1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

TỔNG HỢP BẢN VẼ THÁP GIẢI NHIỆT NƯỚC GKS 1400 4BM

8 337 3

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 8
Dung lượng 1,85 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

ERIS BROUGHT TO THE KNOWLEDGE OF A THIRD DRAWING NO... COMPANY : Cooling Tower GENIUS PREMIER SDN BHD No.. THE DOCUMENT MUST NOT BE USED WITOUT OR AUTHORIZATION OR BROUGHT TO THE KNOWLE

Trang 1

DETAIL ASSEMBLY WATER BASIN -

(PART NO : 209)

FOR

MATERIAL LIST

2 102 BASIN FRAME — SIDE R 2

8 109 FRP_ FRAME 2

9, 110 FRP_ FRAME 2

10 111 FRP BASIN SHEET (SIDE) 2

15 601A BALANOING PIPE 1

18 6038 FLOAT VALVE 1

19 605C MANUAL MAKE UP PIPE 1

23,

24

25

Faxs : 03 — 8060 2000 PARTY ERIS BROUGHT TO THE KNOWLEDGE OF A THIRD DRAWING NO : GPSB/ASS/GKS1 400—4BN-1

Trang 2

DETAIL ASSEMBLY OVERFLOW (604)

(PART NO : 209)

NOTE:

-204 & 204A INSTALLED FOR DOOR FRAME ONLY -ONE CELL HAVE 2 DOOR ONLY

-MULTI-CELL ALSO HAVE 2 DOOR ONLY -206 INSTALLED FOR FLAT PANEL ASSEMBLY ONLY

MATERIAL LIST

32

33

COMPANY :

Cooling Tower

GENIUS PREMIER SDN BHD

No 35-2, Jalan Puteri 4/1,

Bandar Puteri, 47100 Puchong,

Selangor, |

Faxs : 05 = 8060 2000

PROJECT :

REMAIN OURS THE DOCUMENT MUST NOT BE USED WITOUT OR AUTHORIZATION OR BROUGHT TO THE KNOWLEDGE OF A THIRD

PARTY (GSNIUS MAIN STRUCTURE ASSEMBLY

DRAWN BY : | DESIGN BY : PAGE :

Trang 3

QTY

2

2

150

2

4

4

1

1

4

1

1

1

1

4

4

2

1

1 SET

INLET DISTRIBUTION BOX

ADJUSTABLE STUD (FOR MOTOR) DRIFT ELIMINATOR

FAN STACK

PULLEY COVER (UPPER) GREASE _HOSE

MATERIAL LIST DESCRIPTION FAN HOLDER HOT WATER BASIN

BEARING BOX FAN HUB

FAN PULLEY

PAGE : REVISION : MODEL NO : GKS 1400—4BM/

DESIGN BY : SCALE : N.T.S DATE : MAC 2013

SAHRIL CHECKED BY : DRAWN BY :

APPROVED BY :

LAWRENCE

é `

mm

TOP STRUCTURE &

DRIVE SYSTEM ASSEMBLY

CLIENT :

PROJECT :

AUTHORIZATION OR BROUGHT TO THE KNOWLEDGE OF A THIRD THIS COPYRIGHT / OWNERSHIP OF THIS DOCUMENT IS AND WILL

COMPANY :

Cooling Tower

GENIUS PREMIER SDN BHD

Tại + 0Ệ - 8060 2020

03 = 8060 2000

Faxs :

No 35-2, Jalan Puteri 4/1,

Bandar Puteri, 47100 Puchong,

Trang 4

MATERIAL LIST

1 207AR SUPPORT BRACKET 2

2 207CR SUPPORT BRACKET 2

3 501 INFILL SUPPORT 8

5 501B HOT BASIN SUPPORT BRACKET 2

6 501G INFILL SUPPORT HANGER 4

7 501D U-BOLT FOR INFILL SUPPORT 4

8 502 INFILL HANGER SUPPORT 8

10

GENIUS PREMIER SDN BHD

Faxs : 03 — 8060 2000 PARTY ERIS BROUGHT TO THE KNOWLEDGE OF A THIRD DRAWING NO : GPSB/ASS/GKS1400—4BM—4

Trang 5

CASING ASSEMBLY

-¡_ PHÁ

a

SY IK 1 210 PANEL — CENTRE 2

11

607

all

807

GENIUS PREMIER SDN BHD

Tel : 05 — 8060 2020 REMAIN OURS THE DOCUMENT MUST NOT BE USED WITOUT oR

Trang 6

MULTI_CELL — BASIN INSTALLATION

903 slot into two basin edge

903 slot into two basin edge

903 slot into two basin edge

MATERIAL LIST

2

3

4,

5

PROVIDE 30mm CLEARANCE

AT ALL CELL CONNECTION

Cooling Tower - SAHRIL NTS _

ng: dee nể" THIS COPYRIGHT / OWNERSHIP OF THIS DOCUMENT IS AND WILL LAWRENCE MAC 2015 6KS 1400-4BM Tel : - 8060 2020 REMAIN OURS THE DOCUMENT MUST NOT BE USED WITOUT OR

Trang 7

MULTI CELL — PARTITION INSTALLATION ASSEMBLY

atid

my Ew

— |P |}P Ít *

MATERIAL LIST

1 210 PANEL — CENTRE 2

2 211 PANEL -L&R 14

3 211A PANEL — L & R (SIDE) 4

4 808 FLAT PANEL (CENTRE) 3

5, 809 INTERNAL PANEL 12

6

1

8

9

10

lu

Trang 8

801

804

TS

Z7 0`

MATERIAL LIST

HOT WATER BASIN)

OUTER 4 EDGES)

7

8

9

10

801

ng: dee nể" THIS COPYRIGHT / OWNERSHIP OF THIS DOCUMENT IS AND WILL LAWRENCE MAC 2015 GKS 1400—4ÐM Tei : - 8060 2020 REMAIN OURS THE DOCUMENT MUST NOT BE USED WITOUT OR

Ngày đăng: 17/02/2018, 00:26

TỪ KHÓA LIÊN QUAN

🧩 Sản phẩm bạn có thể quan tâm

w