Exclude all glass canopy Storey •Note that consultants input is still being fine tuned at basement for M+E spaces, car park provision will be further adjust based on M&E provision @ base
Trang 1B erjaya V ietnam F inancial C entre
@ HCMC Vietnam
Schematic Design Report : 18 SEPTEMBER 2015
Trang 23KM
Trang 3NEW RETENTION POND LAND AREA = 10,000 SQM NEW RETENTION POND AREA (WATERBODY) = 7,729 SQM NEW RETENTION POND VOLUME = 15,990 M3 NEW RETENTION POND DEPTH = 2.53 M
Trang 4APPROVED PLANNING DATA
•Plot Ratio : 1 : 7.33
•Land Area : 6.64 Hectare / 16.40 Acre / 66,388 sqm
•Site Coverage : 31.23% ; building plinth 20,733 sqm
•Gross Floor Area : 486,624 sqm
•Building Height : 48/46/45 Storeys (248.0M, 207.0M & 195.3M)
DETAILED MASTERPLAN 1:500 APPROVAL 3 MARCH 2011
BY DEPARTMENT OF PLANNING & ARCHITECTURE PEOPLE’S COMMITTEE OF HO CHI MINH CITY BASIC DESIGN APPROVAL 13 MAY 2011
BY MINISTRY OF CONSTRUCTION
Trang 5DOUNG 2 THANG 3 STREET ENTRY-30M
LE HONG PHONG
STREET ENTRY-30M
CAO THANG STREET ENTRY-20M
200M
NEW EXCHANGE BOULEVARD ENTRY-20M
ROAD-185M
Trang 6Exclude all glass canopy Storey
•Note that consultants input is still being fine tuned at basement for M+E spaces, car park provision will be further adjust based on M&E provision @ basement & elevated car park
Trang 7
PHASE 1 PHASE 2 PHASE 3 Storey
•Note that consultants input is still being fine tuned at basement for M+E spaces, car park provision will be further adjust based on M&E provision @ basement & elevated car park
Trang 8Component NFA (SQM) Room/Unit Vietnam Code
Basement 1 for Tower 1 4.2 m 66 - Phase 2
Basement 1 for Tower 2 4.2 m 65 - Phase 3
Basement 1 for Tower 3 4.2 m 90 - Phase 3
Basement 1 for Tower 4 4.2 m 102 - Phase 2
Basement 2 for Tower 1 3.6 m 70 - Phase 2
Based on Net Floor Area count - based on local code provided by Invescons
•Note that consultants input is still being fine tuned at basement for M+E spaces, car park provision will be further adjust based on M&E provision @ basement & elevated car park
Trang 9(40 + 8 Storey)
48 Storey – 204.2M
PHASE 2 PHASE 2
TOWER 1 – HOTEL + RESIDENCES
48 Storey – 204.2M
SHOPPING MALL
2 Storey Basement Car Park
8 Storey Retail Podium +
PHASE 1
2 Basement Car Park
2 Basement Car Park
2 Basement Car Park
2 Basement Car Park
4 Storey Elevated Car Park (Part) +
(40 + 8 Storey)
Trang 10SHOPPING MALL PHASE 1
PHASE 3TOWER 2 SERVICED SUITES
Trang 11LEVEL 5-7 CAR PARK = 3.0M BASEMENT 1 = 5.1M / 4.2M BASEMENT 2 = 3.6 M
Trang 14FUTURE CONNECTION
FUTURE CONNECTION
Trang 15P2 = 168 P3 = 155
No of Motorcycle park = 652
BASEMENT 1M Floor Height = 3.0M
No of Motorcycle park = 483
Trang 17Floor Height = 4.8M
Trang 18Floor Height = 4.8M
Trang 20Floor Height = 4.8M / 3.0M
No of Carpark
P1 = 231 (96+135)
Trang 21Floor Height = 4.8M / 3.0M
No of Carpark
P1 = 231 (96+135)
Trang 22Floor Height = 4.8M / 3.0M
No of Carpark
P1 = 231 (96+135)
Trang 23Floor Height = 7.8M
Trang 24TOWER 2 – S SUITES PHASE 3
(40 + 8 Storey)
48 Storey – 204.2M
PHASE 2 PHASE 2
TOWER 1 – HOTEL + RESIDENCES
48 Storey – 204.2M (40 + 8 Storey)
Trang 25VFC LAKE
SHOPPING MALL
2 Storey Basement Car Park
8 Storey Retail Podium + PHASE 1
4 Storey Elevated Car Park (Part) +
Trang 26PHASE 2 (40 + 8 Storey)
48 Storey – 225.8M PHASE 2
Trang 27TOWER 3 – OFFICEPHASE 3
Trang 28VIEW FROM DOUNG 3 THANG 2
Trang 29VIEW FROM LE HONG PHONG
STREET
Trang 30VIEW FROM CAO THANG STREET
Trang 31VIEW FROM VFC LAKE
Trang 32DUONG 3 THANG 2 STREET ELEVATION
Trang 33LE HONG PHONG STREET ELEVATION
Trang 34CAO THANG STREET ELEVATION
Trang 35HOANG DAO KHOANG STREET ELEVATION
Trang 36VFC LAKE
Trang 44CONCEPT IMAGES