1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

ICAO Annex 14 Heliport Design HeliExpo - 1 - 2010

55 101 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 55
Dung lượng 2,7 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

ICAO Annex 14 Heliport Design HeliExpo - 1 - 2010 Icao annex 14 helicopter association international. Heliport floodlight segs23h flood. Icao annex 14 heliport design heliexpo 4 2010. Safety management sarps extract annex 14 ... icao. Heliport lights for oil gas field. Icao doc 7192 training manual flight dispatchers. What regulations or procedures address runway taxiway interference for. I cao aerodrome design manual part 6. Heliport design ac workshop heliexpo 2011 helicopter. Icao hemssg preliminary meeting helicopter association of. Obstruction lights cao type b / faa type l 864 medium intensity . Heliport design ac workshop heliexpo 2011 helicopter. Aerodromes annex 14 to the convention on international civil aviation this edition incorporates all amendments adopted. Helicopters document. heliport protection. state caa manual of validation and ... icao. There is a helipad in the back of this us navy strategic sealift ship. Controlling area archivi ocem airfield lighting technology. A704 compact white runway lighting. Draft icao circular on nla.pdf airports council international. Heliport of the university hospital aachen, north rhine westphalia, germany. E icao r inspection guidance part i pdf . Civil aviation safety authority australia manual of stnadards mos 139. Rooftop heliports surface level heliports helipads on offshore. Manual of standard casr 139 screenshot 1. Portable airfield lighting trailer pa . Attention document sales unit 3. Learn esl english as a second language.pdf. Manual for preventing runway incursions.

Trang 1

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

(ICAO Annex 14 Volume II –Heliports)

WORKSHOP

Dr John W Leverton

IFHA Representative to ICAO Aerodrome Panel

HAI Heliport Design Focal Point Vice President Infrastructure Development, AHS

HELIPORT/HELIDECK DESIGN

Trang 2

International Federation of Helicopter Associations

Trang 3

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ANNEX 14 Vol II

WORKSHOP

Comments based on my involvement as the IFHA Representative to

the ICAO Aerodrome Panel (AP), the Heliport Design Working

Group (HDWG), the Visual Aids Working Group (VAWG) and

associated Sub-groups …

… and Rapporteur of the HDWG Visual Aids Sub-group (VASG).

COMMENTS SHOULD NOT BE TAKEN AS STATEMENT OF

ACTUAL ICAO POLICY OR WHAT WILL APPEAR IN THE

DESIGN TO BE ISSUED IN 2011 (or 2012!!)

THE VIEWS EXPRESSED ARE MY OWN

AND MUST NOT BE TAKEN AS BEING

REPRESNTATIVE OF THOSE OF THE ICAO HDWG, IFHA, HAI OR AHS.

Trang 4

ICAO ‘ANNEX 14 UPDATE ’

(ICAO Annex 14 Volume II –Heliports)

WORKSHOP # 1

Dr John W Leverton

IFHA Representative to ICAO Aerodrome Panel

HELIPORT/HELIDECK DESIGN

Trang 5

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ICAO ANNEX 14 Vol II

HELIPORTS

Trang 6

ICAO ANNEX 14: VOLUME II – HELIPORTS

New ‘Tranche 1’ Annex 14 = THIRD EDITION – JULY 2009

2004 Annex 14 = SECOND EDITION – Amendment 3 – July 2004

***********************

FAA Advisory Circular (AC) 150-5390-2B (2004)

PRESENTATION TERMINLOGY

Trang 7

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Annex 14 UPDATE PROGRESS

First set of changes (Tranche 1) agreed at HDWG/2 (June 2006) –

Changes endorsed by the „WG of the Whole‟ at WGoTH/3 meeting

(August 2006)

Approved by Aerodrome Panel at AP/1 December 2006.

 Tranche 1 Changes approved by ICAO ANC May 2007

 ICAO „State Letter‟ ** issued with „Tranche 1 changes‟ August 2007.

** State Letter included also changes to Annex 14 Volume 1 related to Aerodromes

Trang 8

CURRENT STATUS

Updated Annex 14 Volume II – Heliports (Tranche 1)

Issue July 2009:

applicability date 19 November 2009 !

Note: Some ‘helideck requirements’ have later applicability date of 2012

 HDWG now finalizing ‘Tranche 2’ Changes

ICAO AP/2 to address ‘tranche 2’ changes, originally planned for

2009, now October 2010

HDWG planning to ‘start work’ on updating the ICAO Heliport

Design Manual (Doc 9261) in 3 rd Quarter of 2010 ? – this is of

Trang 9

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

CURRENT STATUS

Updated Annex 14 Volume II – Heliports (Tranche 1)

Issue July 2009:

applicability date 19 November 2009 !

Note: Some ‘helideck requirements’ have later applicability date of 2012

 HDWG now finalizing ‘Tranche 2’ Changes

ICAO AP/2 to address ‘tranche 2’ changes, originally planned for

2009, now October 2010

HDWG planning to ‘start work’ on updating the ICAO Heliport

Design Manual (Doc 9261) in 3 rd Quarter of 2010 ? – this is of

major importance since Manual will detail how to apply ‘Annex 14 Volume II’

Trang 10

Annex 14 STATUS

•Chapter 1: General (Definition) - main changes completed in ‘tranche 1’ - addition

changes to be made in tranche 2 to cover ‘floating (pontoon) heliports’ etc., and to

ensure requirements for VFM (VFR) heliports cover also heliports where an instrument (Point in Space/PinS) approach is used

•Chapter 2: Heliport Data – tranche 2 minor changes.

•Chapter 3: Physical Characteristics – main changes completed in ‘tranche 1’: some

additional changes and new term ‘FATO/TLOF’ for elevated heliports and helidecks to be made in tranche 2.

•Chapter 4: Obstacle Restriction and Removal (Airspace) : Study completed for VFM

(VFR) heliports - to be issued as part of tranche 2

•Chapter 5: Visual Aids (Markings & Lighting) - minor changes issued in tranche 1 –

c hanges to ‘markings’ to be issued as part of tranche 2, lighting 40 % complete – still

Trang 11

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Annex 14 Future Work

ICAO agreed –at AP1 (Dec 2006)- for Annex 14 to be reformatted to

make it easier to use – the existing and „new‟ text will be grouped in

the following

Chapters:-Chapter 1 General Chapter 2 Surface-level Heliports Chapter 3 Elevated Heliports Chapter 4 Instrument Heliports Chapter 5 Helidecks

Chapter 6 Shipboard Heliports and Winching Areas

and each Chapter will consist of the following

6 Heliport Services

Trang 12

Annex 14 Future Work

Annex 14 to be reformatted to make it easier to use – the existing and

„new‟ text will be grouped in the following

Chapters:-Chapter 1 General Chapter 2 Surface-level Heliports Chapter 3 Elevated Heliports Chapter 4 Instrument Heliports Chapter 5 Helidecks

Chapter 6 Shipboard Heliports and Winching Areas

and each Chapter will consist of the following

Trang 13

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ICAO DOCUMENTS

Trang 14

ICAO DOCUMENTS

ICAO ANNEX 14: VOLUME II – HELIPORTS

THIRD EDITION – JULY 2009

HELIPORT MANUAL; THIRD EDITION – 1995

(DOC 9261 – AN/903)

RELATED DOCUMENTS

ICAO ANNEX 6, PART III INTERNATIONAL OPERATIONS –

HELICOPTERS: SIXTH EDITION – JULY 2004

ICAO ANNEX 14, VOLUME I – AERODROME DESIGN AND OPERATIONS –

JULY 1990

Trang 15

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ICAO DOCUMENTS

ICAO ANNEX 14: VOLUME II – HELIPORTS

SECOND EDITION JULY 1995 [ AMENDMENT 2 (Minor change re Aeronautical Data): NOVEMBER 1997

ADMENTMENT 3 (Major Lighting Changes): NOVEMBER 2004

Trang 16

ICAO DOCUMENTS

Trang 17

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ICAO DOCUMENTS

Trang 18

ICAO DOCUMENTS

ICAO Heliport Manual, which is out of date

and incorrect in some sections folowing the

issue of the Tranche 1 changes, needs to be

updated: HDWG is starting work on the

sections on helidecks … no specific plans for

addressing heliports: aim to decide by 3 rd

quarter of 2010… even so a replacement will

not be available for a number of years!!

Trang 19

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

‘Free Field‟ Performance Class 1*

„Elongated FATO‟ Performance Class 2 & 3*

* NOT ICAO terms

Trang 20

Silverstone Paris

‘Free Field‟ Performance Class 1*

„Elongated FATO‟ Performance Class 2 & 3*

Tranche 2 Proposal – to be called “Runway-type FATOs.”

Runway-type FATO A FATO having characteristics similar in shape to a fixed wing

Trang 21

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ELEVATED HELIPORTS

Trang 22

SURFACE LEVEL HELIORTS

Trang 23

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

HELIDECKS

Trang 24

SHIPBOARD HELIPORT

Trang 25

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Floating (Pontoon) Heliport Heliport on „structure‟ over water

Surface-level heliport A heliport located on the ground or on

the water.

Tranche 2 Proposal:

Surface-level heliport A heliport located on the ground or on

a structure on the surface of the water.

Elevated heliport A heliport located on a raised structure on land

Tranche 2 Proposal:

Elevated heliport A heliport located on a raised structure on land

Proposed „Tranche 2‟ Definition Changes

Melbourne, Australia

Trang 26

Safety

Area

FATO

TLOF HELIPORT TERMINLOGY

Can be any shape – usually square or round

Trang 27

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Safety Area

FATO

TLOF/Central Zone HELIPORT TERMINLOGY

FATO: Final Approach and Takeoff Area TLOF: Touchdown and Liftoff Area

TLOF can be outside of FATO located in a helicopter stand

Protection Area

Helicopter Stand

Trang 28

PRESENTATION TERMINOLOGY

RD = ROTOR DIAMETER

D = „D-value‟ = OVERALL LENGTH (OL)

UCw = UNDERCARRIAGE WIDTH/LENGTH

PC1, PC2 & PC 3 is used to refer to heliports designed on

the assumption that they are “intended to be used by

helicopters operated in performance class 1” or

“performance class 2 and 3” respectively.

The „diagrams‟, although illustrating the approximate relative sizes are

Trang 29

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Trang 30

US (FAA) AC150/5390-2B

FAA AC 150/5390-2B-2B (AC-2B) Heliport Design was issued

on 9/30/04 (30 September 2004) and is available on a number

of FAA and other web sites - the following is one useful web

site to obtain the

document:-http://www.faa.gov/arp/publications/acs/5390-2/5390-2b.pdf

Hardcopies are NOT available from the FAA – they are

available from a number of commercial suppliers at a fee.

NOTE: AC-2B is an “Advisory Circular” i.e Guidelines … but is

Trang 31

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Annex 14/FAA MAJOR DIFFERENCES

ICAO ANNEX 14 ~ FAA AC 150-5390-2B *

PERFORMANCE” REQUIREMENTS (HELICOPTER

PERFORMANCE CLASS) DEFINED IN ANNEX 6

FAA AC-2B BASED ON HELIPORT TYPE (USE).

• Main Technical Differences

• Airspace Requirements

*Issued by FAA in September 2004.

** Differences between „Annex 14 Vol II‟ and FAA AC-2B are considerably less

as a result of the „tranche 1‟ changes

Trang 32

•EXPLANATION OF TERMINOLOGY AND CONCEPTS USED IN

ICAO ANNEX 14 Vol II

•DISCUSSION AND OUTLINE OF

:-(i) Changes in Annex 14 „tranche 1‟ issued July 2009

(ii) Additional changes being considered by the ICAO HELIPORT

DESIGN WORKING GROUP (HDWG) for „tranche 2‟ and some

„Post-Tranche 2‟ changes.

(iii) Review of main differences between US/FAA Heliport Design AC

150/5390-2B (AC-2B) and „tranche 1‟ ICAO Anne x 14 „standards and

recommended practices‟ (SARPS) for heliports

Trang 33

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

AIM

•EXPLANATION OF TERMINOLOGY AND CONCEPTS USED IN

ICAO ANNEX 14

•DISCUSSION AND OUTLINE OF

:-(i) Changes in Annex 14 „tranche 1‟ to be issued April/May 2009

(ii) Additional changes being considered by the ICAO HELIPORT

DESIGN WORKING GROUP (HDWG) for „tranche 2‟.

(iii) Review of main differences between US/FAA Heliport Design AC

recommended practices‟ (SARPS) for heliports

*** Tranche 2 Proposal – also cover heliports with PinS approaches

Trang 34

•EXPLANATION OF TERMINOLOGY AND CONCEPTS USED IN

ICAO ANNEX 14

•DISCUSSION AND OUTLINE OF

:-(i) Changes in Annex 14 „tranche 1‟ to be issued April/May 2009

(ii) Additional changes being considered by the ICAO HELIPORT

DESIGN WORKING GROUP (HDWG) for „tranche 2‟.

(iii) Review of main differences between US/FAA Heliport Design AC

recommended practices‟ (SARPS) for heliports

Trang 35

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

ELEVATED HELIPORTS

FATO AND TLOF ARE “COINCIDENTAL” *

(i.e SAME SIZE – 1D or 0.83 D)… and FATO IS DLB

DLB = Dynamic Load Bearing **

* Also applies to Helidecks

** Currently difference in DLB requirements:

FAA 1.5 x MTOW Annex 14 2.5 x MTOM

[Both applied through 2 points of contact.]

Covered in Heliport Manual – NOT addressed in Annex 14 – not

reviwed to date by HDWG or any Sub-group.

ICAO/International MTOM (Max Takeoff Mass) = US MTOW (Max Takeoff Weight)

Trang 36

ELEVATED HELIPORTS

FATO AND TLOF ARE “COINCIDENTAL” *

(i.e SAME SIZE – 1D or 0.83 D)… and FATO IS DLB

DLB = Dynamic Load Bearing **

* Also applies to Helidecks

** Currently difference in DLB requirements:

FAA 1.5 x MTOW Annex 14 2.5 x MTOM

[Both applied through 2 points of contact.]

Covered in Heliport Manual – NOT addressed in Annex 14 – not

reviwed to date by HDWG or any Sub-group.

Tranche 2 Proposal – new term FATO/TLOF

Trang 37

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

DIFFERENCES

Trang 38

ICAO FRAMEWORK

• PPR (Private Use) Heliports Not Directly

Considered In Annex 14 [Only Brief Reference To PPR Heliports

Made In This Presentation]

• Annex 14 covers Hospital Heliports ** - Most

European Nations consider Annex 14 Applies To All „Public Interest‟ Facilities including Hospital Heliports

• “Europe” considers Hospital Heliports should be

designed for Performance Class 1 operations –

requirement of JAR OPS 3 …

or with a DLB Area (FATO + Safety area) of 2D

Trang 39

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

GENERAL

corresponds to General Aviation Heliport in FAA

AC.

• PC1 Heliport in ICAO Annex 14 is approximately

the same as Transport Heliport in FAA AC … but is

Annex 14 based on PC1/Cat A performance rather

that dimensions related to size of helicopter as in

FAA AC-2B : in this case Annex 14 generally less

demanding and more logical than FAA AC-2B!

Trang 40

corresponds to General Aviation Heliport in FAA

AC.

the same as Transport Heliport in FAA AC … but

is Annex 14 based on PC1/Cat A performance

rather that dimensions related to size of helicopter

as in FAA AC-2B : Annex 14 generally less

Trang 41

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

PC2/PC3 Heliports

2004 Annex 14

- FATO is equivalent to TLOF in FAA AC

- TLOF of 1.5UC is similar to PPR ‘2UC paved portion

of the TLOF’.

‘New’ 2009 Tranche 1 ‘ Annex 14

– FATO and TLOF in general terms same as in FAA AC

HELIPORT TERMINOLOGY CHANGES

Trang 42

ICAO ANNEX 14 - HELIPORTS

PERFORMANCE CLASS 1 (PC1)

• PERFORMANCE CLASS 2 & 3 (PC2/PC3)

NOTE: ICAO ANNEX 14 APPLIES TO SURFACE

(GROUND) LEVEL AND ELEVATED HELIPORTS

…….AND HELIDECKS

US/FAA USES AIRWORTHINESS CATORGIES – CAT A and CAT B NO

FAA PERFORMANCE CLASS / CAT REQUIREMENTS RELATED TO

Trang 43

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

PERFORMANCE REQUIREMENTS

ICAO ANNEX 6*(JAR-OPS 3) US/FAA**

*ANNEX 6: UPDATED/REVISED BY THE ICAO HELICOPTER TILTROTOR STUDY GROUP (HTSG) – New version issued in 2007.

** CAT A (CATEGORY A) AND CAT B (CATEGORY B) ARE AIRWORTHINESS

CERTIFICATION DESIGNATIONS –

*** PC 2 – AKIN TO “CAT B TAKEOFF AND LANDING + CAT A EN-ROUTE/CRUISE”: SOME

US/FAA CAT A/OEI EN-ROUTE REQUIREMENTS

Trang 45

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Trang 46

PERFORMANCE CLASS 1 (FREE-FIELD) CAT A.

Trang 47

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

Trang 48

PC1 GROUND SPACE

„Clearway‟: area to be protected – not required to be

Free-field/Clear-area Cat A

FATO

Trang 49

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

„Clearway‟: area to be protected – not required to

be load bearing Area defined in the H/RFM

PC1 GROUND SPACE

Restricted Area/Short-field Cat A

Trang 50

IMPACT OF HELIDECK HEIGHT

Trang 51

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

IMPACT OF HELIPORT HEIGHT

Ground Level

Trang 53

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

MAJOR DIFFERENCES

PERFORMANCE” REQUIREMENTS (HELICOPTER

PERFORMANCE CLASSES)

FAA AC-2B BASED ON HELIPORT USE.

• MAIN TECHNICAL DIFFERENCES

• LOAD BEARING AREA REQUIREMENTS

• AIRPSACE REQUIREMENTS

* ISSUED BY FAA IN SEPTEMBER 2004.

Trang 54

GROUND SPACE FATO

• ICAO ANNEX 14 * „LINKED‟ TO ICAO ANNEX 6

i.e DESIGN REQUIREMENTS LINKED TO HELICOPTER PERFORMANCE CLASS (PERFORMANCE CLASS 1, 2 AND 3)

GENERAL AVIATION [PRIVATE USE/PPR]

HOSPITAL

TRANSPORT **

i.e NO DIRECT „LINK‟ BETWEEN DESIGN AND OPERATIONAL /

PERFORMANCE REQUIREMENTS

Trang 55

Leverton Associates, Inc

ICAO ‘Annex 14 Update’ Workshop – HAI HeliExpo 2010

End of this section ….

…… MORE TO COME

Ngày đăng: 01/05/2018, 09:52

TỪ KHÓA LIÊN QUAN

🧩 Sản phẩm bạn có thể quan tâm