Kế hoạch xây dựng hệ thống thông tin nhằm nâng cao hiệu quả Quản lý và kinh doanh của Tổng công ty Sông Đà 6 Plans to build information systems to enhance business efficiency and manage
Trang 1Kế hoạch xây dựng hệ thống thông tin nhằm nâng cao hiệu quả Quản lý và kinh doanh của Tổng công ty Sông Đà 6
Plans to build information systems to enhance business efficiency and management in the five-year period from 2012 -: -2016 and Vision 2020 in the Song Da Corporation 6 - Ministry of Construction.
I/ About enterprise:
Song Da Joint Stock Company 6
-Hero units during renovation,
formerly the company is building
Water Company - a member of
Song Da Corporation established
on 01/05/1983
Company shares goods and
converted into a joint stock
company from 01/01/2006;
business registration certificate 3903400072 by the Department of Planning of Gia Lai Province on 03/01/2006
The main task of the Company: Construction of the main items of the Hoa Binh hydropower projects; Yaly hydropower; Song Hinh Hydropower, Sesan 4, Se San 4a, Hua Na Hydropower, Son La hydropower, water Nam Chien, Huoi Quang hydropower, hydropower Lai Chau, Dong Lai hydroelectric 5 Apply roller compacted concrete dam construction, concrete water, plants spillway, water channels, producing building stone, concrete production; Join construction of bridges, roads, construction of the main items of construction stone production and mining projects Sweden SêKaMan 3 People's Democratic Republic of Laos, including the construction of soil, rock, concrete work items intake gate, spillways, dams, tunnels, water, hydroelectric power plants, production of stone materials, concrete and prepare
to invest some projects such as: Building apartment CT2, mixed commercial
Trang 2buildings TM in Van Khe urban Ha Dong - Hanoi, develop a high-end residential projects HH6 Nam An Khanh, Hanoi, Trade constructed Parliament House and hydropower projects, civil construction, industrial construction, tourism companies currently participating Pacific thermal power plant construction, railway construction capital Marketing Cat Linh - Ha Dong Ha Noi, Bac Lieu wind power projects and many other projects
* Head Office: Building TM Van Khe urban La Khe ward, Ha Dong district, Hanoi
* The units:
The company has six units, two companies associated with a wide range of activities both within the country and abroad Include:
a, Ha Noi area
b, Northeast - Quang Ninh Province
c, Northwest Region, Son La, Lai Chau province
d, The Central Highlands area - Nghe An province - Gia Lai
e, Southern Zone, Dong Nai Province
f, Mekong Delta region: Bac Lieu Province
g, in the Democratic Republic of Laos: Sekong; Attapue
II / Situation analysis:
Due to the scope of activities spread over the country and abroad, local activities mostly located in remote areas difficult to transport traffic The regularly updated, information capture became a vital requirement for all operating activities, the production and the operation of the Song Da Corporation 6 (Songda 6) Clearly defined requirements, special care company leaders and thoroughly implement the application of information technology in all activities of doan now Companies set up their own IT department, one investment administrator with the necessary equipment
to operate the system
Trang 3The company has invested in building your own website and set up a direct charge by
a deputy general director of the operating company The mission of the organization
is looking for business information, post news about the activities of the company and attached units, the problems related to production activities At this Web site, customers mind will find full information about the company including development history, organizational structure, business departments, information about company leadership, official information about the company's business results from time to time, the business plan each time period
1 Information technology applications in operating production:
As early as 2009, after moving
the company headquarters from Se
San 4 Hydropower works on Hanoi
company also plans to build the
foundation of modern information
technology for production Song Da 6
have invested the money to buy
software products Portal Office of
Public Ltd software solution
Vietnamese (VSS) and put to successful use in the management of the company Song
Da 6 currently use Office Portal 7 - Enterprise Edition
All the leaders and employees of Song Da 6 are created one account on their internal network and have access to the internal network at any place at any time With this account, they have the right to send and receive information from anyone in the organization, download the information and documents needed Posting functions and remove permission for the necessary objects such as leadership, the editorial staff Website Can say from being put to use P-office network, office expenses for printing documents, sending mail internally within the company reduced by about 2/3 Currently the only made for printing documents, official reports need to send the superior agencies, government agencies internal documents completely crazy use
Trang 4of network information element In the function of P-0ffice network, the most useful for managers of two modules: the report and work
With the functions
assigned to: Head of the
company can communicate
economic policies for
development for their
subordinates is not only
those who are in companies
that are based in in Dong Nai schools need to do what, never finished, it should coordinate with whom to do, who will supervise this, leaders need to be reported This function allows warning signals at specific time for delivery, the recipient also allows the head to know exactly their employees have read the message delivered
at the time point to urge the appropriate measures
Trang 5Report on function:
This function is especially
useful for companies
operating in leadership
ordered separately Every
day at school, the staff
units will aggregate data
on each block of concrete
was poured, how many
blocks of rock excavation report form Module will synthesize data on a company-wide common reporting At the end of the day, the general director of the company will know exactly today at work in Laos has poured many concrete blocks in the category, the company has done what and production done in days how, accumulated from the beginning of the week, the month is, the plan has set out there, each school should have more equipment, machines and this data can quickly made Word, Exell to serve the management report
The entire operations of the staff rooms are done on the computer In addition to software service of offices usually Microsort Word; Exell; Powerpoint with the operation of each vertical division companies use different specialized software:
Technical: AutoCad software: This software is used to set up the basic design drawings Software Microsort Project: Software establishment and project management
Economic: Software estimation, bids ACITT: The company has licensed and widely used in the payment and settlement, up bids management costs
Accounting: Software SAS - Songda Account System: specialized accounting software by the Informatics Center of the Song Da Corporation write are used
Trang 6uniformly throughout the entire engine system of accounting throughout the total company
The company encourages staff to thoroughly use the free utilities on the internet as Skypee; Yahoo Mesenger in exchange of work, document transmission For leaders wishing to use the phone, the company supports and requires the use of smart phone features voice calls over the network (Viber) to reduce the cost of enterprise management
The division management companies have huge database of technical information, unit price and works, accounting data, personnel data, device data, but not the way to together in a system When you need to use will have to revise a lot of time
III/ Strategic application of information technology of the Song Da 6:
With industries operating characteristics, the application of information technology of the Song Da 6 mainly serve the local administrator
1 Strengths, Weaknesses, Opportunities, and Threats:
1 Company leaders realize correct
and clearly see the effect of the
application of information
technology in corporate governance
activities
2 The company has sufficient
financial resources needed to
implement investment projects for
Information Technology
3 Officials and employees with
background in information
technology to meet the
requirements in using information
technology tools
4 Informatics systems and equipment
of the company is fully equipped
and upgraded regularly The
company specializes in the
management department intranets,
employees at the company and the
1 Access to and use of advanced management methods and modern high efficiency
2 Facilitating make good use of the opportunity to find more jobs, expanding the market by the management and effective use of information and updates
3 Update the advanced technology of the world in the field of construction
4 Meet the special requirements of the investor for the project to work with foreign partners
Trang 7units are supported buy laptops, the
division is equipped with office
machines Scan, camera For units
based in remote areas do not have
cell phone waves (region Laos) are
fitted with a satellite phone base
stations
5 Investment to build one internal
information technology systems
synchronized to meet the
administrative requirements in the
new stage of development with
many new areas not yet
constructed
6 Synchronize data across the
company, under a unified
management system, a unified data
processing
7 Reduce the cost of management
(management staff costs, office
expenses, etc.), reduce costs and
increase competitiveness
8 Build an integrated software
functions entire production process
from the measure stripping
drawings, making cost estimates,
estimates of supplies and
equipment; price, payment and
settlement work
1 Some of the software used in the
operation of the company is the
software copy, stability is not high
2 Officials and employees with
knowledge of information
technology at just apply some
common features of the software, at
least take the time to explore in
order to take full advantage of the
investment
3 The software applications in the
design and construction solutions
1 Competitiveness of the
business is the foundation techniques based on better
businesses in Vietnam
2 Human resource recruitment implementation of management information systems for business difficult by requiring both to excel in the field of IT to understand the processes, technology, management of
Trang 8that force not to promote optimal
experience
4 The data connection of discrete
division company, is delayed due to
each using a different software
system
construction enterprises
3 Regular information system equipment to upgrade and supplement
Develop information systems to meet the following requirements:
work online Integrate the function call, the conversation (as Skypee) high security guarantee conditions to conduct online meetings with the school Minimize their meeting at company headquarters (Currently meeting all corporate leaders and units 4 times / year; meeting at the headquarters of 1 times / year, meetings are held via the intranet) Equipped devices to the company and the unit to perform
still room under the administrative organization), Recruitment adding 1 -: - two engineers to operate information technology systems (currently 1 user) Investment in equipment hardware powerful enough for internal network management system to meet the development objectives of the company's expected growth rate of 15% per year
requirements:
- With Technical Working:
Automatic drawings in accordance with standard techniques while providing the necessary data (geodetic data, topographic data, environmental data, etc.); + Calculate the impact force, the structural weaknesses in the risk of insecurity + Manage the mass implementation progress
Trang 9+ Dissection demand using all kinds of materials: oil, explosives, cement, steel, etc.; removing the need for human resources, construction equipment (drills, cranes etc.) according to the internal norms of the company
- For financial and economic work:
+ Update all data collection, unit price, and in the works
+ There is a specific database on the internal norms of the company
+ Updated full financial regulations, the ability to integrate the system accounting data in SAS software for general use
+ Calculate the exact price on the basis of the receiver, volume measured shelled above, the internal unit, the financial cost
+ Settlement salaries and bonuses with each team
+ Update the salary of each worker divided automatically for each person + Extract detailed report on the work of each department and business management reports to management
- For the Organization and Staffing:
Automatic management details all the information about employees in the company: trades training, working time Automatically updated list of officers and employees to the duration of wage increase , school grade transfer wage increase; automatically update and report on the implementation of sleep mode with employees, reward regime
+ Automatically calculate the cost of insurance should pay to employees in accordance with each month
- For the management of the world:
+ Updated complete information on all of the company's existing equipment: production, power consumption, device status
+ Plan periodic overhaul, inspection time
+ Biography equipment
Trang 10- Other functions.
Trang 113 Planning:
No Work content Execution time Form of
implementation
Owner / Partner service providers
Cost (USD)
A Investment projects operating service
online
Q I, II-2013 Songda 6
142.675
1 Software Upgrade P - Office Q I/2013 Sourcing VSS 15.000
2 Mua thiết bị phục vụ giao ban trực tuyến M 4/5-2013 Sourcing Partner service providers 87.500
3 Instructions, operation 6/2013 Self-made Songda 6 6.025
4 Testing, evaluation, amended 12/2013 Self-made Songda 6 4.250
B Investment project to upgrade air network
administrator
29250
1 Engineers recruitment information
technology
6/2013 Self-made Songda 6
0
C Integrated project management software 2013 - 2014 Songda 6 39500
2 Search software unit written 2/2012 Self-made Partner service providers 0
3 Software design; integrated data 3/2013 -:- 8/2014 Sourcing Partner service providers 25.000
4 Buy, equipped with the necessary hardware 6/2014 -:- 8/2014 Sourcing Partner service providers 6.000
5 Training manual operation 8/2014 -:- 9/2014 Sourcing Partner service providers 3.500
6 Assessment, amended 10/2014 -:- 12/2014 Sourcing Partner service providers 5.000
7 Uniformly applied throughout the company 1/2015 Self-made Songda 6
Finish -References: