PLN Persero KfW Poko Dam of up to 140 m height, power conduit system of 2.6 km length with pressure shaft, cavern powerhouse and 2.3 km long tailrace tunnel Bakaru extension with 5.6 km

Trang 1

CAMBODIA

Stung Chinit

Irrigation and Rural

Infrastructure,

Cambodia

Ministry of Water Resources and Meteorology, Phnom Penh Asian Development Bank (ADB), Manila

Rehabilitation of existing scheme to increase agricultural productivity by improvement

of infrastructure in and around the project area, formation and training of water user groups, cost recovery measures and strengthening of government staff Proposal for the irrigation

in the project area comprised the construction of a multi-purpose dam (irrigation, hydropower and flood attenuation), a pump station and a flood protection dike, together with a drainage pumping station

Feasibility studies including:

Technical field investigations (soils etc.) topographic survey (orthomapping with detailed strip survey; scale 1:5000), farmer community organisation and training, system operation studies, detailed design of irrigation and drainage works, preparation of tender documents, contract packaging, construction supervision, systems management training

Since 2001

Provincial Power

Supply

Phnom Penh,

Cambodia

Electricité du Cambodge (EDC) Asian

Development Bank (ADB)

Consultant services to assist EDC with the implementation

of the Provincial Power Supply Project (PPS), funded under ADB loan, to rehabilitate and extend the electricity systems

in eight provincial centres of Cambodia LI's terms of reference include diesel generation, environmental and hydrological tasks

Small diesel power stations:

Number of locations: 5 Number of units: 20 Unit capacity: 250 to 1000 kW Fuel: diesel oil

Site investigation; conceptual design; technical specification;

tendering and evaluation; site supervision; investigation of soil and groundwater contamination;

proposal of remedial and disposal measures; assessment

of related environmental risks;

estimation of cost related to remedial measures

2002-2004

Trang 2

INDONESIA

Poko & Bakaru II

HEPs, Update of

Studies,

Indonesia

P.T PLN (Persero) KfW

Poko Dam of up to 140 m height, power conduit system

of 2.6 km length with pressure shaft, cavern powerhouse and 2.3 km long tailrace tunnel Bakaru extension with 5.6 km long headrace tunnel and 1.6

km long pressure shaft to existing powerhouse on Mamasa River

Update of Feasibility Study for Poko HPP,

Update of Feasibility Study/Detailed Design for 126

MW Bakaru II HPP Extension Project;

Condition Assessment and rehabilitation concept for existing 126 MW Bakaru I HPP

since 2014

Hydropower

Mamasa River

Potential Study,

Indonesia

potential hydropower projects

on Mamasa River upstream and downstream of existing hydropower projects; Design of

a new hydropower project with

a 4.6 km long headrace tunnel,

600 m long pressure shaft and

2 x 70 MW capacity in shaft powerhouse

Masterplan level analysis of hydropower potential, pre-feasibility design of two potential hydropower projects with an installed capacity above 100 MW

on Mamasa River, integration of potential projects in system extension planning study

since 2014

Update Existing

Studies Small HEPs,

Indonesia

P.T PLN (Persero) KfW

9 small hydropower sites, Capacity: 0.5 MW to 4 MW Head: 10 m to 140 m Discharge: 0.75 m³/s to 35 m³/s Turbine Types: Francis, Pelton, Kaplan

Review of existing Feasibility Studies,

Evaluation and selection of most promising sites, Additional topographical and geological investigations, Update of Feasibility Studies for 4 to 5 sites

since 2014

Pumped Storage

Power Plant,

Sumatra (Site

Selection Study),

Indonesia

P.T PLN (Persero) KfW

Storage power plants with cavern powerhouses housing 2 pump turbines of 200 MW each, with heads varying between 400 m and 640 m

Survey of the island Sumatra for identification of sites, which are suitable for the development of pumped storage plants The projects shall be capable of providing at least 400 MW power over a continuous time of four hours to the electric grid

Conceptual designs including cost estimates and economic assessments shall be elaborated for 8 selected projects

since 2014

Trang 3

Consultancy

Services of Quality

Assurance and

Quality Control for

Three Coal Fired

Power Plant

Projects, Indonesia

PT PLN (Persero), Indonesia

Capacity:

Indramayu PP (Jawa Barat) :

Palabuhanratu PP (Jawa Barat) :

Tanjung Awar-Awar PP (Jawa Timur) :

Fuel : lignite coal

Design review and approval, progress and design meetings, workshop inspections and tests, supervision and monitoring of project execution, procurement, construction and commissioning, home office back up services, guarantee period

2007-2016

Market Study on the

Power Supply Sector

in Indonesia

ETA – Power Projects Division, Dubai UAE

In-depth market sector study covering a broad field of services with regard to Indonesia’s overall power sector set-up However, assessing in particular the current status and expected future development of large-scale thermal power plants as well as new power plant projects to be implemented

Special objective is hence to identify promising market entry options for potential

Independent Power Producers (IPP)

Overview on electricity policy and institutional setting, present state of power supply system, development of electricity demand, electricity tariffs, new power plant projects

2008

Trang 4

Bengkulu Water

Supply Project,

Training Program in

Operation and

Maintenance,

Indonesia

PDAM Water Enterprise of Bengkulu City, Indonesia

Training for O & M staff responsible for water treatment, water resources protection, mechanical and electrical equipment, trunk mains and distribution system service connections, warehouse and repair shops

Training included the following topics:

Quality and strategic management (including subjects as

documentation, monitoring, indicators and targets, record keeping, corrective and preventive actions), water production (coagu-lation floccu(coagu-lation, filtration, disinfection, chemical storage, water quality tests), electrical - mechanical equipment, instrumen-tation - service, operation calibration emergency measures, distribution network (installation and repair, leakage control and leak detection, metering and meter control/testing, repair and calibration

2002-2004

LAOS

Nam Theun II,

Laos

Nam Theun Electricity Consortium (private ownership company)

Storage power plant, installed capacity: 1,074 MW, 6 Francis turbines, design head: 348 m, RCC dam, height 48 m with

pressure tunnel and 130 km long transmission line to Thailand

Review of project design, tender documents, technical and contractual assistance to owner, construction supervision

Since 2000

MALAYSIA

1,000-1,400 MW Prai

IPP,

Technical Advisory

Services,

Malaysia

Amcorp Power Sdn Bhd, Malaysia

Electrical Output, Total Plant 1,000-1,400 MW Type Power Generation:

Combined Cycle Plant Configuration:

multiple blocks, multi- or single-shaft arrangement Gas Turbine Class:

Large Scale Fuel: Natural Gas / Distillate

Analysis of the RfP, participation

at site visit & pre-bid conference, thermodynamic calculations, development of techno-economic model, Plant optimisation study for main GT models, elaboration of Plant optimization report

2012

Trang 5

Megasteel

Integrated Power

Plant,

Malaysia

Megasteel Sdn

Bhd., Malaysia

Integrated Power Plant: 420

MW

2 Gas Fired Boilers: 2x90 MW Fuel: BFG and COG

Boiler Turbine Generation Plant:

2 x 135 MW Fuel: COG, coal & coke dusts and

supplementary bituminous (thermal) coal

Phase 1: Pre-Tendering Phase:

Data collection and review, conceptual design and implementation plan, grid study

Phase 2: Tendering Phase:

Invitation to bid, bidding period, evaluation of bid proposals, contract negotiations

2007-2008

MYANMAR

Power

Storage power plant, open-air powerhouse, L/H/W 102 m/57 m/38 m installed capacity: 280 MW,

4 Francis turbines headrace tunnels, D/L 10.0-12.5

m / 2 x 500 m RCC dam height 90 m / crest length 243 m

Review of existing basic design, elaboration of construction design, supervision and quality control, on-the-job training of counterpart engineers

2013-2018

Technical

PPP-Advisor,

Myanmar

Deloitte Touche Tohmatsu India Private Limited

Capacity Building project to allow the executing agencies to implement and monitor large-scale IPP projects in the electricity generation sector

Setting Framework Conditions (i.e defining key parameters, development minimum functional specifications, environmental compliance specifications to be considered in PPP ICB

documentation) Project Screening, Evaluation and Prioritization of Potential Project Candidates

Support Development of Preliminary Project Profiles (i.e

pre-feasibility Studies of 5 candidate projects)

2014-2015

Trang 6

PHILIPPINES

Ninoy Aquino

International Airport,

Manila,

Philippines

Philippine International Air Terminals Co., Inc

(PIATCO), Manila

BOT of a new International Passenger Terminal

Review of the EPC-contractors detail design drawings, supervision of construction of the EPC-contract, contract

administration, claims management, quality management

2000-2008

THAILAND

Promoting

Renewable Energy,

Clean Fuels, and

Energy Efficiency in

the Greater Mekong

Subregion,

Thailand

Asian Development Bank

Technical support to the Sub-regional Energy Forum to safeguard the realization of the GMS Road Map for Expanded Cooperation in the Energy Sector and promote capacity building in the GMS countries in renewable energy, clean fuels, and energy efficiency policy, plan, and program formulation

Knowledge sharing facilitation in the GMS and SEF organization

RE, EE, clean energy and climate change studies

Knowledge dissemination Strengthening SEF capacity and knowledge sharing

Establishment of regional database

Best practice studies

Review of national performance targets

Preparation of regional performance targets

Renewable energy and clean energy resource assessment

Energy efficiency potential assessment

Renewable energy, energy efficiency and clean energy resource maps

Project pipeline preparation

Business model concepts and suitability

Initiation of Pilot projects

2011-2012

Trang 7

Rojana,

Thailand

Rojana Power Co Ltd

Gross Electrical Capacity:

289 MWel Gas Turbines:

5 x GE LM 6000 PC Air inlet Chillers: 7 °C HRSG: 5 x Dual Pressure Steam Turbine:

2 x Dual Pressure Process Steam: 15 bar, sat

Cooling System:

3 x Wet Cooling Tower Auxiliary Boiler 41 t/h, 15 bar

After Extension Phase 5:

Gross Electrical Capacity:

344 MWe Gas Turbine

6 x GE LM 6000 PC HRSG: 6 x Dual Pressure

Extension Phase 5:

EPC-Contract overview, Lender’s Due Diligence Report including review of the Plant Design and the Performance Guarantees and Testing provisions

Extension Phase 4 (2007-09):

Design review, site supervision, commissioning supervision

Extension Phase 3 (2005-06):

Design review, site supervision, commissioning supervision

Extension Phase 2 (2001-03):

Negotiation, design review, site supervision, commissioning supervision

Plant: (1996-99):

Review of EPC-proposal, assistance in contract preparation, design review and approval, site supervision of erection, commissioning and performance testing

2010-2011

Bangkok Metro,

Thailand

Metropolitan Rapid Transit

Authority (MRTA), Bangkok

Construction of a new underground metro system, length 20 km

Design and construction supervision of civil works,

E & M equipment design, interface co-ordination

1998-2005

Trang 8

VIETNAM

Wind Data Analysis

and Energy

Generation

Assessment

Landville Energy Co., Ltd

Technical assistance to Landville Energy Co., Ltd to assess the feasibility of the project

Preparation of independent bankable wind resource assessment considering two on-site met masts; CFD flow modelling; layout optimisation and micro-siting for three lots, site classification and

recommendation of suitable wind turbine equipment

2015

Restructuring and

Divestiture Strategy

for Electricity's

Gencos,

Vietnam

comprehensive strategy for completing the de-integration

of generation through operational and financial restructuring of the Gencos and to divest its assets/share ownership in these companies

Market assessment of GENCOs (legal, regulatory, policy) Governance assessment (management and legal) Organisational review Financial assessment Operational and technical assessment

Preparation and implementation

of capacity building program Development of capital investment program specifically for IPPs and BOTs

2014-2015

Improvement of

Energy Efficiency in

Rural Areas Project,

Vietnam

Vietnam Electricity (EVN)

Rehabilitate and upgrade of the medium voltage, low voltage distribution networks in areas

of Northern, Centre and Southern Power Corporation

Assistance to EVN/PCs to ensure that the tender procedures for equipment and civil works and the award of contracts are in line with the Banks guidelines

Review/ Verification of Bid Evaluation Reports; Assistance in Contract Negotiations; Review/

Verification of Contracts; Review

of Test Reports of Material and Equipment; Attendance at Quality Tests (FAT); Check of Civil Works and Installation; Final Acceptance of Civil Works and Installation; Prevention and Mitigation Measures for the Environmental Impact; Review of Implementation Progress;

Reporting

2012-2015

Trang 9

Feasibility Study

Wind Energy on Phu

Quoc Island Kein

Giang,

Vietnam

Electricity of Vietnam Power Company No 2

Feasibility study seeking a possibility of building up wind farm(s) in the Island between

2005 and 2010

Main data:2 existing Diesel power stations: 7 MW (total installed capacity)

Additional DO/HFO fired generation (end 2005): 5 MW Existing distribution network::

OH; 22kV (MV); 0.4kV (LV) Forecasted total demand by the end of 2010: 50 MW

Wind Resource Assessment (Identification of the five most promising locations), site selection, wind park concept and basic calculation of specific electricity generation Phase II:

Conceptual design:

Power demand analysis, electrical grid qualitative analysis, optimization of the wind park layout, EIA and resettlement plan, economic and financial analysis and implementation plan, training and capacity building

2005-2007

500 kV Transmission

Line Pleiku-Phu Lam,

Vietnam

Electricity of Vietnam, Central Vietnam Power Projects Management Board

540 km of 500 kV transmission line, extension of two 500 kV substations, 500 kV series capacitor compensation, 500

kV shunt parallel compensation, power line carrier and fibre optical communication

Study, review of design, preparation of tender documents, bid evaluation, factory acceptance tests, supervision of construction and commissioning, training

2000-2004

SOUTH KOREA (Wind)

Hasari 2 (Baeksu)

Wind Farm,

South Korea

Yeonggwang Baeksu Wind Power CO

study and AEP assessment

2014

Trang 10

Feasibility Study

Support for Boseong

20MW Wind Farm

Korea Engineering Consultants Co., Ltd

review, Energy Yield Estimates review:

Review of wind resource assessment (wind data analysis and study based on existing on-site mast, uncertainties) Review

of wind farm layout, energy calculations with losses and uncertainties;

Grid Connection Concept review (internal cabling concept, grid integration concept), Civil Topics review (soil type, foundation type, access roads, transport and installation concept); Economic Analysis review

2014

Goseong Alps Wind

Farm

support for WTG

Tendering services including the preparation of tender documents for international bidding of the Wind turbine lot, clarification with bidders, bid evaluation and support for contract negotiations with the preferred bidders

2014-2015

Technical Advisory

Services for Hasari 3

(Yaksu) Wind Farm

Project, Korea

Yeonggwang Yaksu Wind Power

CO

study and AEP assessment, Technical due diligence, review

of conceptual wind farm design and implementation and operation plans, review of Turbine Supply Agreement and O&M Agreement

2014-2015

Jeongamg Wind

Farm,

South Korea

Korea Ratings, South Korea

Wind resource assessment and energy yield estimation

Site investigation; wind data evaluation; long-term correlation; wind field modelling advanced CFD; layout

optimisation and micro-siting;

2013

Daegwallyeong

Wind Farm,

South Korea

Daegwallyeong Wind Power Co., Ltd.,

Korea

description; data collection and review; wind resource

assessment; wind farm layout;

energy production calculation;

civil engineering topics;

estimation of project costs;

2013-2014

Ngày đăng: 15/10/2017, 08:47

TỪ KHÓA LIÊN QUAN

🧩 Sản phẩm bạn có thể quan tâm