BẢNG TÍNH LÚN THEO THỜI GIAN BẰNG TIẾNG ANH NGÀNH CẦU ĐƯỜNGBẢNG TÍNH LÚN THEO THỜI GIAN BẰNG TIẾNG ANH NGÀNH CẦU ĐƯỜNGBẢNG TÍNH LÚN THEO THỜI GIAN BẰNG TIẾNG ANH NGÀNH CẦU ĐƯỜNGBẢNG TÍNH LÚN THEO THỜI GIAN BẰNG TIẾNG ANH NGÀNH CẦU ĐƯỜNGBẢNG TÍNH LÚN THEO THỜI GIAN BẰNG TIẾNG ANH NGÀNH CẦU ĐƯỜNG
Trang 1SEGMENT 166 Km21+280-21+350
Trang 2CALCULATION REPORT
Projetct: Central Mekong Delta Region Connectivity Project Package: CW2C
Station: CW2C-166(KM21+280-KM21+350)
I INPUT DATA:
Pavement structure: Flexible pavement high grade A1 a =10.80m b = 10.30m 7.00m
Width of counter weight berm (m): 7.00 Temporary
Height of counter weight berm (m): 3.00
Density of filling soil γe (T/m3): 1.90
Standard for residual settlement:
Borehole:
!
Trang 3Depth γw σp Cu
1aOver 1.768 1.706 1.656 1.568 1.427 1.255 1.069 0.881 0.659 0.549 0.485 0.417 0.345 0.278 0.275
- Note: γw - Density; e0 - Initial void ratio; Cc - compressive ratio; Cr - recompressive ratio; σp - preconsolidation pressure
Trang 4II RESULT
II.1 Untreated:
Permited residual settlement (cm): 30 (In duration of 15 years after construction)
.
Consolidated settlement at finish of construction (cm): 22.23
Consolidated settlement after 15 years from finish of construction (cm): 72.40
Conclusion: Residual settlement is outside permited values Must treat soft soil.
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
m
Time - consolidated settlement curve
Trang 5II.2 Treat soft soil by vertical drain
II.2.1 Method of treatment:
Step Filling
height
Filling time
Waiting time
Total time
Old time
Changing time
Filling rate (cm/day) 10
II.2.2 Settlement:
Settlement of treated embankment during time is shown in following chart:
Trang 6Total settlement S (m): 2.41
Consolidation settlement after construction 15 years (m): 1.81
Consolidation settlement at finish of construction (m): 1.56
Conclusion: Residual settlement in permited values.
0.5
3.58
3.09
4.45
4.19
6.23
-4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
-2.5
-2 -1.5
-1 -0.5
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Lún c ố kết theo thời gian Lún c ố kết hoàn toàn Chi ều cao đắp Cao độ nền
Days
Settlement of Treated embankment
Trang 7III CALCULATE SETTLEMENT OF UNTREATED GROUND:
III.1 Calculate completed settlement of each sublayer
33 1.71 0.29 2.01 2.41
- Note: Hb - Depth of sublayer bottom; Hm - Depth at middle of sublayer; d - Thickness of sublayer
γ' - Effective density; e0, Cc, Cr, σp - as noted at section I.2; σvz - vertical effective stress due to the
selfweght of soil; σz - vertical stress due to the load of embankment; x - distance from center of
road to considering point; Si - settlement of sublayer
Thick of settlement zone (m) Consolidate settlement of treated zone (m)
Total consolidate settlement (m)
Total settlement(m)
Consolidate settlement of untreated zone (m)
Layer
(Method in aricle VI.1, VI.2 of standard 22TCN 262-2000)
Trang 8III.2 Calculate consolidate settlement at times: (Method in aricle VI.3 of standard 22TCN 262-2000)
CALCULATION COEFFICIENT CONSOLIDATION
At center
x = 0.00 (m) (m) (2σvz+σz)/2
(kg/cm2)
Cvi
(10-3 cm2/s)
Average coefficient consolidation Cvtb = 5.36E-04
Average coefficient of consolidation in the vertical orientaion Cv
tb
(cm2/s) 5.36E-04
Consolidation drainage depth in the vertical orientation H (m) 16.50
Time factor (Tv) is calculate according to following formula: 0.009
Layer
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
m
Time - consolidated settlement curve
Trang 9IV CALCULATE SETTLEMENT OF TREATED GROUND:
IV.1 Calculate completed settlement cause by filling height at each step: (Method in aricle VI.1, VI.2 of standard 22TCN 262-2000)
Filling stage
Calculate settlement of each sublayer with filling height H = 4m
At toe
Cc
e0
Thick of settlement zone (m) Consolidate settlement of treated zone (m)
Total consolidate settlement (m)
Consolidate settlement of untreated zonel (m)
Total settlement (m)
Trang 10Calculate settlement of each sublayer with filling height H = 5.5m
Calculate settlement of each sublayer with filling height H = 9.3m
Total settlement (m)
Thick of settlement zone (m) Consolidate settlement of treated zone (m)
Total consolidate settlement (m) Consolidate settlement of treated zone (m)
Thick of settlement zone (m)
Total consolidate settlement (m)
At center
Cc
Consolidate settlement of treated zone (m)
At center
Cc
e0
Consolidate settlement of treated zone (m)
Total settlement (m)
Cr
Trang 11Calculate settlement of each sublayer with filling height H = 9.3m without berm
Total consolidate settlement (m)
Total settlement (m)
Thick of settlement zone (m) Consolidate settlement of treated zone (m)
At toe
Consolidate settlement of untreated zon (m)
Trang 12IV.2 Calculate consolidated settlement at times: (Method in aricle VI.3 of standard 22TCN 262-2000)
Calculation coefficient consolidation at filling step 1
At center At shoulder At toe
x = 0.00 x = 15.57 x = 21.10 Layer Hi
(m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) 1aOver 2 1 0.44 0.485 2.87 1aOver 3 1.5 0.44 0.485 4.31 1aOver 1.5 0.75 0.21 0.549 2.02
1a 2 9 0.93 0.417 3.10 1a 3 9.5 0.88 0.417 4.65 1aOver 3.5 6.25 0.61 0.417 5.42
1a 1 10.5 1.01 0.345 1.70 4b 0.5 11.25 0.99 0.795 0.56 1a 3 9.5 0.82 0.417 4.65
4b 2 12 1.11 0.67 2.44 4b 1.5 12.25 1.05 0.67 1.83 4b 1.5 11.75 0.96 0.795 1.68
4eXL 5 15.5 1.41 0.755 5.75 4eXL 5 15.5 1.34 0.755 5.75 4b 0.5 12.75 1.03 0.67 0.61
4e 4 20 1.83 0.755 4.60 4e 4.5 20.25 1.79 0.755 5.18 4eXL 5 15.5 1.29 0.755 5.75
4e 9.5 26.75 2.46 0.622 12.05 4e 5.5 25.25 2.26 0.622 6.97 4e 5 20.5 1.77 0.755 5.75
4e 1.5 32.25 4e 5 30.5 4e 2 24 2.10 0.622 2.54
4e 8 29
Total 31.50 41.81 Total 28.00 37.00 Total 25.00 32.74 Average coefficient consolidation C vtb = 5.68E-04 Average coefficient consolidation C vtb = 5.73E-04 Average coefficient consolidation C vtb = 5.83E-04
Calculation coefficient consolidation at filling step 2
At center At shoulder At toe
x = 0.00 x = 13.49 x = 21.10 Layer Hi
(m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) 1aOver 8 4 0.77 0.417 12.39 1aOver 8 4 0.70 0.417 12.39 1aOver 1.5 0.75 0.21 0.549 2.02
4b 2 12 1.24 0.67 2.44 1a 1.5 10.25 1.03 0.345 2.55 1aOver 3.5 6.25 0.62 0.417 5.42 4eXL 5 15.5 1.52 0.755 5.75 4b 2 12 1.14 0.67 2.44 1a 3 9.5 0.84 0.417 4.65 4e 3 19.5 1.88 0.755 3.45 4eXL 5 15.5 1.43 0.755 5.75 4b 1 11.5 0.97 0.795 1.12 4e 12 27 2.56 0.622 15.22 4e 3.5 19.75 1.83 0.755 4.03 4b 1 12.5 1.04 0.67 1.22
4e 11.5 27.25 2.53 0.622 14.58 4eXL 5 15.5 1.32 0.755 5.75
0 4e 4.5 1.78 0.755 5.18
0 0 4e 6.5 2.32 0.622 8.24
Total 33.00 44.36 Total 33.00 44.07 Total 29.00 37.92 Average coefficient consolidation C = 5.53E-04 Average coefficient consolidation C = 5.61E-04 Average coefficient consolidation C = 5.85E-04
v v
Trang 13Calculation coefficient consolidation at filling step 3
At center At shoulder At toe
x = 0.00 With berm x = 0.00 Layer Hi
(m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) 1aOver 2 1 0.95 0.417 3.10 1aOver 3 1.5 0.94 0.417 4.65 1aOver 1.5 0.75 0.21 0.549 2.02
1a 3 9.5 1.40 0.345 5.11 1a 3 9.5 1.29 0.345 5.11 1aOver 3.5 6.25 0.63 0.417 5.42 4b 2 12 1.52 0.67 2.44 4b 2 12 1.42 0.67 2.44 1a 3 9.5 0.87 0.417 4.65 4eXL 5 15.5 1.77 0.755 5.75 4eXL 5 15.5 1.69 0.755 5.75 4b 0.5 11.25 0.99 0.795 0.56 4e 0.5 18.25 2.00 0.755 0.58 4e 1 18.5 1.94 0.755 1.15 4b 1.5 12.25 1.06 0.67 1.83 4e 14.5 25.75 2.63 0.622 18.39 4e 14 26 2.60 0.622 17.75 4eXL 5 15.5 1.38 0.755 5.75
4e 4 20 1.83 0.755 4.60 4e 11 27.5 2.56 0.622 13.95 Total 33.00 45.58 Total 33.00 45.37 Total 33.00 43.10 Average coefficient consolidation Cvtb = 5.24E-04 Average coefficient consolidation Cvtb = 5.29E-04 Average coefficient consolidation Cvtb = 5.86E-04 Calculation coefficient consolidation at filling step 3 without berm
At center At shoulder At toe
x = 0.00 x = 0.00 x = 0.00 Layer Hi
(m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) Layer
Hi (m)
Hm (m)
(2σ vz +σ z )/2 (kg/cm2)
C vi
(10-3 cm2/s) 1aOver 4.5 2.25 0.88 0.417 6.97 1aOver 6 3 0.86 0.417 9.29 1aOver 1 0.5 0.19 0.549 1.35
1a 3 9.5 1.28 0.345 5.11 1a 3 9.5 1.15 0.345 5.11 1aOver 4 6 0.64 0.417 6.19 4b 2 12 1.41 0.67 2.44 4b 2 12 1.28 0.67 2.44 1a 3 9.5 0.89 0.417 4.65 4eXL 5 15.5 1.67 0.755 5.75 4eXL 5 15.5 1.56 0.755 5.75 4b 2 12 1.07 0.67 2.44 4e 1.5 18.75 1.94 0.755 1.73 4e 2.5 19.25 1.89 0.755 2.88 4eXL 5 15.5 1.40 0.755 5.75 4e 13.5 26.25 2.58 0.622 17.12 4e 12.5 26.75 2.56 0.622 15.85 4e 3.5 19.75 1.83 0.755 4.03
4e 11.5 27.25 2.56 0.622 14.58 Total 33.00 45.08 Total 33.00 44.73 Total 33.00 43.30 Average coefficient consolidation C = 5.36E-04 Average coefficient consolidation C = 5.44E-04 Average coefficient consolidation C = 5.81E-04
Trang 14Calculate factors of vertical drain
- Ratio between coefficient of permeability in horison and in vertical
Kh/Kv = 2.00
Kh/qw = 1.00E-08 cm-2
Consolidate degree at center
Final consolidate settlement in treated zone Sct (m) 1.08 0.30 0.00 Final consolidate settlement in untreated zone Scn (m) 0.18 0.06 0.00
outside sevicable settlement zone (m) 0.00 0.00 inside sevicable settlement zone S'cn (m) 0.18 0.06 0.00
* Consolidation after filling time of step 1
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03
Consolidation ratio in treated zone due to each filling height Ui 0.16
Con Settle untreated zone outside sevicable settlement zone (m) 0.00
(Method in aricle VI.4, VI.5 of standard 22TCN 262-2000)
Trang 15* Consolidation after waiting time of step 1
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03
Consolidation ratio in treated zone due to each filling height Ui 0.61
Consolidate settlement in treated zone at the end of step Sct1 (m) 0.65
Consolidate settlement in untreated zone at the end of step Scn1 (m) 0.01
Con Settle untreated zone inside sevicable settlement zone S'cn1 (m) 0.01
Consolidate settlement at the end of step Sc1 (m) 0.66
Consolidation ratio in treated zone at the end of step Ut1 0.61
* Consolidation after filling time of step 2
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04 5.53E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75 16.50
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03 1.11E-03
Consolidation ratio in treated zone due to each filling height Ui 0.65 0.06
Con Settle untreated zone inside sevicable settlement zone (m) 0.01 0.00
* Consolidation after waiting time of step 2
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04 5.53E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75 16.50
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03 1.11E-03
Consolidation ratio in treated zone due to each filling height Ui 0.79 0.43 Consolidate settlement in treated zone at the end of step Sct2 (m) 0.85 0.13 Consolidate settlement in untreated zone at the end of step Scn2 (m) 0.01 0.00 Con Settle untreated zone inside sevicable settlement zone S'cn2 (m) 0.01 0.00 Consolidate settlement at the end of step Sc2 (m) 0.86 0.13 Consolidation ratio in treated zone at the end of step Ut2 0.71
Trang 16* Consolidation after filling time of step 3
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04 5.53E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75 16.50
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03 1.11E-03
Consolidation ratio in treated zone due to each filling height Ui 0.85 0.58
Consolidate settlement in treated zone at the end of step Sct3 (m) 0.91 0.17
Consolidate settlement in untreated zone at the end of step Scn3 (m) 0.02 0.00
Con Settle untreated zone inside sevicable settlement zone S'cn3 (m) 0.02 0.00
Consolidate settlement at the end of step Sc3 (m) 0.93 0.17
Consolidation ratio in treated zone at the end of step Ut3 0.61
* Consolidation after waiting time of step 3
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04 5.53E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75 16.50
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03 1.11E-03
Consolidation ratio in treated zone due to each filling height Ui 0.93 0.80
Consolidate settlement in treated zone at the end of step Sct3 (m) 1.00 0.24
Consolidate settlement in untreated zone at the end of step Scn3 (m) 0.02 0.00
Con Settle untreated zone inside sevicable settlement zone S'cn3 (m) 0.02 0.00
Consolidate settlement at the end of step Sc3 (m) 1.01 0.24
Consolidation ratio in treated zone at the end of step Ut3 0.81
* Consolidation after construction 15 years
Average vertical consolidation coefficient Cvtb (cm2/s) 5.68E-04 5.53E-04 5.36E-04
H is the consolidation drainage depth in the vertical orientation H (m) 15.75 16.50 16.50
Average horizontal consolidation coefficient Chtb (cm2/s) 1.14E-03 1.11E-03 1.07E-03
Consolidation ratio in treated zone due to each filling height Ui 0.93 0.80 1.00 Consolidate settlement in treated zone at the end of step Sct (m) 1.00 0.24 0.18 Consolidate settlement in untreated zone at the end of step Scn (m) 0.02 0.00 0.08 Con Settle untreated zone inside sevicable settlement zone S'cn (m) 0.02 0.00 0.08 Consolidate settlement at the end of step Sc (m) 1.01 0.24 0.26 Consolidation ratio in treated zone at the end of step Ut3 0.90
Trang 17IV.3 Calculate development of undrainded strength through consolidation (Method in appendix F3 of Detailed Design)
(T/m2) (T/m2) (T/m2) σz (T/m2) U (%) Cu (T/m2) σz (T/m2) U (%) Cu (T/m2) σz (T/m2) U (%) Cu (T/m2)
m
Trang 181a 4b 4eXL
1aOver Side
1a Side 4b Side 4eXL Side
1aOver Cen
1a Cen 4b Cen 4eXL Cen
1aOver Side
1a Side 4b Side 4eXL Side
1aOver
1a 4b 4eXL
EB
1.388
CALCULATE SAFETY FACTOR AT SEGMENT CW2C-166(KM21+280-KM21+350) Ground is improved by Triangle filling step 2
Method Bishop
Height of filling embankment: 4.45m Width of filling upperbase: 26.98m Height of design embankment: 5.4m Width of designed upperbase: 20.6m Width of lowerbase: 42.2m
Fabric Capacity: 200 kN
3 layers
Name: 1aOver Unit Weight: 16.2 kN/m³ Cohesion': 14.4 kPa Name: 1a
Unit Weight: 16.2 kN/m³ Cohesion': 16.9 kPa Name: 4b
Unit Weight: 17.1 kN/m³ Cohesion': 17.6 kPa Name: 4eXL Unit Weight: 19.8 kN/m³ Cohesion': 49.5 kPa
Name: 1aOver Side Unit Weight: 16.2 kN/m³ Cohesion': 18.900912 kPa Name: 1a Side
Unit Weight: 16.2 kN/m³ Cohesion': 24.173439 kPa Name: 4b Side
Unit Weight: 17.1 kN/m³ Cohesion': 24.771878 kPa
Name: 4eXL Side Unit Weight: 19.8 kN/m³ Cohesion': 56.491396 kPa
Name: 1aOver Cen Unit Weight: 16.2 kN/m³ Cohesion': 22.731569 kPa Name: 1a Cen
Unit Weight: 16.2 kN/m³ Cohesion': 27.405272 kPa Name: 4b Cen
Unit Weight: 17.1 kN/m³ Cohesion': 27.767099 kPa Name: 4eXL Cen Unit Weight: 19.8 kN/m³ Cohesion': 59.111631 kPa
Name: EB Unit Weight: 19 kN/m³ Cohesion': 0 kPa Phi': 30 ° Phi-B: 0 °
Distance (m)
-20
-15
-10
-5
0
5
10