprise, the norm is 1,860,000 product/year
Processing turnover (PT) = Productivity (P) * Average processing price (APP)
PT (Garment 1) = 1,860,000 * 0.8 = 1,488,000(USD)
Since then, we can calculate annual labor level follow each working shift
Year plan level =
WN LN
PT
* (LN: Labor number, WN: Workday number)
In which labor number is taken from column 4 of the table, workday number in
2011 is 304.5 days
Thus, continuous with above example, assigning plan level of each worker in their work shift is 7.3USD Each worker has to reach this plan level in order to ensure the production target
Average income will be calculated base on turnover, production cost and number salary of labor of the company, which is summarized by Organization Department
* Delivery and production plan
From the overall production plan table, planning staffs will build production and delivery plan monthly And then, they will build concrete production and delivery plan, giving concrete delivery deadline for each enterprise This table will give concrete number of quality, commodity code, and delivery date to prepare for
Trang 5building working progress.
Table 2: August 2011 production and delivery plan (From August 1 to August 31 – 26 workdays)
Productio
n unit Production type Quality(Q) Total
Delivery date
Remar k
Garment 1
Enterprise JC Penny: Annex 05/06
Annex05/06 Man: TH 2471 VaudeTH2499 Vandine:EN095/09 6
TH 2517/TH2518 TH2486
6.942 12.036 + 9.042 3.800
14.561 10.035+4.526 3.199+10.152 5.325
28.020 3.800 10.663 14.561 13.351 5.326
17/8
24 – 31/8 30/8 6/8 2/8 6/8 – 10/9 25/8
(Source: Planning Dept)
Base on the production equipments, line function, and labor quality of each enterprise, especially traditional commodities and agent conditions to assign production For example:
Firstly, test production types: All kind of Shirt products will be assigned to the enterprise number 1, 2, and 5, all new design products often assigned to The Veston
2 (At the GARCO 10)
Actual capacity of a line is supplied by QA Department, which is base on the number of labor of a line and working productivity Base on that to calculate production capacity in a month of an enterprise, allocating quantity inline with production capacity of the enterprise, and continuous like that, in order signed contracts After allocate actual capacity follow production line, if plan productivity still has leftover, the company will consider doing overtime, increasing capacity of the line
Several conditions when arrange production at production units:
Trang 6- Which Items have delivery time first it will be prioritized first.
- The items have full NPL to produce
Items need embroidery, printing, out-washing will be prioritized to produce first
* Monthly production plan
The monthly plan table will show clearly the productivity that each unit has to implement follow customer lists
Table 3: August 2011 production plan model
(26 workdays)
Customer Typ e quantit Total
y
Enterpri
se 1 Enterpri se 2 Enterpri se 5 VT1 VT2
t
Manghara
ms
Shir t
8 Veston
Veston
Senga
Pant s
7
(Source: Planning Dept)
Above data is the production quantities based on production capacity of the
enterprises It is also base on the concrete production and delivery plan to release the data
Table 4: This plan has been accompanied production plan level
spreadsheet for each worker in a shift
Enterprise
Labour
Plan level USD/1lđ Workday
Plan valuable USD Contracted Probation
Enterprise
1
Trang 72
(Source: Planning Dept)
Production progression plan
After calculating capacity of meeting item code demand about time (base on the line productivity) and base on the delivery time to calculate back production starting time
The Planning Department has used GANTT chart to control production
progression This is a common progression plan building method, because it is quite simple, easy to understand and implement After getting necessary parameters, planning employees will build progression plan for 3 month, ending the first month, building plan for the second, then the thirst this is rolling style Enterprises have to report daily about implementation progression, then, planning staffs define
production speed aim to urge or arrange even do overtime to ensure the time of delivery progression
Each item needs to be accomplished before delivery time 5 days to have enough time testing and storing the item
Number of date to produce an item= SLĐLĐ NOI*NSLĐ
NOI: Number of item
Production starting date = delivery date – 5 days – number of production date
The production starting date determination is only relative In situation
production starting date is still far, the production line empty (because the product is made faster than the plan), the enterprises could implement to produce if material is already in the store
For example: For Mangharams item – code: TH 2517, quantity: 3199
The item code has been arranged for the 2 line of Garment 1 Enterprise
Trang 8The labor quantity of the line is 45 workers, productivity is 7 shirt/labor/day
The number of date to produce the code TH 2517 as follow:
3199 Number of date to produce = - = 10 (day)
45*7 Delivery date is August 25, thus we can calculate the production date is August 10 This is compellable day we have to put into manufacture The production order will be launched out before August 10 from 3 to 4 days aim to prepare material
Base on the progression plan, we can see which lines are producing at the certain period The enterprises will send their daily reports to Planning Dept For example, Enterprise 1 will report on the 1st August about item code MV2440A, in which, the enterprise has just 7 days to complete 2,500 products in August (because the enterprise has not completed their set target in July) In fact, in 7 days with normal progression the enterprise will just reach the target of 2,205 products It is mean that, the enterprise needs doing overtime to ensure that the enterprise has enough 2,500 products on 9th August, beginning to produce item code TH2517 But the enterprise has internal trouble, it could not do overtime and negotiate with customer (Ask for more time), planning staff will arrange for the 3rd line in the empty time in 2 days of producing 2 codes: SO6237D and H5365B
* To order production
After having production progression table, manufacturing orders for each customer is set up and send to enterprises The orders will be formed before production time from 3 to 4 days to have free time for the enterprises getting material from the stores The enterprise has to base on the requirements of each order on size, and color of products to classify
Trang 9Table 17: The Mangharams production order model
BM: 09.01.03/sbh:3
Quantity: Shirt: 3199 Booking
thread enterprise
Delivery plan :August 25
Size
Fabric sample
Fabric 100% CTN
(Source: Planning Dept)
5 Conclusion
In the market economy, if an enterprise wants to exist and develop, the
Trang 10enterprise needs to be changed to adapt with market, always be already cope with complex changing of market Building scientifically a production and business plan will affect entire production, business process of a company Therefore, a scientific process will help the enterprises launch out the best production plan in order to bring the company to reach drawn target as soon
as, to be come the leading Garment enterprise of Vietnam
Trang 11The end