PLN Persero KfW Poko Dam of up to 140 m height, power conduit system of 2.6 km length with pressure shaft, cavern powerhouse and 2.3 km long tailrace tunnel Bakaru extension with 5.6 km
Trang 1CAMBODIA
Stung Chinit
Irrigation and Rural
Infrastructure,
Cambodia
Ministry of Water Resources and Meteorology, Phnom Penh Asian Development Bank (ADB), Manila
Rehabilitation of existing scheme to increase agricultural productivity by improvement
of infrastructure in and around the project area, formation and training of water user groups, cost recovery measures and strengthening of government staff Proposal for the irrigation
in the project area comprised the construction of a multi-purpose dam (irrigation, hydropower and flood attenuation), a pump station and a flood protection dike, together with a drainage pumping station
Feasibility studies including:
Technical field investigations (soils etc.) topographic survey (orthomapping with detailed strip survey; scale 1:5000), farmer community organisation and training, system operation studies, detailed design of irrigation and drainage works, preparation of tender documents, contract packaging, construction supervision, systems management training
Since 2001
Provincial Power
Supply
Phnom Penh,
Cambodia
Electricité du Cambodge (EDC) Asian
Development Bank (ADB)
Consultant services to assist EDC with the implementation
of the Provincial Power Supply Project (PPS), funded under ADB loan, to rehabilitate and extend the electricity systems
in eight provincial centres of Cambodia LI's terms of reference include diesel generation, environmental and hydrological tasks
Small diesel power stations:
Number of locations: 5 Number of units: 20 Unit capacity: 250 to 1000 kW Fuel: diesel oil
Site investigation; conceptual design; technical specification;
tendering and evaluation; site supervision; investigation of soil and groundwater contamination;
proposal of remedial and disposal measures; assessment
of related environmental risks;
estimation of cost related to remedial measures
2002-2004
Trang 2INDONESIA
Poko & Bakaru II
HEPs, Update of
Studies,
Indonesia
P.T PLN (Persero) KfW
Poko Dam of up to 140 m height, power conduit system
of 2.6 km length with pressure shaft, cavern powerhouse and 2.3 km long tailrace tunnel Bakaru extension with 5.6 km long headrace tunnel and 1.6
km long pressure shaft to existing powerhouse on Mamasa River
Update of Feasibility Study for Poko HPP,
Update of Feasibility Study/Detailed Design for 126
MW Bakaru II HPP Extension Project;
Condition Assessment and rehabilitation concept for existing 126 MW Bakaru I HPP
since 2014
Hydropower
Mamasa River
Potential Study,
Indonesia
potential hydropower projects
on Mamasa River upstream and downstream of existing hydropower projects; Design of
a new hydropower project with
a 4.6 km long headrace tunnel,
600 m long pressure shaft and
2 x 70 MW capacity in shaft powerhouse
Masterplan level analysis of hydropower potential, pre-feasibility design of two potential hydropower projects with an installed capacity above 100 MW
on Mamasa River, integration of potential projects in system extension planning study
since 2014
Update Existing
Studies Small HEPs,
Indonesia
P.T PLN (Persero) KfW
9 small hydropower sites, Capacity: 0.5 MW to 4 MW Head: 10 m to 140 m Discharge: 0.75 m³/s to 35 m³/s Turbine Types: Francis, Pelton, Kaplan
Review of existing Feasibility Studies,
Evaluation and selection of most promising sites, Additional topographical and geological investigations, Update of Feasibility Studies for 4 to 5 sites
since 2014
Pumped Storage
Power Plant,
Sumatra (Site
Selection Study),
Indonesia
P.T PLN (Persero) KfW
Storage power plants with cavern powerhouses housing 2 pump turbines of 200 MW each, with heads varying between 400 m and 640 m
Survey of the island Sumatra for identification of sites, which are suitable for the development of pumped storage plants The projects shall be capable of providing at least 400 MW power over a continuous time of four hours to the electric grid
Conceptual designs including cost estimates and economic assessments shall be elaborated for 8 selected projects
since 2014
Trang 3Consultancy
Services of Quality
Assurance and
Quality Control for
Three Coal Fired
Power Plant
Projects, Indonesia
PT PLN (Persero), Indonesia
Capacity:
Indramayu PP (Jawa Barat) :
Palabuhanratu PP (Jawa Barat) :
Tanjung Awar-Awar PP (Jawa Timur) :
Fuel : lignite coal
Design review and approval, progress and design meetings, workshop inspections and tests, supervision and monitoring of project execution, procurement, construction and commissioning, home office back up services, guarantee period
2007-2016
Market Study on the
Power Supply Sector
in Indonesia
ETA – Power Projects Division, Dubai UAE
In-depth market sector study covering a broad field of services with regard to Indonesia’s overall power sector set-up However, assessing in particular the current status and expected future development of large-scale thermal power plants as well as new power plant projects to be implemented
Special objective is hence to identify promising market entry options for potential
Independent Power Producers (IPP)
Overview on electricity policy and institutional setting, present state of power supply system, development of electricity demand, electricity tariffs, new power plant projects
2008
Trang 4Bengkulu Water
Supply Project,
Training Program in
Operation and
Maintenance,
Indonesia
PDAM Water Enterprise of Bengkulu City, Indonesia
Training for O & M staff responsible for water treatment, water resources protection, mechanical and electrical equipment, trunk mains and distribution system service connections, warehouse and repair shops
Training included the following topics:
Quality and strategic management (including subjects as
documentation, monitoring, indicators and targets, record keeping, corrective and preventive actions), water production (coagu-lation floccu(coagu-lation, filtration, disinfection, chemical storage, water quality tests), electrical - mechanical equipment, instrumen-tation - service, operation calibration emergency measures, distribution network (installation and repair, leakage control and leak detection, metering and meter control/testing, repair and calibration
2002-2004
LAOS
Nam Theun II,
Laos
Nam Theun Electricity Consortium (private ownership company)
Storage power plant, installed capacity: 1,074 MW, 6 Francis turbines, design head: 348 m, RCC dam, height 48 m with
pressure tunnel and 130 km long transmission line to Thailand
Review of project design, tender documents, technical and contractual assistance to owner, construction supervision
Since 2000
MALAYSIA
1,000-1,400 MW Prai
IPP,
Technical Advisory
Services,
Malaysia
Amcorp Power Sdn Bhd, Malaysia
Electrical Output, Total Plant 1,000-1,400 MW Type Power Generation:
Combined Cycle Plant Configuration:
multiple blocks, multi- or single-shaft arrangement Gas Turbine Class:
Large Scale Fuel: Natural Gas / Distillate
Analysis of the RfP, participation
at site visit & pre-bid conference, thermodynamic calculations, development of techno-economic model, Plant optimisation study for main GT models, elaboration of Plant optimization report
2012
Trang 5Megasteel
Integrated Power
Plant,
Malaysia
Megasteel Sdn
Bhd., Malaysia
Integrated Power Plant: 420
MW
2 Gas Fired Boilers: 2x90 MW Fuel: BFG and COG
Boiler Turbine Generation Plant:
2 x 135 MW Fuel: COG, coal & coke dusts and
supplementary bituminous (thermal) coal
Phase 1: Pre-Tendering Phase:
Data collection and review, conceptual design and implementation plan, grid study
Phase 2: Tendering Phase:
Invitation to bid, bidding period, evaluation of bid proposals, contract negotiations
2007-2008
MYANMAR
Power
Storage power plant, open-air powerhouse, L/H/W 102 m/57 m/38 m installed capacity: 280 MW,
4 Francis turbines headrace tunnels, D/L 10.0-12.5
m / 2 x 500 m RCC dam height 90 m / crest length 243 m
Review of existing basic design, elaboration of construction design, supervision and quality control, on-the-job training of counterpart engineers
2013-2018
Technical
PPP-Advisor,
Myanmar
Deloitte Touche Tohmatsu India Private Limited
Capacity Building project to allow the executing agencies to implement and monitor large-scale IPP projects in the electricity generation sector
Setting Framework Conditions (i.e defining key parameters, development minimum functional specifications, environmental compliance specifications to be considered in PPP ICB
documentation) Project Screening, Evaluation and Prioritization of Potential Project Candidates
Support Development of Preliminary Project Profiles (i.e
pre-feasibility Studies of 5 candidate projects)
2014-2015
Trang 6PHILIPPINES
Ninoy Aquino
International Airport,
Manila,
Philippines
Philippine International Air Terminals Co., Inc
(PIATCO), Manila
BOT of a new International Passenger Terminal
Review of the EPC-contractors detail design drawings, supervision of construction of the EPC-contract, contract
administration, claims management, quality management
2000-2008
THAILAND
Promoting
Renewable Energy,
Clean Fuels, and
Energy Efficiency in
the Greater Mekong
Subregion,
Thailand
Asian Development Bank
Technical support to the Sub-regional Energy Forum to safeguard the realization of the GMS Road Map for Expanded Cooperation in the Energy Sector and promote capacity building in the GMS countries in renewable energy, clean fuels, and energy efficiency policy, plan, and program formulation
Knowledge sharing facilitation in the GMS and SEF organization
RE, EE, clean energy and climate change studies
Knowledge dissemination Strengthening SEF capacity and knowledge sharing
Establishment of regional database
Best practice studies
Review of national performance targets
Preparation of regional performance targets
Renewable energy and clean energy resource assessment
Energy efficiency potential assessment
Renewable energy, energy efficiency and clean energy resource maps
Project pipeline preparation
Business model concepts and suitability
Initiation of Pilot projects
2011-2012
Trang 7Rojana,
Thailand
Rojana Power Co Ltd
Gross Electrical Capacity:
289 MWel Gas Turbines:
5 x GE LM 6000 PC Air inlet Chillers: 7 °C HRSG: 5 x Dual Pressure Steam Turbine:
2 x Dual Pressure Process Steam: 15 bar, sat
Cooling System:
3 x Wet Cooling Tower Auxiliary Boiler 41 t/h, 15 bar
After Extension Phase 5:
Gross Electrical Capacity:
344 MWe Gas Turbine
6 x GE LM 6000 PC HRSG: 6 x Dual Pressure
Extension Phase 5:
EPC-Contract overview, Lender’s Due Diligence Report including review of the Plant Design and the Performance Guarantees and Testing provisions
Extension Phase 4 (2007-09):
Design review, site supervision, commissioning supervision
Extension Phase 3 (2005-06):
Design review, site supervision, commissioning supervision
Extension Phase 2 (2001-03):
Negotiation, design review, site supervision, commissioning supervision
Plant: (1996-99):
Review of EPC-proposal, assistance in contract preparation, design review and approval, site supervision of erection, commissioning and performance testing
2010-2011
Bangkok Metro,
Thailand
Metropolitan Rapid Transit
Authority (MRTA), Bangkok
Construction of a new underground metro system, length 20 km
Design and construction supervision of civil works,
E & M equipment design, interface co-ordination
1998-2005
Trang 8VIETNAM
Wind Data Analysis
and Energy
Generation
Assessment
Landville Energy Co., Ltd
Technical assistance to Landville Energy Co., Ltd to assess the feasibility of the project
Preparation of independent bankable wind resource assessment considering two on-site met masts; CFD flow modelling; layout optimisation and micro-siting for three lots, site classification and
recommendation of suitable wind turbine equipment
2015
Restructuring and
Divestiture Strategy
for Electricity's
Gencos,
Vietnam
comprehensive strategy for completing the de-integration
of generation through operational and financial restructuring of the Gencos and to divest its assets/share ownership in these companies
Market assessment of GENCOs (legal, regulatory, policy) Governance assessment (management and legal) Organisational review Financial assessment Operational and technical assessment
Preparation and implementation
of capacity building program Development of capital investment program specifically for IPPs and BOTs
2014-2015
Improvement of
Energy Efficiency in
Rural Areas Project,
Vietnam
Vietnam Electricity (EVN)
Rehabilitate and upgrade of the medium voltage, low voltage distribution networks in areas
of Northern, Centre and Southern Power Corporation
Assistance to EVN/PCs to ensure that the tender procedures for equipment and civil works and the award of contracts are in line with the Banks guidelines
Review/ Verification of Bid Evaluation Reports; Assistance in Contract Negotiations; Review/
Verification of Contracts; Review
of Test Reports of Material and Equipment; Attendance at Quality Tests (FAT); Check of Civil Works and Installation; Final Acceptance of Civil Works and Installation; Prevention and Mitigation Measures for the Environmental Impact; Review of Implementation Progress;
Reporting
2012-2015
Trang 9Feasibility Study
Wind Energy on Phu
Quoc Island Kein
Giang,
Vietnam
Electricity of Vietnam Power Company No 2
Feasibility study seeking a possibility of building up wind farm(s) in the Island between
2005 and 2010
Main data:2 existing Diesel power stations: 7 MW (total installed capacity)
Additional DO/HFO fired generation (end 2005): 5 MW Existing distribution network::
OH; 22kV (MV); 0.4kV (LV) Forecasted total demand by the end of 2010: 50 MW
Wind Resource Assessment (Identification of the five most promising locations), site selection, wind park concept and basic calculation of specific electricity generation Phase II:
Conceptual design:
Power demand analysis, electrical grid qualitative analysis, optimization of the wind park layout, EIA and resettlement plan, economic and financial analysis and implementation plan, training and capacity building
2005-2007
500 kV Transmission
Line Pleiku-Phu Lam,
Vietnam
Electricity of Vietnam, Central Vietnam Power Projects Management Board
540 km of 500 kV transmission line, extension of two 500 kV substations, 500 kV series capacitor compensation, 500
kV shunt parallel compensation, power line carrier and fibre optical communication
Study, review of design, preparation of tender documents, bid evaluation, factory acceptance tests, supervision of construction and commissioning, training
2000-2004
SOUTH KOREA (Wind)
Hasari 2 (Baeksu)
Wind Farm,
South Korea
Yeonggwang Baeksu Wind Power CO
study and AEP assessment
2014
Trang 10Feasibility Study
Support for Boseong
20MW Wind Farm
Korea Engineering Consultants Co., Ltd
review, Energy Yield Estimates review:
Review of wind resource assessment (wind data analysis and study based on existing on-site mast, uncertainties) Review
of wind farm layout, energy calculations with losses and uncertainties;
Grid Connection Concept review (internal cabling concept, grid integration concept), Civil Topics review (soil type, foundation type, access roads, transport and installation concept); Economic Analysis review
2014
Goseong Alps Wind
Farm
support for WTG
Tendering services including the preparation of tender documents for international bidding of the Wind turbine lot, clarification with bidders, bid evaluation and support for contract negotiations with the preferred bidders
2014-2015
Technical Advisory
Services for Hasari 3
(Yaksu) Wind Farm
Project, Korea
Yeonggwang Yaksu Wind Power
CO
study and AEP assessment, Technical due diligence, review
of conceptual wind farm design and implementation and operation plans, review of Turbine Supply Agreement and O&M Agreement
2014-2015
Jeongamg Wind
Farm,
South Korea
Korea Ratings, South Korea
Wind resource assessment and energy yield estimation
Site investigation; wind data evaluation; long-term correlation; wind field modelling advanced CFD; layout
optimisation and micro-siting;
2013
Daegwallyeong
Wind Farm,
South Korea
Daegwallyeong Wind Power Co., Ltd.,
Korea
description; data collection and review; wind resource
assessment; wind farm layout;
energy production calculation;
civil engineering topics;
estimation of project costs;